MEMORANDUM
TO: MR. RICARDO L. BRITO, MBA - CEO/President
FROM: ENGR. ROBERTO G. ROSALES, MScME
CC: RynaB/MikeeV/ManuelB/ChesterL/KevinK/SusanY/LorelaE
SUBJECT: Update on Consultant’s Report for the Week of April 3 to 8, 2023
Hi Sir Ricardo,
Good Day!
April 3
Metholation Factory in Cavite as shared by AlvinA
1.Total area for comfort cooling as requested by owner
2. Total heat load provided by owner is at 42kw which is equivalent to 12TR cooling.
3. Estimated total cooling is at 80Tr in which 12tr goes to equipment
4. Allocated load for light manufacturing is at 2.6 sqm per kw cooling
5. Imternal airflow at 12.7 to 19.3 lps/sqm
April 4
1.Updated BOQ for Unitop Alaminos submitted to Rirance
2.Prospective meeting with Zachra Industrial
April 5
1. Updated BOQ submitted for GatewayMall Zamboanga c/o Mr. Kevin Ang
2. April Prospective Meeting with Metro South Airconditioning