Daily Activities Report (Time Sheet)

Project Management Consulting Services for


Project Name:
Construction of LRT Jakarta Phase 1B (Velordome - Manggarai)

Code Position Position Name


B21+B22 Assistant Resident Engineer Civil 1+2 Irwan Fikri

December-2023

Working Working Hours


Date Day Work Description /Remarks
Location Start Finish Total

Gedung MCC Lt.3, 1. Making Daily Report


31 Friday 08.00 17.00 8
Depo LRT Jakarta 2. Review and checking document of RFI, Method statement

Gedung MCC Lt.3,


1 Saturday Depo LRT Jakarta

Gedung MCC Lt.3,


2 Sunday Depo LRT Jakarta

1. Making Daily Report


Gedung MCC Lt.3,
3 Monday Depo LRT Jakarta 08.00 17.00 8 2. Making Weekly Report
3. Review RFI, Methode stament

1. Making Daily Report


Gedung MCC Lt.3,
4 Tuesday Depo LRT Jakarta 08.00 17.00 8 2. Review and checking document of RFI, Method statement
3. Review Shop Drawing
1. Making Daily Report
5 Wednesday Gedung MCC Lt.3,
Depo LRT Jakarta 08.00 17.00 8 2. Review and checking document of RFI, Method statement
3. Review Shop Drawing
1. Making Daily Report
Gedung MCC Lt.3,
6 Thursday Depo LRT Jakarta 08.00 17.00 8 2. Review and checking document of RFI, Method statement
3. Review Shop Drawing

Gedung MCC Lt.3, 1. Making Daily Report


7 Friday 08.00 17.00 8
Depo LRT Jakarta 2. Review and checking document of RFI, Method statement

Gedung MCC Lt.3,


8 Saturday Depo LRT Jakarta

Gedung MCC Lt.3,


9 Sunday Depo LRT Jakarta

1. Making Daily Report


Gedung MCC Lt.3,
10 Monday Depo LRT Jakarta 08.00 17.00 8 2. Making Weekly Report
3. Review RFI, Methode stament

1. Making Daily Report


Gedung MCC Lt.3,
11 Tuesday Depo LRT Jakarta 08.00 17.00 8 2. Review and checking document of RFI, Method statement
3. Review Shop Drawing
1. Making Daily Report
12 Wednesday Gedung MCC Lt.3,
Depo LRT Jakarta 08.00 17.00 8 2. Review and checking document of RFI, Method statement
3. Review Shop Drawing

1. Making Daily Report


Gedung MCC Lt.3,
13 Thursday Depo LRT Jakarta 08.00 17.00 8 2. Review and checking document of RFI, Method statement
3. Review Shop Drawing

1. Making Daily Report


Gedung MCC Lt.3,
14 Friday Depo LRT Jakarta 08.00 17.00 8 2. Review and checking document of RFI, Method statement
3. Review Shop Drawing

15 Saturday Site Work P7B-P8B 18.00 24.00 4 Inspection Bored Pile Works at the site P7B and P8B

16 Sunday Site Work P7B-P8B 24.00 05.00 5 Inspection Bored Pile Works at the site P7B and P8B
Daily Activities Report (Time Sheet)
Project Management Consulting Services for
Project Name:
Construction of LRT Jakarta Phase 1B (Velordome - Manggarai)

Code Position Position Name


B21+B22 Assistant Resident Engineer Civil 1+2 Irwan Fikri

December-2023

Working Working Hours


Date Day Work Description /Remarks
Location Start Finish Total

1. Making Daily Report


Gedung MCC Lt.3,
17 Monday Depo LRT Jakarta 08.00 17.00 8 2. Making Weekly Report
3. Review RFI, Methode stament

Gedung MCC Lt.3, 1. Making Daily Report


18 Tuesday 08.00 17.00 8
Depo LRT Jakarta 2. Review and checking document of RFI, Method statement

1. Making Daily Report


19 Wednesday Gedung MCC Lt.3,
Depo LRT Jakarta 08.00 17.00 8 2. Review and checking document of RFI, Method statement
3. Review Shop Drawing

1. Making Daily Report


Gedung MCC Lt.3,
20 Thursday Depo LRT Jakarta 08.00 17.00 8 2. Review and checking document of RFI, Method statement
3. Review Shop Drawing
1. Making Daily Report
PT. Guna Sukses
21 Friday at Cikarang 08.00 17.00 8 2. Review and checking document of RFI, Method statement
3. Review Shop Drawing

Site Work P8B-


22 Saturday P10B 18.00 24.00 4 Inspection Bored Pile Works at the site P9B and P10B

Site Work P8B-


23 Sunday P10B 24.00 09.00 9 Inspection Bored Pile Works at the site P9B and P10B

Gedung MCC Lt.3,


24 Monday Depo LRT Jakarta

25 Tuesday

1. Making Daily Report


26 Wednesday Gedung MCC Lt.3,
Depo LRT Jakarta 08.00 17.00 8 2. Review and checking document of RFI, Method statement
3. Review Shop Drawing

1. Making Daily Report


Gedung MCC Lt.3,
27 Thursday Depo LRT Jakarta 08.00 17.00 8 2. Review and checking document of RFI, Method statement
3. Review Shop Drawing

Gedung MCC Lt.3, 1. Making Daily Report


28 Friday Depo LRT Jakarta 08.00 24.00 16 2. Review and checking document of RFI, Method statement
and Site Work 3. Planning : Inspection Bored Pile Works at the site

29 Saturday Site Work 24.00 09.00 9 1. Planning : Inspection Bored Pile Works at the site

30 Sunday
Total 191.0
Invoicing Total 1.00 MM

Prepared by, Approved by,

Irwan Fikri Mulianta Sinulingga


Assitant Resident
Project Director - OCG-OJD
Engineer Civil 1+2