PAHALA BOMIRIYA,
KADUWELA.
Method Statement for Supply and Installation of Wooden doors
01. Objective
To describe the sequence of work and coordination of the installation of door in compliance to
standard and as shown on the drawings.
04. Manufacturing
Selecting, cutting and preparing wood as per the drawings using basic machinery.
Making jambs and the header as per the detailed drawing and according to the site
measurements.
Making door frame by fastening jambs and the header using Epi-Fix glue and kept for 24
hours for proper bonding.
Making top rail, bottom rail, middle rail, stiles and panels as per the approved design
and the drawing.
Making door frame by fastening top rail, bottom rail, middle rail, stiles and panels using
Epi-Fix glue and kept for 24 hours for proper bonding.
Smoothing by sanding machinery
Check the quality and the sizes before applying the paints.
06. Painting
OPTION 01 – Auto Paint
Smoothing and preparing surfaces for painting.
Applying timber barrier coat.
Filling surfaces defects using putty filler.
Smoothing and soft sanding.
Spraying of one coat of Paint (as per the approved paint sample).
Smoothing by very soft sanding.
Spraying of another one coat of paint (as per the approved paint sample).