You are on page 1of 22

Konsultan : KSO PT.

Mitrapacific Consulindo International


: PT.Buana Archicon
: PT. Indec Internusa
Contractor : Adhi - Acset

Sampled at : Bojong Mangu ( Cikeris 1 ) Lapis 5-10 m

Warna Tanah : Coklat Kehitaman

Soil Description : Common Borrow Material

PiAi : 17 November 2023

gradasi + SG : 12 November 2023

Proctor/compaction/KAA : 10 November 2023


1 2
cbr : 11 November 2023 11/11/2023 12/11/2023 13/11/2023

summary : 15 November 2023


Correct CBR
3 4
14/11/2023 15/11/2023
PROYEK PEMBANGUNAN JALAN TOL
JAKARTA-CIKAMPEK II SELATAN
PAKET IIB SUKARAGAM - SUKABUNGAH
(STA. 17+750 - STA.30+750)

JENIS TANAH : CUTTING

WERNA TANAH : ABU - ABU

LOKASI PENGAMBILAN : STA. 30+750 BOJONG MANGU (TITIK I)


PROYEK PEMBANGUNAN JALAN TOL
JAKARTA-CIKAMPEK II SELATAN
PAKET IIB SUKARAGAM - SUKABUNGAH
(STA. 17+750 - STA.30+750)

RINGKASAN HASIL TES LABORATORIUM


TANAH TIMBUNAN
Consultant : KSO PT. Mitrapacific Consulindo International
: PT.Buana Archicon
: PT. Indec Internusa
Contractor : Adhi - Acset
Sample at : Bojong Mangu ( Cikeris 1 ) Lapis 5-10 m
Sample at : Coklat Kehitaman
Soil Description : Common Borrow Material
Date : 15 November 2023

No Description Test Result Specification

1 Max Dry Density 1.140 gr/cm3 ~

2 Optimum Moisture Content 30.86 % ~

3 Liquid Limit 45.62 % ~

4 Plastic Limit 27.97 % ~

5 Plactic Index 17.65 % ~

6 Specific Gravity 2.212 gr/cm3 ~

7 CBR ( Soaked ) #REF! % Min 6 %

8 Sieve Analysis Material Dicuci


( mm ) ( inchi )
19.000 #3/8 100.00 % ~
4.750 #4 100.00 % ~
2.000 #10 100.00 % ~
1.180 #16 96.75 % ~
0.420 #40 95.60 % ~
0.300 #50 94.59 % ~
0.149 #100 90.74 % ~
0.074 #200 87.90 % ~

Diketahui Oleh, Diperiksa dan Disetujui Oleh, Dibuat Oleh,


Pemberi Tugas Konsultan Pengawas Kontraktor Pelaksana
PT. Jasamarga Japek Selatan PT. Mitrapacific Consulindo International KSO. Adhi - Acset KSO.
PT. Buana Archicon dan PT. Indec Internusa

( )
( ) ( )
PROYEK PEMBANGUNAN JALAN TOL
JAKARTA-CIKAMPEK II SELATAN
PAKET IIB SUKARAGAM - SUKABUNGAH
(STA. 17+750 - STA.30+750)

COMPACTION TEST FOR MDD

Consultant : KSO PT. Mitrapacific Consulindo International Standart Test : AASHTO


: PT.Buana Archicon Method Used : T.90
: PT. Indec Internusa Item Of Work : Earth Work
Contractor : Adhi - Acset Date Tested : 10 November 2023
Sampled at : Bojong Mangu ( Cikeris 1 ) Lapis 5-10 m
Soil Color : Coklat Kehitaman
Soil Description : Common Borrow Material
Test Perform By : Laboratory Contractor
KAA = 15 % ; Wt Sample = 2000 gr
Add. Water 86 CC 173 CC 259 CC 346 CC 433 CC
Weight Wet Soil + Mould 4396 4636 4719 4663 4521
Weight Mould 3300 3300 3300 3300 3300
Weight Wet Soil 1096 1336 1419 1363 1221
Volume Mould 955.6 955.6 955.6 955.6 955.6
Wet Density 1.147 1.398 1.485 1.426 1.278
Dry Density 0.897 1.092 1.126 1.093 0.940
WATER CONTENT
No. Sample 1 2 3 4 5
Wet Soil + Tare 102.40 105.60 88.20 108.60 110.50
Dry Soil + Tare 90.20 91.80 78.30 93.10 92.50
Weight Water 12.20 13.80 9.90 15.50 18.00
Weight Tare 46.40 42.60 47.20 42.30 42.40
Weight Dry Soil 43.80 49.20 31.10 50.80 50.10
Moisture Content 27.85 28.05 31.83 30.51 35.93

