Metro RAIL APP IN DHAKA

Final Term LAB Reports

Semester: Spring_22_23 Section: F Group Number: 6

Student Name: MD MOSTOFA HASIB Student ID: 21-44938-2


Student Name: ALIF HOSSAIN TALHA Student ID: 21-44923-2
Student Name: IRTIZA AHSAN ABIR Student ID: 21-45009-2
Student Name: SHAILA SHARMIN Student ID: 21-45223-2

SOFTWARE ENGINEERING [F]


SUPERVISED BY,
DR.S.M. HASAN MAHMUD
Lab:1
WBS Effort estimation:

Lab:2

Resource Allocation:
Lab:3

Risk analysis:
Probabilit
Impact
y
Very
Very High
High

High High

Medium Medium

Low Low

Very Low Very Low

Risk Matrix:

Impact: Very Low Low Medium High Very High

Very High Moderate Severe Severe Critical Critical

High Sustainable Moderate Severe Critical Critical


Probability

Medium Sustainable Moderate Moderate Severe Critical

Low Sustainable Sustainable Moderate Severe Critical

Very Low Sustainable Sustainable Sustainable Moderate Severe

Impact
Very Low Low Medium High Very High
:
Very High
Probability

High 1

Medium 1 1 1 1

Low 1 1 1

Very Low 1
Impact
Very Low Low Medium High Very High
:
Very High
Probability

High

Medium 1

Low 1

Very Low

Risk Analysis
Inadequate unit testing 10% 50% 5.00%
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26

Poor iOS and Android integration 10% 50% 5.00%

Poor transaction processing 5% 50% 2.50%

Inadequate catalog engine development 5% 50% 2.50%

Inadequate database implementation 5% 60% 3.00%

Inadequate content creation 10% 30% 3.00%

Graphics and interface issues 10% 40% 4.00%

Poor performance due to inadequate design or coding 10% 50% 5.00%

Inadequate architecture design 10% 40% 4.00%

Poor technical design 10% 50% 5.00%

Poor prototype design 10% 50% 5.00%


Risk Description

Poor UI/UX design 10% 60% 6.00%

Delay in wireframing and mockups due to unforeseen events 10% 30% 3.00%

Inadequate identification of best practices 10% 40% 4.00%

Inadequate identification of reporting needs 10% 40% 4.00%

Inaccurate or incomplete use case development 10% 50% 5.00%

Inaccurate or incomplete interviews with stakeholders 10% 50% 5.00%

Inaccurate or incomplete needs and requirements analysis 10% 60% 6.00%

Lack of user engagement and feedback 15% 40% 6.00%

Inadequate analysis of existing metro rail services 10% 50% 5.00%

Scope changes and requirements alterations 20% 30% 6.00%

Inadequate risk planning 10% 40% 4.00%

Inaccurate or unrealistic project scheduling 10% 50% 5.00%

Incomplete or inaccurate project scope statement 10% 60% 6.00%

Poor project execution and control 15% 70% 10.50%

Delay in project management due to unforeseen events 25% 50% 12.50%

0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%

Probability | Impact | Risk Score

Probability Impact Risk Score