REPORT
Status of cost and/or carbon emissions report <please select from dropdown>
�
Date of cost and/or carbon emissions report <please insert text>
Revision number of cost and/or carbon emissions report <please insert text>
Base date of costs (if individual cost is exclusive of Price Level <please insert text>
Adjustments after that date)
Price basis <please select from dropdown>
�
CONSTRUCTION PROGRAMME
Project status <please select from dropdown>
�
Construction period
SITE
Existing site status
CONSTRUCTION PROCUREMENT
Funding <please select from dropdown>
�
Project delivery
Note: The Life Cycle Costs section of the ICMS standard attributes is optional at the
LIFE CYCLE COST RELATED present time.
Life cycle costing
• common date (to which all costs are discounted or compounded) <please insert text>
• Real discount rate % per annum (includes inflation) <please insert text>
Expected constructed asset life span after completion of construction <please select from dropdown>
�
COMMON PROJECT ATTRIBUTES
CARBON EMISSIONS RELATED Note: The carbon emissions related section of the ICMS standard attributes is
currently optional.
Carbon emissions measurement
• boundary of carbon reporting Embodied carbon (EN 15978 stages A0-A5, B1- B5, C1-C4)
• name of carbon assessment tool(s) used (where applicable, <please insert text>
by Sub-Project)
• name of certified carbon assessment process if used <please insert text>
• main source(s) of material quantities for carbon emissions <please select from dropdown>
�
assessment
• main source(s) of carbon emission factors <please insert text>
Energy sources
• source(s) (and associated percentages) of operational energy <please select from dropdown>
�
<please insert text if 'other stated' has been selected above>
COMMON PROJECT ATTRIBUTES
• list of energy generation and storage facilities on site <please insert text>
CODE
Local functional classification standard (where applicable)
WORKS
Functional type <please select from dropdown>
�
<please insert text if 'other stated' has been selected above>
Environmental grade
Project Complexity
• gross tonnage or bollard pull capacity [Please state quantity <please insert text>
in tonnes / t]
• total net dredging volume [Please state quantity in m3] <please insert text>
• soft dredging volume [Please state quantity in m3] <please insert text>
COMMON PROJECT ATTRIBUTES
• hard dredging volume [Please state quantity in m3] <please insert text>
• spoil disposal volume [Please state quantity in m3] <please insert text>
Altitude
• average height of deck above or below sea level or deck <please insert text>
level relative to Chart Datum (CD) [Please state the quantity
in m above/m below.]
Dimensions
• berthing length or length of structure [Please state quantity <please insert text>
in m]
• width of structure [Please state quantity in m] <please insert text>
• berthing draft at low water (CD) [Please state quantity in m] <please insert text>
• height from seabed to deck [Please state quantity in m] <please insert text>
COMMON PROJECT ATTRIBUTES
Project Quantities
Functional units
€ % of Emissions % tCO2e of
€ / qty tCO2e/Qty
total (tCO2e) total
2.13 Construction-related consultants and supervision (including related risk allowances, taxes
and levies) 0.00 0.00
Table G-3: (Breakdown) Template for Construction Costs only for an Offshore Structures Project
Emissions % tCO2e
€ / qty € % of total tCO2e/Qty
(tCO2e) of total
2.01.650 Dredging (of soft silt, peat, sands, gravels, clay, rock, etc., including mobilisation and
demobilisation of dredgers and barges, blasting,
transportation, disposal, reclamation, 0.00 0.00
compaction and monitoring)
Preliminaries | Constructors' site overheads | general requirements cost summary 0.00 0.00
2.11 Work and utilities off-site (including related risk allowances, taxes and levies) 0.00 0.00
2.11.010 Connections to, diversion of and capacity enhancement of public utility mains or sources 0.00 0.00
off-site up to mains connections on-site
2.11.020 Public access roads and footpaths 0.00 0.00
Work and utilities off-site (including related risk allowances, taxes and levies) cost summary 0.00 0.00
2.12 Post-completion loose furniture, fittings and equipment (including related risk allowances, 0.00 0.00
taxes and levies)
2.12.010 Loose production, process and operating furniture, fittings and equipment not normally 0.00 0.00
provided before completion of construction