1.540
1.500
1.460
1.420
1.380 ZA
1.340 V
1.300
Dry Density ( Gr/cm3)

1.260
1.220
1.180 MDD 1,140 m
MDD == 1,140 m33
1.140
1.100
1.060
1.020
0.980
0.940
0.900 OMC
OMC == 30,86
30,86 %
%
0.860
0.820
0.780
19.00 21.00 23.00 25.00 27.00 29.00 31.00 33.00 35.00 37.00 39.00 41.00 43.00
Moisture Content ( % )

Compaction Method Standart


Bulk Specific Gravity 2.212 gr/cm3
Opt. Moisture Content 30.86 %
Max. Dry Density 1.140 gr/cm3
Diketahui Oleh, Diperiksa dan Disetujui Oleh, Dibuat Oleh,
Pemberi Tugas Konsultan Pengawas Kontraktor Pelaksana
PT. Jasamarga Japek Selatan PT. Mitrapacific Consulindo International KSO. PT. Adhi - Acset KSO.
Buana Archicon dan PT. Indec Internusa

( ) ( ) ( )
PROYEK PEMBANGUNAN JALAN TOL
JAKARTA-CIKAMPEK II SELATAN
PAKET IIB SUKARAGAM - SUKABUNGAH
(STA. 17+750 - STA.30+750)

LIQUID LIMIT & PLASTIC LIMIT TEST

Consultant : KSO PT. Mitrapacific Consulindo International Standart Test : AASHTO


: PT.Buana Archicon Method Used : T.89/T.90
: PT. Indec Internusa Item Of Work : Earth Work
Contractor : Adhi - Acset Date Tested : 17 November 2023
Sampled at : Bojong Mangu ( Cikeris 1 ) Lapis 5-10 m
Soil Color : Coklat Kehitaman
Soil Description : Common Borrow Material
Test Perform By : Laboratory Contractor

LIQUID LIMIT PLASTIC LIMIT


No. of Blows 10 21 30 41 52
No. of Pan N F 3 7 2 U 1
Weight wet soil+pan Gr 28.99 29.60 25.00 26.42 26.51 17.65 15.49
Weight dry soil+pan Gr 24.32 24.94 21.31 22.42 22.62 17.09 14.99
Weight of water Gr 4.67 4.66 3.69 4.00 3.89 0.56 0.50
Weight of pan Gr 14.99 15.00 13.04 12.90 12.99 15.28 12.99
Weight dry soil Gr 9.33 9.94 8.27 9.52 9.63 1.81 2.00
Moisture content % 50.05 46.88 44.62 42.02 40.39 30.94 25.00

68.00
64.00
60.00
56.00
52.00
Water Content (%)

48.00
44.00
40.00
36.00
32.00
28.00
24.00
20.00
6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60
Number Of Blows

TEST RESULT :
* LIQUID LIMIT = 45.62 %
* PLASTIC LIMIT = 27.97 %
* PLASTICITY INDEX = 17.65 %

Diketahui Oleh, Diperiksa dan Disetujui Oleh, Dibuat Oleh,


Pemberi Tugas Konsultan Pengawas Kontraktor Pelaksana
PT. Jasamarga Japek Selatan PT. Mitrapacific Consulindo International KSO. PT. Adhi - Acset KSO.
Buana Archicon dan PT. Indec Internusa

( ) ( ) ( )
PROYEK PEMBANGUNAN JALAN TOL
JAKARTA-CIKAMPEK II SELATAN
PAKET IIB SUKARAGAM - SUKABUNGAH
(STA. 17+750 - STA.30+750)

SIEVE ANALYSIS
Consultant : KSO PT. Mitrapacific Consulindo International Standart Test : ASTM
: PT.Buana Archicon Method Used : D 422-63
: PT. Indec Internusa Item Of Work : Earth Work
Contractor : Adhi - Acset Date Tested : 12 November 2023
Sampled at : Bojong Mangu ( Cikeris 1 ) Lapis 5-10 m
Soil Color : Coklat Kehitaman
Soil Description : Common Borrow Material
Test Perform By : Laboratory Contractor
Sample weight : 905.1 gr. Sample weight : 873.8 gr. AVERAGE
SIEVE
Sieve CUMULATIVE Sieve CUMULATIVE SPECIFICATION
% PASS
mm Inch WT.RET % RET. % PASS inch WT.RET % RET % PASS

