Professional Documents
Culture Documents
C_TS4CO_2021
S/4HANA Management Accounting
Questions
A profit center standard hierarchy contains all profit centers that are assigned to which
organizational unit?
1.) Plant
2.) Controlling area
3.) Client
4.) Operating concern
Correct Answer: 2
Question: 2
Correct Answer: 3
Question: 3
Question: 4
At which level do you define the valuation method for results analysis?
Question: 5
During posting, from which object does the system first derive the profit center if the
profit center is NOT directly assigned to a network activity?
Correct Answer: 4
Question: 6
For which objects can you revaluate activities and business processes at actual prices? (3
Correct)
Question: 7
For which of the following situations would you need to implement the transfer price
solution in SAP S/4HANA?
1.) Parallel price calculation and invoicing are needed to facilitate intercompany
reconciliation.
2.) Parallel accounting is needed in order to be compliant with different accounting
principles.
3.) Parallel costing is needed in order to calculate the separate costs of goods
manufactured for different accounting principles.
4.) Parallel valuation views of the same logistical flows are needed to differentiate
between legal and profit center valuation.
Correct Answer: 4
Question: 8
For which revenue-carrying cost objects does the system perform results analysis? (3
Correct)
Question: 9
1.) Define allocation for the same cost center in multiple segments
2.) Create cycles that iterate with each other
3.) Assign several segments to a cycle
4.) Use different allocation rules within one segment
Correct Answer: 3
Question: 10
How can you configure the transfer price solution in SAP S/4HANA? (2 Correct)
Question: 11
How can you define the overhead rate in a costing sheet? (2 Correct)
Question: 12
Correct Answer: 4
Question: 13
How do you define the relationship between an operating concern and a controlling area?
Correct Answer: 2
Question: 14
Correct Answer: 3
Question: 15
Question: 16
Correct Answer: 3
Question: 17
How does SAP S/4HANA select line-item-based data for costing-based Profitability
Analysis reports?
1.) It selects actual data from table ACDOCA and plan data from table ACDOCP.
2.) It selects actual data from table CE1XXXX and plan data from table CE2XXXX.
3.) It selects actual data from table CE2XXXX and plan data from table CE3XXXX.
4.) It selects actual data from table ACDOCA and plan data from table COSP.
Correct Answer: 2
Question: 18
How does the system derive the requirement type from the material master data? (2
Correct)
1.) MRP group -> strategy group -> planning strategy -> requirements type
2.) Strategy group -> planning strategy -> requirements class -> requirements type
3.) MRP group requirements class -> planning strategy -> requirements type
4.) Strategy group -> planning strategy -> requirements type
In a make-to-order scenario, you use a sales order with an assigned production order and
non-valuated sales order stock. Which process do you use to post actual costs on a sales
order in SAP S/4HANA? (2 Correct)
Question: 20
Correct Answer: 4
Question: 21
In an SAP S/4HANA system, you have two profit centers with the same profit center code
and the same validity period, but different names. What does this indicate about the
configuration of the profit centers?
Correct Answer: 3
Question: 22
In the material master record there are three planned prices. What do you use them for?
1.) To valuate material stocks
2.) To update the standard price during the release of a standard cost estimate
3.) To valuate the materials in cost estimates
4.) To valuate goods movement
Correct Answer: 3
Question: 23
In the Product Cost by Order component, what does the system calculate depending on
the order status?
Correct Answer: 1
Question: 24
Correct Answer: 1
Question: 25
In which SAP S/4HANA components can you report the results of the results analysis? (3
Correct)
In your company, you tend to go through many reorganizations leading to extra master
data maintenance work. Which grouping functionality can save you time maintaining
profit center groups?
Correct Answer: 2
Question: 27
Independent from the cost object, which parameters are always contained in a costing
variant? (2 Correct)
Question: 28
On which document in the sales process is the profit center initially entered?
Correct Answer: 3
Question: 29
On which organizational level do you maintain profit center accounting in SAP S/4HANA?
