COMMON PROJECT ATTRIBUTES

REPORT

Project title <please insert text>

Status of cost and/or carbon emissions report <please select from dropdown>

Date of cost and/or carbon emissions report <please insert text>

Revision number of cost and/or carbon emissions report <please insert text>

Brief description of the Project <please insert text>

• client’s name <please insert text>

• brief scope <please insert text>

Location and country <please insert country>

<please insert location of site(s)>

Project type Offshore structures


COMMON PROJECT ATTRIBUTES

CONSTRUCTION COST PRICE LEVEL


Currency EUR

Base date of costs (if individual cost is exclusive of Price Level <please insert text>
Adjustments after that date)
Price basis <please select from dropdown>

CONSTRUCTION PROGRAMME
Project status <please select from dropdown>

Construction period

• number of months <please insert text>

• start date <please insert text>

start date (planned or actual) <please select from dropdown>



• end date <please insert text>

end date (planned or actual) <please select from dropdown>



COMMON PROJECT ATTRIBUTES

SITE
Existing site status

• state of use <please select from dropdown>



• type of use <please select from dropdown>

Legal status of site <please select from dropdown>

<please insert text if 'other stated' has been selected above>

Site topography <please select from dropdown>



<please insert text if 'other stated' has been selected above>

Ground conditions (predominant) <please select from dropdown>



Seismic zones (state more than one if applicable based on <please insert text>
location)

Site conditions and constraints:

• access problems <please select from dropdown>



• extreme climatic conditions <please select from dropdown>

• environmental constraints <please select from dropdown>

• statutory planning constraints <please select from dropdown>

• archaeology <please select from dropdown>

COMMON PROJECT ATTRIBUTES

CONSTRUCTION PROCUREMENT
Funding <please select from dropdown>

Project delivery

• pricing method lump sum

• mode of procurement <please select from dropdown>



• joint venture foreign Constructor <please select from dropdown>

• predominant source of Constructors <please select from dropdown>

Note: The Life Cycle Costs section of the ICMS standard attributes is optional at the
LIFE CYCLE COST RELATED present time.
Life cycle costing

• purpose <please select from dropdown>



• method of presentation of costs Net present value

• common date (to which all costs are discounted or compounded) <please insert text>

• project status at common date <please select from dropdown>



• Nominal discount rate % per annum (excludes inflation) <please insert text>

• Escalation rate % per annum <please insert text>

• Real discount rate % per annum (includes inflation) <please insert text>

Expected constructed asset life span after completion of construction <please select from dropdown>

COMMON PROJECT ATTRIBUTES

<please insert text>


Period of analysis for life cycle costing

• until <please select from dropdown>



• from <please insert date>

• to <please insert date>

• number of months | years <please insert number of months and years>

Primary usage type constraints affecting expected life and life


cycle costs (if applicable)
• hours of operation (e.g. office hours 9:00 to 17:30 Monday <please insert text>
to Friday)
• access restrictions <please insert text>

• environmental <please insert text>

• statutory <please insert text>

• contractual <please insert text>

• others <please insert text>

Renewals planned (during period of analysis)

• scope of renewal (stating key Groups/Sub-Groups included) (a) =


(b) =
(c) =
COMMON PROJECT ATTRIBUTES

• respective cycle (e.g. every five years) (a) =


(b) =
(c) =

• number of renewal cycles included (during the period of (a) =


analysis) (b) =
(c) =

End of Life Costs and/or Carbon Emissions

• hand-back obligations at end of life/period of analysis (if <please insert text>


applicable)

CARBON EMISSIONS RELATED Note: The carbon emissions related section of the ICMS standard attributes is
currently optional.
Carbon emissions measurement

• boundary of carbon reporting Embodied carbon (EN 15978 stages A0-A5, B1- B5, C1-C4)

• percentage of carbon emissions based on actual quantities <please insert text>


(as opposed to forecasts) (%)

• name of carbon assessment tool(s) used (where applicable, <please insert text>
by Sub-Project)
• name of certified carbon assessment process if used <please insert text>

• main source(s) of material quantities for carbon emissions <please select from dropdown>

assessment
• main source(s) of carbon emission factors <please insert text>

Energy sources

• source(s) (and associated percentages) of operational energy <please select from dropdown>

<please insert text if 'other stated' has been selected above>
COMMON PROJECT ATTRIBUTES

