You are on page 1of 2

PT.

SORBU AGRO ENERGI


18 Office Park Building 12th Floor Unit A & H
Jl. TB Simatupang No 18 Jakarta Selatan 12 520
www.sorbuenergi.com

SUMMARY OF REVISE BASIC DESIGN

Attached, is the revision of Basic Design Engineering for Rice Straw conversion into BioLNG
Project.
The main changes are as follow :

1. Section I, Laboratory Analysis, we have attached river water result analysis from 2
different laboratories
2. Section II, Process Design Calculation, there is a change in the Table calculation from
Raw material input, Process Design Parameter, Load Reactor Data, Energy Production
 Total Rice Straw needed is at around 1.250 Ton/day
 This number is a calculation number based on energy production volume
required. After system commissioned and all process parameter stable, feed
stock can be recalculated for optimum gas production.
 Reactor Volume for processing is at around 59.823m3, this volume will be
divided to 15 tank reactor, that each respective tank will have a volume at
4.005 m3.
 Parasitic Load in this process design made for 8 Megawatt electricity, by
having 1.250 ton feedstock, and parasitic load 8 Megawatt Electricity, it
still enough gas produced for further utilization
 Energy production gain is 5.1735 MMSCFD, this number is in netto for
production or delivered after deducted for parasitic load.
 Process Retention Time for 1.250 ton feedstock will take around 35 days
until complete process of biogas production
3. Section III, General Overview For Area Condition, we have attached about earthquake
zone in Indonesia, especially Subang area as a project location.
4. Section IV, PFD, We have corrected the values for each biogas system flow, according to
the calculations in section II
5. Section V, In this section, we have completed creating the layout according to the desired
request
6. Section VI, Equipment Data Sheet, Same as before
7. Section VII, Power Usage, in this section we have updated the total power usage and
requirements
8. Section VIII, Mass Balance, has been adjusted to the calculation results in section II
9. Section IX, Hydrolic Profile, has been adjusted to the calculation results in section II
10. Section X, Civil Load List, Dimension and Soil Test, in this section we added regarding
soil testing which functions as a tests to carried out the condition of the soil physically
and physically at the test site.
PT.SORBU AGRO ENERGI
18 Office Park Building 12th Floor Unit A & H
Jl. TB Simatupang No 18 Jakarta Selatan 12 520
www.sorbuenergi.com

11. SectionXI, Hazard Identification and Potential Waste, in this we attached table for
potential waste, to determine the potential for wasted energy from the biogas system
flow, for reusing that energy with other alternatives or reused in the biogas system
12. Section XII, Total Capex Expenditures that will later be made to reproduce, purchase and
maintain repairs related to long-term assets, at a mutually agreed price
13. And for attachment, we included ;
 Result for value river water which has been tested in laboratories Government
laboratory and Private laboratory (Saraswanti Laboratory)
 Decree of the Minister of Agriculture of the Republic of Indonesia Number:
261/KPTS/SR.310/M/4/2019 CONCERNING MINIMUM TECHNICAL
REQUIREMENTS FOR ORGANIC FERTILIZER, BIOLOGICAL FERTILIZER
AND SOIL IMPROVEMENT
 Minister of Health Regulation No. 2 of 2023
 European standard hazard areas
 Indonesian and international earthquake construction standards (ISO),

Bekasi, October 10th 2023

Best Regards

( Adhi Erlangga )