1.) Company code
2.) Operating concern
3.) Controlling area
4.) Financial statement version
Correct Answer: 3
Question: 30
To which objects do you assign the elements of the cost component split to ensure the
transfer of costing to costing-based CO-PA?
Correct Answer: 1
Question: 31
1.) Segment
2.) Profit center
3.) Profitability segment
4.) Cost center
Question: 32
What action do you perform to use the Cost-Based Percentage of Completion (POC)
method?
Correct Answer: 4
Question: 33
Question: 34
What are some of the characteristics of Profit Center Accounting in SAP S/4HANA? (2
Correct)
1.) It is possible to derive the profit center from the segment in configuration
2.) It can be used with period and/or cost of sales accounting.
3.) It can be used in the settlement rule for internal orders.
4.) It is integrated into the universal journal.
Question: 35
What are some of the characteristics of SAP Core Data Services (CDS) views? (3 Correct)
Question: 36
Question: 37
What are some of the unique attributes of an assessment cycle in Controlling? (2 Correct)
Question: 38
What are the prerequisites for automatic generation of the settlement rule to a market
segment for a sales order item? (2 Correct)
Question: 39
What can you analyze in detail when you transfer the cost component split from product
cost planning to costing-based CO-PA?
Correct Answer: 2
Question: 40
Question: 41
What can you define for a user status in the status profile?
1.) The versions for which you can enter plan data
2.) The assigned user status after a business transaction is executed
3.) The business user IDs authorized to change the user status
4.) The order types for which a user status is valid
Correct Answer: 2
Question: 42
Correct Answer: 4
Question: 43
What can you manage via the account assignment category? (2 Correct)
Question: 44
What can you use to difference two or more cost estimates for the same material? (2
Correct)
Question: 45
Question: 46
What do you get if you mark a standard price cost estimate? (2 Correct)
Question: 47
What do you need to define in order to report variable costs that refer to the cost
component split in account-based CO-PA? (2 Correct)
1.) A price difference profile
2.) A variable cost field in ACDOCA
3.) A cost splitting profile
4.) A calculation formula
Question: 48
What do you use to map the primary cost component split to the production cost
component structure?
Correct Answer: 2
Question: 49
What does the calculation of a condition type in the costing sheet of CO-PA depend on? (2
Correct)
1.) Segment
2.) Calculation type
3.) Valuation
4.) Condition class
Question: 50
What is required before you can create a multi-level material cost estimate without
quantity structure?
1.) Material master with accounting view and with MRP views
2.) Specific valuation variants for material costings without quantity structure
3.) Specific costing variants for material costings without quantity structure
4.) Material master with costing view
Correct Answer: 4
Question: 52
What is the default option for planning profit center values in SAP S/4HANA?
Correct Answer: 1
Question: 53
What is the difference when you perform repost line items (TA: KB61) compared to
manual reposting of costs (KB11n) for a cost center? (2 Correct)
Question: 54
Question: 55
What must the referenced cost estimate and the receiving cost estimate have in common?
Correct Answer: 1
Question: 56
What parameters can you set up when defining order types? (2 Correct)
Question: 57
What tasks are performed by the system during activity allocation? (2 Correct)
1.) A primary costs G/L account is used for debiting and crediting
2.) The allocation amount is calculated based on the quantity and price of the activity
3.) The cost element is derived from the master data for the activity type
4.) The sender cost object is debited and the receiver cost object is credited
Question: 58
What values flow from Sales and Distribution billing to costing-based Profitability
Analysis? (2 Correct)
1.) Sales deductions
2.) Revenue
3.) Maintenance overhead costs
4.) Accrued production overhead
Question: 59
When do you select the percentage method for accrual calculation? (2 Correct)
1.) When you accrue activity-independent costs and an appropriate cost element for
defining overhead rates is available
2.) When you accrue activity-dependent costs and an appropriate cost element in NOT
available
3.) When you accrue-dependent costs and an appropriate cost element for defining
overhead rates Is available
4.) When you accrue activity-independent costs and an appropriate cost element is NOT
available
Question: 60
Question: 61
Correct Answer: 4
Question: 62
When you configure period-end closing, which accrual calculations methods can you use?