• list of energy generation and storage facilities on site <please insert text>

OFFSHORE STRUCTURES ATTRIBUTES

CODE
Local functional classification standard (where applicable)

• name of standard <please insert text where applicable>

• code number of construction <please insert text where applicable>

WORKS
Functional type <please select from dropdown>

<please insert text if 'other stated' has been selected above>

Nature <please select from dropdown>


Environmental grade

<please select from dropdown>



<please insert text if 'other stated' has been selected above>
COMMON PROJECT ATTRIBUTES

• status <please select from dropdown>



Principal design features

• bathymetry (seabed survey) <please insert text>

• construction <please select from dropdown>



<please insert text if 'other stated' has been selected above>

• foundations <please select from dropdown>



• materials <please select from dropdown>

<please insert text if 'other stated' has been selected above>

Project Complexity

• positions <please select from dropdown>



• water nature <please select from dropdown>

• significant wave height at site [Please state quantity in m] <please insert text>

• contaminated sediment dredging <please select from dropdown>



• number of berths <please insert text>

• gross tonnage or bollard pull capacity [Please state quantity <please insert text>
in tonnes / t]
• total net dredging volume [Please state quantity in m3] <please insert text>

• soft dredging volume [Please state quantity in m3] <please insert text>
COMMON PROJECT ATTRIBUTES

• hard dredging volume [Please state quantity in m3] <please insert text>

• spoil disposal volume [Please state quantity in m3] <please insert text>

Oil and gas <please insert text>

• exploratory drilling (diameter mm + depth m) <please insert text>

• developments drilling (diameter mm+ depth m) <please insert text>

• decommissioning <please insert text>

Design life (years) <please insert text>

Altitude

• average height of deck above or below sea level or deck <please insert text>
level relative to Chart Datum (CD) [Please state the quantity
in m above/m below.]

Dimensions

• berthing length or length of structure [Please state quantity <please insert text>
in m]
• width of structure [Please state quantity in m] <please insert text>

• berthing draft at low water (CD) [Please state quantity in m] <please insert text>

• height from seabed to deck [Please state quantity in m] <please insert text>
COMMON PROJECT ATTRIBUTES

Project Quantities

Surface area of platform - Qty <please insert text>

Surface area of platform - Unit m²

Mass prefabricated offshore structure - Qty <please insert text>

Mass prefabricated offshore structure - Unit tonnes

Functional units

Crude oil production (qty) <please insert text>

Crude oil production (unit) <please select from dropdown>



Natural gas production (qty) <please insert text>

Natural gas production m3


(measured at 100 kPa (0.987 atmosphere) and 15°C or
14.696 psi (1 atmosphere) and 60°F (unit)
Electricity production (qty) <please insert text>

Electricity production (unit) <please select from dropdown>


Please select your project quantity's unit of choice (This


will populate the summaries).
Unit of choice <please select from dropdown>

<Please select from 'Unit of choice' dropdown>

<Please select from 'Unit of choice' dropdown>


Table G-3: (Summary) Template for Construction Costs only for an Offshore Structures Project

<please insert text>


Code Description Offshore structures

€ % of Emissions % tCO2e of
€ / qty tCO2e/Qty
total (tCO2e) total

<Please select from 'Unit


Project Quantity of choice' dropdown>

<Please select from 'Unit


of choice' dropdown>
2 Construction (CC | CE) 0.00 100.00% 0.00 100.00%
2.01 Demolition, site preparation and formation 0.00 0.00
2.02 Substructure 0.00 0.00
2.03 Structure 0.00 0.00
2.04 Non-structural works 0.00 0.00
2.05 Services and equipment 0.00 0.00
2.06 Surface and underground drainage 0.00 0.00
2.07 External and ancillary works 0.00 0.00
2.08 Preliminaries | Constructors’ site overheads | general requirements 0.00 0.00
2.09 Risk Allowances 0.00 0.00
2.10 Taxes and Levies 0.00 0.00
2.11 Work and utilities off-site (including related risk allowances, taxes and levies) 0.00 0.00
2.12 Post-completion loose furniture, fittings and equipment (including related risk allowances,
taxes and levies) 0.00 0.00

2.13 Construction-related consultants and supervision (including related risk allowances, taxes
and levies) 0.00 0.00
Table G-3: (Breakdown) Template for Construction Costs only for an Offshore Structures Project