2.12.020 Fixed production, process and operating furniture, fittings and equipment installed before 0.00 0.00
completion of construction
Post-completion loose furniture, fittings and equipment (including related risk allowances, 0.00 0.00
taxes and levies) Summary
2.13 Construction-related consultants and supervision (including related risk allowances, taxes 0.00 0.00
and levies)
2.13.010 Consultants’ fees and reimbursable 0.00 0.00
2.13.020 Charges and levies payable to statutory bodies or their appointed agencies (in connection 0.00 0.00
with planning, design, tender and contract approvals, supervision and acceptance
inspections)
2.13.030 Site supervision charges (including their accommodation and travels) 0.00 0.00
2.13.040 Payments to testing authorities or laboratories 0.00 0.00
Construction-related consultants and supervision (including related risk allowances, taxes 0.00 0.00
and levies) cost summary
Table G-4: (Summary) Template for Total Capital Costs (Acquisition Costs and Construction Costs) for
an Offshore Structures Project
2.13 Construction-related consultants and supervision (including related risk allowances, taxes
and levies) 0.00 0.00
Table G-4: (Breakdown) Template for Total Capital Costs (Acquisition Costs and Construction Costs)
for an Offshore Structures Project
• Give subtotals and totals in the heading rows
% tCO2e
€ % by € % of Emissions % tCO2e of
€ / qty tCO2e/Qty by
Category total (tCO2e) total
Category
Administrative, financial, legal and marketing expenses cost summary 0.00 0.00
2.01.650 Dredging (of soft silt, peat, sands, gravels, clay, rock, etc., including mobilisation and
demobilisation of dredgers and barges, blasting,
transportation, disposal, reclamation,
compaction and monitoring)
2.02 Substructure
2.02.020 Excavation, disposal and lateral supports (specifically to receive any substructure
construction but excluding general site formation and slope treatment)
2.02.040 Drilling / boring
2.02.050 Piling / anchoring
2.02.060 Structural backfill / ground remediation
2.02.090 Pile caps / footings / bases (nearest to the ground level or water level if constructed in
2.02.110 water)
Bases to supports for tanks, pipes, well heads and the like
2.02.120 Beds and surrounds to underground pipes
2.02.630 Marine anchor systems
2.03 Structure
2.03.080 Service roads and approaches
2.03.100 Main structures (in case of land formation and reclamation, referring to those of project
types not separately reported as Sub-Projects)
2.03.110 Tanks, rigs, storage containers and the like
2.03.120 Supports for tanks, pipes and the like
2.03.130 Civil pipework
2.03.140 Valves and fittings
2.03.620 Prefabricated marine structures –
off-site fabrication
2.03.630 Prefabricated marine structures –
transport to site location
2.03.640 Prefabricated marine structures –
installation on site location
2.03.730 Navigational aids
Preliminaries | Constructors' site overheads | general requirements cost summary 0.00 0.00
2.11 Work and utilities off-site (including related risk allowances, taxes and levies)
2.11.010 Connections to, diversion of and capacity enhancement of public utility mains or sources
off-site up to mains connections on-site
2.11.020 Public access roads and footpaths
Work and utilities off-site (including related risk allowances, taxes and levies) cost summary 0.00 0.00
2.12 Post-completion loose furniture, fittings and equipment (including related risk allowances,
taxes and levies)
2.12.010 Loose production, process and operating furniture, fittings and equipment not normally
provided before completion of construction
2.12.020 Fixed production, process and operating furniture, fittings and equipment installed before
completion of construction
Post-completion loose furniture, fittings and equipment (including related risk allowances, 0.00 0.00
taxes and levies) Summary
2.13 Construction-related consultants and supervision (including related risk allowances, taxes
and levies)
2.13.010 Consultants’ fees and reimbursable
2.13.020 Charges and levies payable to statutory bodies or their appointed agencies (in connection
with planning, design, tender and contract approvals, supervision and acceptance
inspections)
2.13.030 Site supervision charges (including their accommodation and travels)
2.13.040 Payments to testing authorities or laboratories
Construction-related consultants and supervision (including related risk allowances, taxes 0.00 0.00