9.5 #3/8 0.00 0.00 100.00 #3/8 0.00 0.00 100.00 100.00
4.75 #4 0 0.00 100.00 #4 0 0.00 100.00 100.00
2.00 #10 0 0.00 100.00 #10 0 0.00 100.00 100.00
0.85 #16 28.5 3.15 96.85 #16 29.3 3.35 96.65 96.75
0.42 #40 39.0 4.31 95.69 #40 39.3 4.50 95.50 95.60
0.18 #50 49.0 5.41 94.59 #50 47.2 5.40 94.60 94.59
0.149 #100 82.9 9.16 90.84 #100 81.8 9.36 90.64 90.74
0.074 #200 110.4 12.20 87.80 #200 104.9 12.01 87.99 87.90
REMARK : Material di Cuci
UNIFIELD SOILS CLASSIFICATIONS SYSTEM

SILT FINE SAND MEDIUM SAND C. SAND FINE GRAVEL

#200 #100 #50 #40 #16 #10 #4 #3/4


100

90

80

70

60

50

40

30

20

10

0
0.010 0.100 1.000 10.000 100.000

Diketahui Oleh, Diperiksa dan Disetujui Oleh, Dibuat Oleh,


Pemberi Tugas Konsultan Pengawas Kontraktor Pelaksana
PT. Jasamarga Japek Selatan PT. Mitrapacific Consulindo International KSO. PT. Adhi - Acset KSO.
Buana Archicon dan PT. Indec Internusa

( ) ( ) ( )
PROYEK PEMBANGUNAN JALAN TOL
JAKARTA-CIKAMPEK II SELATAN
PAKET IIB SUKARAGAM - SUKABUNGAH
(STA. 17+750 - STA.30+750)

SPECIFIC GRAVITY OF SOIL

Consultant : KSO PT. Mitrapacific Consulindo International Standart Test : AASHTO


: PT.Buana Archicon Method Used : T.100-74
: PT. Indec Internusa Item Of Work : Earth Work
Contractor : Adhi - Acset Date Tested : 12 November 2023
Sampled at : Bojong Mangu ( Cikeris 1 ) Lapis 5-10 m
Soil Color : Coklat Kehitaman
Soil Description : Common Borrow Material
Test Perform By : Laboratory Contractor

PICNOMETER SIZE 100 ML

PICNOMETER NUMBER C D

WEIGHT PICNOMETER + SOIL (W1) Gr 106.80 102.00

WEIGHT PICNOMETER (W2) Gr 56.80 52.00

WEIGHT SOIL WT=(W1-W2) Gr 50.00 50.00

TEMPERATUR 0
C 25.00 25.00

PICNOMETER + WATER + SOIL ON °C (W3) Gr 183.57 178.73

PICNOMETER + WATER ON 0C (W4) Gr 156.30 151.20

W1 - W2 + W4 (W5) Gr 206.30 201.20

VOLUME SOIL (W5-W3) Gr 22.73 22.47

SPECIFIC GRAVITY WT/(W5-W3) Gr/CM3 2.200 2.225

AVERAGE 2.212

Diketahui Oleh, Diperiksa dan Disetujui Oleh, Dibuat Oleh,


Pemberi Tugas Konsultan Pengawas Kontraktor Pelaksana
PT. Jasamarga Japek Selatan PT. Mitrapacific Consulindo International KSO. PT. Adhi - Acset KSO.
Buana Archicon dan PT. Indec Internusa

( ) ( ) ( )
PROYEK PEMBANGUNAN JALAN TOL
JAKARTA-CIKAMPEK II SELATAN
PAKET IIB SUKARAGAM - SUKABUNGAH
(STA. 17+750 - STA.30+750)

CORRECTION OF CALIFORNIA BEARING RATIO


Consultant : KSO PT. Mitrapacific Consulindo International
: PT.Buana Archicon
: PT. Indec Internusa
Contractor : Adhi - Acset
Sampled at : Bojong Mangu ( Cikeris 1 ) Lapis 5-10 m
Soil Color : Coklat Kehitaman
Soil Description : Common Borrow Material
Date : 15 November 2023

1.540 1.540

1.500 1.500

1.460 1.460

1.420 1.420

1.380 1.380

1.340 1.340

1.300 1.300

1.260 1.260

1.220 1.220
DRY DENSITY (Gr/cc)

1.180 1.180 65 X
MDD 100%
1.140 1.140

1.100 1.100
35 X
1.060 1.060

1.020 1.020

0.980 0.980

10 X
0.940 0.940

0.900 0.900

0.860 0.860

0.820 0.820 3.60 %

0.780 0.780
19 21 23 25 27 29 31 33 35 37 39 41 43 0 1 2 3 4 5 6
MOISTURE CONTENT (%) CBR ( % )