<please insert text>


Code Description Offshore structures

Emissions % tCO2e
€ / qty € % of total tCO2e/Qty
(tCO2e) of total

<Please select from 'Unit


of choice' dropdown>

<Please select from 'Unit


of choice' dropdown>
2 Construction (CC | CE) 0.00 100.00% 0.00 100.00%
2.01 Demolition, site preparation and formation 0.00 0.00
2.01.010 Site survey and ground investigation 0.00 0.00
2.01.020 Environmental treatment 0.00 0.00
2.01.030 Sampling of hazardous or useful materials or conditions 0.00 0.00
2.01.100 Temporary access roads and storage areas (provided under an advance contract) 0.00 0.00
2.01.110 Temporary protection, diversion and relocation of public utilities 0.00 0.00
2.01.600 Water surface development (including common facilities and services, and dredge spoil
recovery area) 0.00 0.00

2.01.610 Dredge spoil recovery area 0.00 0.00


2.01.620 Hydrographic / bathymetry surveys 0.00 0.00
2.01.630 Water quality monitoring 0.00 0.00
2.01.640 Excavation (of soft silt, peat, sands, gravels, clay, rock, etc., including mobilisation and
demobilisation of excavators, blasting, transportation, disposal, reclamation, compaction
and monitoring) 0.00 0.00

2.01.650 Dredging (of soft silt, peat, sands, gravels, clay, rock, etc., including mobilisation and
demobilisation of dredgers and barges, blasting,
transportation, disposal, reclamation, 0.00 0.00
compaction and monitoring)

2.01.660 Special disposal and treatment of contaminated sediment 0.00 0.00


2.01.670 Reclamation or filling (with imported rock, concrete, or other hard materials) 0.00 0.00
2.01.680 Reclamation or filling (with dredged materials) 0.00 0.00
2.01.690 Surcharging or consolidation of lands and monitoring of settlement 0.00 0.00
2.01.700 Habitat protection systems 0.00 0.00

Demolition, site preparation and formation cost summary 0.00 0.00

2.02 Substructure 0.00 0.00


2.02.020 Excavation, disposal and lateral supports (specifically to receive any substructure 0.00 0.00
construction but excluding general site formation and slope treatment)
2.02.040 Drilling / boring 0.00 0.00
2.02.050 Piling / anchoring 0.00 0.00
2.02.060 Structural backfill / ground remediation 0.00 0.00
2.02.090 Pile caps / footings / bases (nearest to the ground level or water level if constructed in 0.00 0.00
2.02.110 water)
Bases to supports for tanks, pipes, well heads and the like 0.00 0.00
2.02.120 Beds and surrounds to underground pipes 0.00 0.00
2.02.630 Marine anchor systems 0.00 0.00

Substructure cost summary 0.00 0.00

2.03 Structure 0.00 0.00


2.03.080 Service roads and approaches 0.00 0.00
2.03.100 Main structures (in case of land formation and reclamation, referring to those of project 0.00 0.00
types not separately reported as Sub-Projects)
2.03.110 Tanks, rigs, storage containers and the like 0.00 0.00
2.03.120 Supports for tanks, pipes and the like 0.00 0.00
2.03.130 Civil pipework 0.00 0.00
2.03.140 Valves and fittings 0.00 0.00
2.03.620 Prefabricated marine structures – 0.00 0.00
off-site fabrication
2.03.630 Prefabricated marine structures – 0.00 0.00
transport to site location
2.03.640 Prefabricated marine structures – 0.00 0.00
installation on site location
2.03.730 Navigational aids 0.00 0.00

Structure cost summary 0.00 0.00

2.04 Non-structural works 0.00 0.00

Non-structural works cost summary 0.00 0.00

2.05 Services and equipment 0.00 0.00


2.05.010 Mechanical systems 0.00 0.00
2.05.020 Lighting systems 0.00 0.00
2.05.050 Cables/cable trays 0.00 0.00
2.05.060 Other electrical services 0.00 0.00
2.05.070 Control systems and instrumentation 0.00 0.00
2.05.080 Pipe racks / supports (localised) 0.00 0.00
2.05.100 Refuse and waste disposal systems 0.00 0.00
2.05.110 Fire services 0.00 0.00
2.05.115 Gas services 0.00 0.00
2.05.120 Movement systems: lifts / elevators / conveyors 0.00 0.00
2.05.620 Under water / sea service pipe installation 0.00 0.00
2.05.630 Under water / sea electrical / data cabling 0.00 0.00

Services and equipment cost summary 0.00 0.00

2.06 Surface and underground drainage 0.00 0.00

Surface and underground drainage cost summary 0.00 0.00

2.07 External and ancillary works 0.00 0.00

External and ancillary works cost summary 0.00 0.00

2.08 Preliminaries | Constructors’ site overheads | general requirements 0.00 0.00


2.08.010 Construction management including site management staff and support labour 0.00 0.00
2.08.045 Marine plant and equipment (e.g. ships 0.00 0.00
/ barges / vessels, floating cranes, dredgers, floating drill rigs, cofferdams, caissons, etc.)

