POSORJA MULTIPURPOSE TERMINAL

TERMINAL WORKS

CONTRACTOR ENGINEER

CHINA HARBOUR CULLEN


GRUMMITT &
ROE

Material Test Report


Transformer (ABB)

Doc No. PMPT-MTR-FAT-004-02

REVISIONS RECORD
Rev. No. Date Issued by Approved by Description

Transformer (ABB)
01 19/07/2018 Pengtuan Zhang Bonus Zhang

Transformer (ABB)
02 06/08/2018 Pengtuan Zhang Bonus Zhang

03
Doc. No.: PMPT-MTR-FAT-
004-02
POSORJA MULTIPURPOSE TERMINAL WORKS
REV.2

Material Test Report Date: 6/08/2018

Transformer (ABB) Page: 2 of 3

Content

1.Objective .................................................................................................................................... 3

2. Sampling Place and Date ........................................................................................................... 3

3. Test Items .................................................................................................................................. 3

4. Attachment ............................................................................................................................... 3
Doc. No.: PMPT-MTR-
FAT-004-02
POSORJA MULTIPURPOSE TERMINAL
WORKS REV. 2

Material Test Report Transformer Date: 6/08/2018

(ABB) Page: 3 of 3

1 Objective

We want to know the performance of the product.

2 Sampling Place and Date

This test was performing in china on July 14th, 2018.

3 Test items

01 50kVA 0.46kV Test Record

02 160kVA 0.46kV Test Record

03 160kVA 13.8kV Test Record

04 315kVA 13.8kV Test Record

05 400kVA 13.8kV Test Record

06 1250kVA 13.8kV Test Record

07 2500kVA 13.8kV Test Record

4 Attachment

We will attach:

01 ABB transformer test report

02 Test certificate