(2 Correct)
Question: 63
When you create a planning layout, which objects can you use to define the data columns?
(3 Correct)
Question: 64
When you create a profit center, what company code(s) is it assigned to by default?
Correct Answer: 1
Question: 65
When you define assessment cycles for the period-end closing in overhead cost
accounting, which object can you assign to the cycle segment?
1.) Allocation structure
2.) Costing sheet
3.) Template
4.) Settlement rule
Correct Answer: 1
Question: 66
Question: 67
Question: 68
Which activities can you perform while you create cost center hierarchies? (2 Correct)
Question: 69
Which attributes can you configure in the activity type master record? (3 Correct)
Question: 70
Which characteristic controls the eligible cost element categories for G/L accounts in SAP
S/4HANA?
Correct Answer: 2
Question: 71
Correct Answer: 3
Question: 72
Which component provides insight into the effectiveness and results for areas of
responsibility within the enterprise?
Correct Answer: 4
Question: 73
Which configuration is possible when you assign multiple company codes to a controlling
area in SAP S/4HANA?
1.) The company code operational chart of accounts may differ from the controlling area
operational chart of accounts
2.) The company code currency may differ from the controlling area currency
3.) The company code fiscal year variant may differ from the controlling area fiscal year
variant In the number of special periods
4.) The company code fiscal year variant may differ from the controlling area fiscal year
variant in the number of periods and number of especial periods
Correct Answer: 2
Question: 74
Which cost estimates must you reuse with the transfer control functionality?
Correct Answer: 2
Question: 75
Question: 76
Question: 77
Which criteria do you use to specify the G/L account for the work in process (WIP)
settlement? (3 Correct)
Question: 78
Which currency types can you use for costing-based CO-PA? (2 Correct)
Question: 79
Correct Answer: 3
Question: 80
Which customizing do you use for calculating work in progress (WIP)? (3 Correct)
Question: 81
Which Customizing for Document Splitting settings do you maintain to ensure that
financial statements can always be produced separately for each profit center?
1.) Zero-balance
2.) Inheritance
3.) Dummy profit center
4.) Standard account assignment
Correct Answer: 1
Question: 82
Which default values can you configure for the product cost collector? (2 Correct)
Question: 83
Question: 84
Which key performance indicators (KPIs) does profit center accounting help you report?
(2 Correct)
Question: 85
Which main elements do you configure for the overhead costing sheet? (3 Correct)
Question: 86
Which management accounting currencies can you use for evaluation when you use cross-
company-code cost accounting? (3 Correct)
Question: 87
Which object can you configure t offset overhead surcharges for a cost object? (3 Correct)
1.) Profitability segment
2.) Profit center
3.) Cost center
4.) Internal order
5.) Business process
Question: 88
Which object can you select for reporting in costing-based Profitability Analysis, and NOT
in account- based Profitability Analysis?
Correct Answer: 2
Question: 89
Which object controls the tiles a business user can assign to their SAP Fiori launchpad?
Correct Answer: 4
Question: 90
Which object do you configure to reuse material cost estimate for the costing process?
Correct Answer: 3
Question: 91
Which object do you have to assign the cost component structure to?
Correct Answer: 3
Question: 92
Question: 93
Question: 94
Question: 95
Which objects do you use when you assign costs and revenue to the value fields in costing-
based CO-PA?
Correct Answer: 1
Question: 96
Which of the following are typical activities of the sales planning phase in SAP S/4HANA?
(2 Correct)
Question: 97
Which of the following controls can you set when you determine a characteristic
derivation? (3 Correct)
Question: 98
Which of the following objects can be selected in templates for activity-based costing?