2.08.055 Workpeople living accommodation 0.00 0.00


2.08.060 Other temporary facilities and services 0.00 0.00
2.08.065 Mobilisation and demobilisation where significant and not elsewhere reported 0.00 0.00
2.08.070 Technology and communications: telephone, broadband, hardware, software 0.00 0.00
2.08.080 Constructor’s submissions, reports and as-built documentation 0.00 0.00
2.08.090 Quality monitoring, recording and inspections 0.00 0.00
2.08.100 Safety, health and environmental management 0.00 0.00
2.08.110 Insurances, bonds, guarantees and warranties 0.00 0.00
2.08.120 Constructor’s statutory fees and charges 0.00 0.00
2.08.130 Testing and commissioning 0.00 0.00
2.08.140 Extras for extreme climatic or working conditions (if priced separately according to local 0.00 0.00
pricing practice)

Preliminaries | Constructors' site overheads | general requirements cost summary 0.00 0.00

2.09 Risk Allowances 0.00 0.00


2.09.010 Design development allowance 0.00 0.00
2.09.020 Construction contingencies 0.00 0.00
2.09.030 Price level adjustments 0.00 0.00
2.09.040 Exchange rate fluctuation adjustments 0.00 0.00

Risk Allowances cost summary 0.00 0.00

2.10 Taxes and Levies 0.00 0.00


2.10.010 Paid by the Constructors 0.00 0.00
2.10.020 Paid by the Client in relation to the construction contract payments 0.00 0.00

Taxes and Levies cost summary 0.00 0.00

2.11 Work and utilities off-site (including related risk allowances, taxes and levies) 0.00 0.00
2.11.010 Connections to, diversion of and capacity enhancement of public utility mains or sources 0.00 0.00
off-site up to mains connections on-site
2.11.020 Public access roads and footpaths 0.00 0.00

Work and utilities off-site (including related risk allowances, taxes and levies) cost summary 0.00 0.00

2.12 Post-completion loose furniture, fittings and equipment (including related risk allowances, 0.00 0.00
taxes and levies)
2.12.010 Loose production, process and operating furniture, fittings and equipment not normally 0.00 0.00
provided before completion of construction
2.12.020 Fixed production, process and operating furniture, fittings and equipment installed before 0.00 0.00
completion of construction

Post-completion loose furniture, fittings and equipment (including related risk allowances, 0.00 0.00
taxes and levies) Summary

2.13 Construction-related consultants and supervision (including related risk allowances, taxes 0.00 0.00
and levies)
2.13.010 Consultants’ fees and reimbursable 0.00 0.00
2.13.020 Charges and levies payable to statutory bodies or their appointed agencies (in connection 0.00 0.00
with planning, design, tender and contract approvals, supervision and acceptance
inspections)
2.13.030 Site supervision charges (including their accommodation and travels) 0.00 0.00
2.13.040 Payments to testing authorities or laboratories 0.00 0.00

Construction-related consultants and supervision (including related risk allowances, taxes 0.00 0.00
and levies) cost summary
Table G-4: (Summary) Template for Total Capital Costs (Acquisition Costs and Construction Costs) for
an Offshore Structures Project

<please insert text>


Code Description Offshore structures

€ % by € % of Emissions % tCO2e by % tCO2e of


€ / qty tCO2e/Qty
Category total (tCO2e) Category total

<Please select from 'Unit


Project Quantity of choice' dropdown>

<Please select from 'Unit


of choice' dropdown>
Total Capital Costs (AC+CC) 0.00 100.00% 0.00 100.00%
1 Acquisition Costs (AC) 0.00 0.00
2 Construction Costs (CC) 0.00 0.00

