You are on page 1of 1

April 8, 2023

MEMORANDUM
TO: MR. RICARDO L. BRITO, MBA - CEO/President
FROM: ENGR. ROBERTO G. ROSALES, MScME
CC: RynaB/MikeeV/ManuelB/ChesterL/KevinK/SusanY/LorelaE
SUBJECT: Update on Consultant’s Report for the Week of April 3 to 8, 2023

Hi Sir Ricardo,

Good Day!

Please see updates for the week

April 3
Metholation Factory in Cavite as shared by AlvinA
1.Total area for comfort cooling as requested by owner
2. Total heat load provided by owner is at 42kw which is equivalent to 12TR cooling.
3. Estimated total cooling is at 80Tr in which 12tr goes to equipment
4. Allocated load for light manufacturing is at 2.6 sqm per kw cooling
5. Imternal airflow at 12.7 to 19.3 lps/sqm

April 4
1.Updated BOQ for Unitop Alaminos submitted to Rirance
2.Prospective meeting with Zachra Industrial

April 5
1. Updated BOQ submitted for GatewayMall Zamboanga c/o Mr. Kevin Ang
2. April Prospective Meeting with Metro South Airconditioning

April 6-9 – Holyweek 2023

Submitted for documentation and future references.

Thank you

ENGR. ROBERTO G ROSALES, MSME


ASHRAE-PSME
HVAC CONSULTANT
REC-UNI-TECH Philippines Industrial Machinery Inc.
T: +63 2 657 1616 local 1217 | M: + 63 9175764804
E: bengr.unitech@unitopph.com
A: RRR Bldg., Lot 16, Blk 2 Pres. Diosdado Macapagal Blvd. Aseana, Parañaque City