1.) WBS element
2.) Cost center/activity type
3.) Internal order
Correct Answer: 2
Question: 99
Which of the following statements are applicable to automatic account assignment in SAP
S/4HANA? (2 Correct)
Question: 100
Which of the following statements are applicable to SAP S/4HANA embedded analytics? (2
Correct)
1.) It is part of the core SAP S/4HANA license and uses the same technical stack and user
interface.
2.) It is part of SAP S/4HANA Strategic Analytics tools stack that uses virtual data models
for reporting.
3.) It is used by dedicated BI users who need to go beyond the capabilities of Strategic
Analytics Tools for reporting.
4.) It uses core data services (CDS) views to create virtual data models (VDMs) for
reporting.
Question: 101
Which of the following statements best describe Product Cost by Order? (2 Correct)
Question: 102
Which of the following statements best describe Product Cost by Period? (2 Correct)
1.) It is used when the focus of control is on a stable and continuous production process.
2.) It is used in conjunction with a product cost collector.
3.) It is used for joint production with process orders.
4.) It is used to analyze work in the process based on actual costs.
Question: 103
Which of the following steps are part of the procedure to update the standard price of the
material? (2 Correct)
Question: 104
Which of the following values can be calculated using results analysis? (3 Correct)
Question: 105
Which order status is relevant for creating work in process (WIP) calculations when you
use Product Cost by Order (PCO)?
1.) Delivered
2.) Technically completed
3.) Created
4.) Partially released
Correct Answer: 4
Question: 106
Which parameters are controlled by the costing type in a costing variant? (2 Correct)
Question: 107
Which process can you use to credit internal orders during period-end closing?
Correct Answer: 1
Question: 108
Which process determines the target costs of the cost object in a product cost by order
scenario?
Correct Answer: 2
Question: 109
Question: 110
Which receiver must be allowed in the settlement profile of a product cost collector?
1.) Material
2.) Business process
3.) Cost center
4.) Order
Correct Answer: 1
Question: 111
Question: 112
Which settings can you configure per order type for the budget and availability control? (2
Correct)
1.) It represents an organizational unit in SAP S/4HANA where the costs and revenues are
incurred and reported.
2.) It is a structure to which all the cost centers within a controlling area are assigned.
3.) It is grouped together with alternative hierarchies to represent decision control and
responsibility units.
4.) It enables you to assign the same attributes to similar cost centers within a controlling
area.
Correct Answer: 2
Question: 114
Correct Answer: 3
Question: 115
Which statements are relevant to the cost of sales accounting method in profitability
management? (2 Correct)
1.) It presents the costs and revenues information in a format that is ideal for conducting
margin analyses
2.) It aims to summarize activity and situational change for a given organizational unit
over a period of time.
3.) It presents revenues, primary expenses, changes in stock, WIP, and capitalized
activities.
4.) It aims to match revenues for goods and services against sales-related expenses.
Question: 116
Which tasks can you perform on a production order in a make-to-order scenario with
valuated stock? (2 Correct)
Question: 117
Which type of Profitability Analysis updates the cost of goods sold at the time of delivery?
Correct Answer: 3
Question: 118
Which views can you use to analyze the costing results within the costing run tool? (3
Correct)
Question: 119
You are configuring internal order settlement. Where do you define which cost elements
should be settled, using either the original or settlement cost elements?
Correct Answer: 2
Question: 121
You are considering using commitment management with internal orders. What do you
need to do in the configuration?
Correct Answer: 4
Question: 122
You are executing an indirect activity allocation. What do you post to the sender and
receiver?
1.) You post costs only to both the sender and receiver.
2.) You post both quantity and cost to the receiver and cost only to the sender.
3.) You post both quantity and cost to the sender and cost only to the receiver.
4.) You post quantity and cost to both the sender and receiver.
Correct Answer: 4
Question: 123
You are implementing SAP S/4HANA and you want to run analytical reports off a single
data model. Which statement best describes reporting in SAP S/4HANA?