1 Acquisition Costs (AC) 0.00 100.00% 0.00 100.00%


1.01 Site acquisition 0.00 0.00
1.02 Administrative, financial, legal and marketing expenses 0.00 0.00
2 Construction (CC | CE) 0.00 100.00% 0.00 100.00%
2.01 Demolition, site preparation and formation 0.00 0.00
2.02 Substructure 0.00 0.00
2.03 Structure 0.00 0.00
2.04 Non-structural works 0.00 0.00
2.05 Services and equipment 0.00 0.00
2.06 Surface and underground drainage 0.00 0.00
2.07 External and ancillary works 0.00 0.00
2.08 Preliminaries | Constructors’ site overheads | general requirements 0.00 0.00
2.09 Risk Allowances 0.00 0.00
2.10 Taxes and Levies 0.00 0.00
2.11 Work and utilities off-site (including related risk allowances, taxes and levies) 0.00 0.00
2.12 Post-completion loose furniture, fittings and equipment (including related risk allowances,
taxes and levies) 0.00 0.00

2.13 Construction-related consultants and supervision (including related risk allowances, taxes
and levies) 0.00 0.00
Table G-4: (Breakdown) Template for Total Capital Costs (Acquisition Costs and Construction Costs)
for an Offshore Structures Project
• Give subtotals and totals in the heading rows

<please insert text>


Code Description Offshore structures

% tCO2e
€ % by € % of Emissions % tCO2e of
€ / qty tCO2e/Qty by
Category total (tCO2e) total
Category

<Please select from 'Unit


of choice' dropdown>

<Please select from 'Unit


of choice' dropdown>
Total Capital Costs (AC+CC) 0.00 100.00% 0.00 100.00%
1 Acquisition Costs (AC) 0.00 0.00
2 Construction Costs (CC) 0.00 0.00

1 Acquisition Costs (AC) 0.00 100.00% 0.00 100.00%


1.01 Site acquisition
1.01.010 Costs and premium required to procure site
1.01.020 Compensation to existing occupiers
1.01.030
Demolition, removal and modification of existing properties by way of payment to existing
owners instead of carrying out physical work
1.01.040 Contributions for the preservation of heritage, culture and environment
1.01.050 Related fees to agents, lawyers, and the like
1.01.060 Related taxes and statutory charges

Site acquisition cost summary 0.00 0.00

1.02 Administrative, financial, legal and marketing expenses


1.02.010 Client’s general office overheads
1.02.020 Client’s project-specific administrative expenses:
1.02.030 Interest and finance costs
1.02.040 Legal expenses
1.02.050 Accounting expenses
1.02.060 Sales, leasing, marketing, advertising and promotional expenses
1.02.070 Taxes and statutory charges related to sales and lease
1.02.080 License and permit charges for operation and use

Administrative, financial, legal and marketing expenses cost summary 0.00 0.00

2 Construction (CC | CE) 0.00 100.00% 0.00 100.00%


2.01 Demolition, site preparation and formation
2.01.010 Site survey and ground investigation
2.01.020 Environmental treatment
2.01.030 Sampling of hazardous or useful materials or conditions
2.01.100 Temporary access roads and storage areas (provided under an advance contract)
2.01.110 Temporary protection, diversion and relocation of public utilities
2.01.600 Water surface development (including common facilities and services, and dredge spoil
recovery area)
2.01.610 Dredge spoil recovery area
2.01.620 Hydrographic / bathymetry surveys
2.01.630 Water quality monitoring
2.01.640 Excavation (of soft silt, peat, sands, gravels, clay, rock, etc., including mobilisation and
demobilisation of excavators, blasting, transportation, disposal, reclamation, compaction
and monitoring)

2.01.650 Dredging (of soft silt, peat, sands, gravels, clay, rock, etc., including mobilisation and
demobilisation of dredgers and barges, blasting,
transportation, disposal, reclamation,
compaction and monitoring)

2.01.660 Special disposal and treatment of contaminated sediment


2.01.670 Reclamation or filling (with imported rock, concrete, or other hard materials)
2.01.680 Reclamation or filling (with dredged materials)
2.01.690 Surcharging or consolidation of lands and monitoring of settlement
2.01.700 Habitat protection systems

Demolition, site preparation and formation cost summary 0.00 0.00

2.02 Substructure
2.02.020 Excavation, disposal and lateral supports (specifically to receive any substructure
construction but excluding general site formation and slope treatment)
2.02.040 Drilling / boring
2.02.050 Piling / anchoring
2.02.060 Structural backfill / ground remediation
2.02.090 Pile caps / footings / bases (nearest to the ground level or water level if constructed in
2.02.110 water)
Bases to supports for tanks, pipes, well heads and the like
2.02.120 Beds and surrounds to underground pipes
2.02.630 Marine anchor systems

