Progress Summary - Punch list at COD-1
Lot Open at Open As of %
member COD-1* 12-Jan-24 Open
Lot-1 46
Lot-2 49
Lot-3 238 15 6%
Lot-4 60
Total 393 15 4%
*28-Sep-23 File
OAB 1
FRP 6
30-Dec-23 1-Feb-24 1-Mar-24
24-Nov-23 1-Dec-23 8-Dec-23 15-Dec-23 22-Dec-23 29-Dec-23 After 1-Apr-24 Shut down
~31-Jan-24 ~29-Feb-24 ~31-Mar-24
0 0 2 1 0 1 4 1
0 0 2 1 0 1
2 3 2 0 0 2 9
2 3 2 0 0 1
15 12 6 14 18 5 14 0 2 13 7
12 11 5 4 8 7 16
2 2 5 2 1 1 2
2 2 5 1 1 2 0
Out of scope (waiting
TBD
to close)
0 0
0 1 1
Unit 1 - Defect closing plan (After COD) Lot 3
For all FRP pipe punchs, L3 updated start up logic andMPW to design spacer for Unit 2, VPCL replied no comment.
FL+6000, vent line Absorber inlet FRP piping is cracked at the flanges after Required U1,U2
24 KVPS SO 5 Procurement team will find out local supplier and provide delivery schedule. Both Unit1 and Unit 2 need to shutdown 3 30-Apr-24 3 days
FRP repairing. shutdown
days for replacement.
For all FRP pipe punchs, L3 updated start up logic andMPW to design spacer for Unit 2, VPCL replied no comment.
FL+33600 The cracks found at neck of flanges of the Absober spray header Required U1,U2
27 KVPS SO 3 Procurement team will find out local supplier and provide delivery schedule. Both Unit1 and Unit 2 need to shutdown 3 30-Apr-24 3 days
FRP pipe ( KKS: =10HTQ01 - BR010 - 15FRP - SWS DN2250) shutdown
days for replacement.
53
[17/Jan]
02
Commissioning RCA-COM-RP- %
Required U1
66 ID fan 1A1B ID fan 1A1B outlet damper flue gas condensation issue N/A U2 inspection completed, have no any damage. Rubber seal for U1 arrive site on 15 Dec. Waiting U1 shutdown for
H
N 30-Apr-24 8 days
RCA 0040 aC shutdown
replacement on Nov 2024.
L
O
H
S
u
S
For all FRP pipe punchs, L3 updated start up logic andMPW to design spacer for Unit 2, VPCL replied no comment.
p
u
FGD Jockey Pump For all FRP pipe punchs, L3 updated start up logic andMPW to design spacer for Unit 2, VPCL replied no comment.
Required U1,U2
85 TOWD5 25 House Absorber pump FRP pipe crack Procurement team will find out local supplier and provide delivery schedule. Both Unit1 and Unit 2 need to shutdown 3 30-Apr-24 3 days
shutdown
FRP days for replacement.
Oxidation Air Blower For all FRP pipe punchs, L3 updated start up logic andMPW to design spacer for Unit 2, VPCL replied no comment.
Required U1,U2
89 TOWD5 43 Building Aeration air cooler FRP pipe has crack Procurement team will find out local supplier and provide delivery schedule. Both Unit1 and Unit 2 need to shutdown 3 30-Apr-24 3 days
shutdown
FRP days for replacement.
We disagree, it should be
NCR
96 NA Auxiliary Boiler NCR was closed however Lot-3 and VPCL shall settle commercially To be discussed commercially separately by PJ 30-Apr-24 Not Required NA part of the Punch list and To be discussed commercially separately
Other
recorded
We disagree, it should be
NCR SW Pipe
97 NA NCR was closed however Lot-3 and VPCL shall settle commercially To be discussed commercially separately by PJ 30-Apr-24 Not Required NA part of the Punch list and To be discussed commercially separately
Other deformation
recorded