1.) Reporting can be either broad and deep for analysis, or speedy and simple, but not
both
2.) Reporting analytical data is always done in a business warehouse system.
3.) Reporting on data is available in real-time at every level of detail.
4.) Reporting on data in real-time is difficult, and complex to design.
Correct Answer: 3
Question: 124
You are posting a purchase order for a warehouse material. From which object is the
profit center derived?
Correct Answer: 1
Question: 125
You are setting up a costing-based Profitability Analysis for your organization. How do you
configure the different market segments?
Correct Answer: 4
Question: 126
You are setting up a direct internal activity allocation in SAP S/4HANA. What are valid
receivers for the activity? (3 Correct)
You are setting up costing-based Profitability Analysis for your organization. How do you
configure the different market segments?
Correct Answer: 4
Question: 128
You are using availability control in your SAP S/4HANA system. Which documents can
cause the system to raise a warning message when the budget was exceeded? (2 Correct)
Question: 129
You configured an overhead costing sheet that uses the quantity-based overhead approach
to calculate the overhead amount. What is required for the amount to be calculated?
Correct Answer: 1
Question: 130
You define rules in a status profile and assign the profile to your internal order type. What
do you use the status profile for? (3 Correct)
1.) To permit or forbid specific transactions
2.) To set the initial status as Created or Released
3.) To activate the CO partner update
4.) To define the user status
5.) To define users for the order
Question: 131
You enter the actual activity quality for work and vacation in the cross-application
timesheet. Which options can you choose in the master data of the activity type to ensure
the quantities and values are posted in Management Accounting? (2 Correct)
Question: 132
You have activated budget availability control for an internal order and entered an overall
budget of 10000. Actuals of 10000 was posted for this internal order in the current year.
How is that possible? (2 Correct)
1.) The difference of 1000 is within the tolerance limits defined in the configuration.
2.) The purchase order has NOT generated a budget document yet.
3.) The cost element is exempted from budget availability control
4.) The purchase order was entered in a different year than the budget.
Question: 133
You have implemented Product Cost by Sales Order in conjunction with cost-based POC
results analysis in your organization. For a particular sales order item, you have the
following: Plan revenue = 3000 Plan costs = 2000 Actual revenue = 1200 Actual costs =
1000 What data does the system calculate during results analysis?
1.) Revenue = 1500; Cost of sales = 1000; Revenue surplus = 300
2.) Revenue = 1200; Cost of sales = 1000; Capitalized revenue (revenue in excess of
billings) = 200
3.) Revenue = 1500; Cost of sales = 1000; Capitalized revenue (revenue in excess of
billings) = 300
4.) Revenue = 1200; Cost of sales = 1000; Revenue surplus = 200
Correct Answer: 3
Question: 134
You have implemented Product Cost by Sales Order in conjunction with revenue-based
results analysis in your organization. For a particular sales order item, you have the
following:- Plan revenue = 3000- Plan costs = 2000- Actual revenue = 1200- Actual costs
= 1000What data does the system calculate during results analysis?
Correct Answer: 4
Question: 135
You need to assign a company code to a controlling area. Which settings must be identical
for both organizational objects? (2 Correct)
Question: 136
You perform a settlement with a primary cost account which is different from the cost
account you used to post the original expense. Which object is a valid receiver for the
settlement?
1.) WBS element
2.) Fixed asset
3.) Cost center
4.) Internal order
Correct Answer: 2
Question: 137
You post a billing document in Sales and Distribution (SD). What data flows to Profit
Center Accounting? (3 Correct)
Question: 138
You post an expense line in an accounting document and enter an internal order and a
cost center as the account assignments. After posting, the system allows you to settle the
posted values from the internal order. Which settings do the cost center and internal
order have?
Correct Answer: 1
Question: 139
You use a ledger, an additional standard ledger and an extension ledger. You post a
general journal entry without indicating a ledger group. For which ledger(s) are separate
line items posted in the universal journal?