Substructure cost summary 0.00 0.00

2.03 Structure
2.03.080 Service roads and approaches
2.03.100 Main structures (in case of land formation and reclamation, referring to those of project
types not separately reported as Sub-Projects)
2.03.110 Tanks, rigs, storage containers and the like
2.03.120 Supports for tanks, pipes and the like
2.03.130 Civil pipework
2.03.140 Valves and fittings
2.03.620 Prefabricated marine structures –
off-site fabrication
2.03.630 Prefabricated marine structures –
transport to site location
2.03.640 Prefabricated marine structures –
installation on site location
2.03.730 Navigational aids

Structure cost summary 0.00 0.00

2.04 Non-structural works

Non-structural works cost summary 0.00 0.00

2.05 Services and equipment


2.05.010 Mechanical systems
2.05.020 Lighting systems
2.05.050 Cables/cable trays
2.05.060 Other electrical services
2.05.070 Control systems and instrumentation
2.05.080 Pipe racks / supports (localised)
2.05.100 Refuse and waste disposal systems
2.05.110 Fire services
2.05.115 Gas services
2.05.120 Movement systems: lifts / elevators / conveyors
2.05.620 Under water / sea service pipe installation
2.05.630 Under water / sea electrical / data cabling

Services and equipment cost summary 0.00 0.00

2.06 Surface and underground drainage

Surface and underground drainage cost summary 0.00 0.00

2.07 External and ancillary works

External and ancillary works cost summary 0.00 0.00

2.08 Preliminaries | Constructors’ site overheads | general requirements


2.08.010 Construction management including site management staff and support labour
2.08.045 Marine plant and equipment (e.g. ships
/ barges / vessels, floating cranes, dredgers, floating drill rigs, cofferdams, caissons, etc.)
2.08.055 Workpeople living accommodation
2.08.060 Other temporary facilities and services
2.08.065 Mobilisation and demobilisation where significant and not elsewhere reported
2.08.070 Technology and communications: telephone, broadband, hardware, software
2.08.080 Constructor’s submissions, reports and as-built documentation
2.08.090 Quality monitoring, recording and inspections
2.08.100 Safety, health and environmental management
2.08.110 Insurances, bonds, guarantees and warranties
2.08.120 Constructor’s statutory fees and charges
2.08.130 Testing and commissioning
2.08.140 Extras for extreme climatic or working conditions (if priced separately according to local
pricing practice)

Preliminaries | Constructors' site overheads | general requirements cost summary 0.00 0.00

2.09 Risk Allowances


2.09.010 Design development allowance
2.09.020 Construction contingencies
2.09.030 Price level adjustments
2.09.040 Exchange rate fluctuation adjustments

Risk Allowances cost summary 0.00 0.00

2.10 Taxes and Levies


2.10.010 Paid by the Constructors
2.10.020 Paid by the Client in relation to the construction contract payments

Taxes and Levies cost summary 0.00 0.00

2.11 Work and utilities off-site (including related risk allowances, taxes and levies)
2.11.010 Connections to, diversion of and capacity enhancement of public utility mains or sources
off-site up to mains connections on-site
2.11.020 Public access roads and footpaths

Work and utilities off-site (including related risk allowances, taxes and levies) cost summary 0.00 0.00

2.12 Post-completion loose furniture, fittings and equipment (including related risk allowances,
taxes and levies)
2.12.010 Loose production, process and operating furniture, fittings and equipment not normally
provided before completion of construction
2.12.020 Fixed production, process and operating furniture, fittings and equipment installed before
completion of construction

Post-completion loose furniture, fittings and equipment (including related risk allowances, 0.00 0.00
taxes and levies) Summary

2.13 Construction-related consultants and supervision (including related risk allowances, taxes
and levies)
2.13.010 Consultants’ fees and reimbursable
2.13.020 Charges and levies payable to statutory bodies or their appointed agencies (in connection
with planning, design, tender and contract approvals, supervision and acceptance
inspections)
2.13.030 Site supervision charges (including their accommodation and travels)
2.13.040 Payments to testing authorities or laboratories

Construction-related consultants and supervision (including related risk allowances, taxes 0.00 0.00
and levies) cost summary