Question: 140
You use a production order with Product Cost by Period and you entered a results analysis
key and variance key. How does the system calculate variances in Product Cost by Period?
Correct Answer: 4
Question: 141
You want to configure different cost centers in your company. Which setting in the cost
center master data will you use to assign the same attributes to similar cost centers?
Correct Answer: 2
Question: 142
You want to create a new standard cost estimate based on the quantity structure of the
existing standard cost estimate. Which object do you use?
Correct Answer: 4
Question: 143
You want to create alternative plan versions for your controlling area, in addition to
version 000. What would you use additional CO versions for? (2 Correct)
Question: 144
You want to create cost centers for your company. What is the prerequisite to building an
organizational structure for overhead cost controlling?
Correct Answer: 4
Question: 145
You want to define requirement levels for users for the authorization check in Profitability
Analysis reporting. Which requirement level would you set to enable user access to all the
interactive drill down functions?
1.) 2 - Level 2
2.) 0 - ALL
3.) 1 - Level 1
4.) 3 - ALL
Correct Answer: 2
Question: 146
You want to derive the profitability segment for a line item in the universal journal using
SAP S/4HANA standard configuration. What requirements must be fulfilled? (2 Correct)
1.) Account-based Profitability Analysis must be active
2.) The type of the corresponding general ledger account must be primary cost/revenue or
secondary cost.
3.) Costing-based Profitability Analysis must be active.
4.) The type of the corresponding general ledger account must be balance sheet.
Question: 147
You want to determine which operations of the routing should be considered in a product
cost calculation. How do you do this? (2 Correct)
Question: 148
You want to enable WIP calculation in Product Cost by Period. What do you need to
configure?
Correct Answer: 3
Question: 149
You want to maintain a cost component structure. What can you determine for each cost
component? (3 Correct)
You want to prevent periodic cost fluctuations. Which activity should you choose to
distribute irregular expenses to the relevant periods?
Correct Answer: 1
Question: 151
You want to run an assessment cycle in Profitability Analysis to allocate cost center costs
during period-end closing for your organization. Which of the following objects is part of
the assessment cycle?
1.) Template
2.) PA transfer structure
3.) Tracing factor
4.) Cycle iteration
Correct Answer: 3
Question: 152
You want to set up budget availability control for your projects and internal orders. What
can you check using budget availability control? (2 Correct)
Question: 153
You want to set up integrated planning for your internal orders. What do you need to do?
(2 Correct)
1.) Set the relevant indicator in the controlling area.
2.) Set the relevant indicators in the CO version.
3.) Set the relevant indicator in the planning profile of the order type.
4.) Set the relevant indicator in the internal order master record.
Question: 154
You want to settle primary cost elements and secondary cost elements to different
receivers. What do you use?
Correct Answer: 3
Question: 155
You want to understand why costs are collected on the sales order item level. What do you
need to check in the configuration? (3 Correct)
Question: 156
You want to use a template for activity and process assignment to your material cost
estimate. What do you need to do?
1.) Assign a template directly to costing view 1 of the material master record
2.) Use the costing sheet of the costing view 1 in the template determination table
3.) Assign a template to an operation in the routing of the material
4.) Use the template allocation function in the material cost estimate and the costing run
Correct Answer: 4
Question: 157
You want to use a template to consider overhead during product costing. How do you
assign the template to your material?
Correct Answer: 4
Question: 158
You would like to allocate primary and secondary costs from a cost center to another cost
center. Which allocation method will you use?
Correct Answer: 3
Question: 159
Your customer defined one distribution cycle in SAP S/4HANA. You need to define a new
distribution cycle. How can you ensure the new cycle is executed only after the existing
one is completed?
Correct Answer: 1
Question: 160
Your customer uses account-based CO-PA. Which sales documents create an account-
based CO-PA line item for each standard ledger in the universal journal table in SAP
S/4HANA 1809? (2 Correct)