Cara Pemadatan : Standart


Kadar Air Optimum : 30.86 %
∂ d Maksimum : 1.140 gr/cm3
CBR (Soaked) : 3.65 %

Diketahui Oleh, Diperiksa dan Disetujui Oleh, Dibuat Oleh,


Pemberi Tugas Konsultan Pengawas Kontraktor Pelaksana
PT. Jasamarga Japek Selatan PT. Mitrapacific Consulindo International KSO. PT. Buana Adhi - Acset KSO.
Archicon dan PT. Indec Internusa

( ) ( ) ( )
PROYEK PEMBANGUNAN JALAN TOL
JAKARTA-CIKAMPEK II SELATAN
PAKET IIB SUKARAGAM - SUKABUNGAH
(STA. 17+750 - STA.30+750)

CBR TEST
10 X
Consultant : KSO PT. Mitrapacific Consulindo International Standart Test : AASHTO
: PT.Buana Archicon Method Used : T.193-83
: PT. Indec Internusa Item Of Work : Earth Work
Contractor : Adhi - Acset Date Tested : 11 November 2023
Sampled at : Bojong Mangu ( Cikeris 1 ) Lapis 5-10 m
Soil Color : Coklat Kehitaman
Soil Description : Common Borrow Material
Test Perform By : Laboratory Contractor
B before after
DATE 11-Nov-23 12-Nov-23 13-Nov-23 14-Nov-23 15-Nov-23 Weight wet soil + moul 9741 9875
TIME 14:25 14:25 14:25 14:25 14:25 Weight mould 7487 7487
READ 0.780 1.850 2.910 3.675 3.985 Weight wet soil 2254 2388
SWELL % 0.66 1.57 2.47 3.11 3.38 Volume mould 2086.77 2086.77
Wet Density 1.080 1.144
Dry Density 0.841 0.853

TIME PENETRATION LOAD


READ 150
(menit) (inch) (mm) (kg)
145
1/4 0.0125 0.32 0.5 5.99
140
1/2 0.025 0.64 1.5 17.98
135
1 0.050. 1.27 3.0 35.95
130
1 1/2 0.075 1.90 4.1 49.14
125
2 0.1 2.54 5.3 63.52
120
3 0.15 3.81 6.3 75.50
115
4 0.2 5.08 7.0 83.89
110
6 0.3 7.62 7.8 93.48
105
8 0.4 10.16 8.3 99.47
100
10 0.5 12.70 9.1 109.06
95
Faktor Kalibrasi ; 11.9845 lb/div
90
85
5 6
80
before after
75
Wet soil + tare 152.32 125.84
70
Dry soil + tare 127.95 104.74
65
Weigh tare 42.40 42.90
60
Weight water 24.37 21.10
55
Weight dry soil 85.55 61.84
50
Moisture content (%) 28.49 34.12
45
40

CBR Values 35
30
0.1" 0.2"
25
60 86
X 100 % X 100 %
20
Upper 3 x 1000 3 x 1500
15
2.00 % 1.91 %
10

X 100 % X 100 % 5
Lower 3 x 1000 3 x 1500
0
% % 0 0.05 0.1 0.15 0.2 0.25 0.3 0.35 0.4 0.45 0.5

Diketahui Oleh, Diperiksa dan Disetujui Oleh, Dibuat Oleh,


Pemberi Tugas Konsultan Pengawas Kontraktor Pelaksana
PT. Jasamarga Japek Selatan PT. Mitrapacific Consulindo International KSO. PT. Buana Adhi - Acset KSO.
Archicon dan PT. Indec Internusa

( ) ( ) ( )
PROYEK PEMBANGUNAN JALAN TOL
JAKARTA-CIKAMPEK II SELATAN
PAKET IIB SUKARAGAM - SUKABUNGAH
(STA. 17+750 - STA.30+750)

CBR TEST
35 X
Consultant : KSO PT. Mitrapacific Consulindo International Standart Test : AASHTO
: PT.Buana Archicon Method Used : T.193-83
: PT. Indec Internusa Item Of Work : Earth Work
Contractor : Adhi - Acset Date Tested : 11 November 2023
Sampled at : Bojong Mangu ( Cikeris 1 ) Lapis 5-10 m
Soil Color : Coklat Kehitaman
Soil Description : Common Borrow Material
Test Perform By : Laboratory Contractor
C before after
DATE 11-Nov-23 12-Nov-23 13-Nov-23 14-Nov-23 15-Nov-23 Weight wet soil + moul 10135 10245
TIME 14:30 14:30 14:30 14:30 14:30 Weight mould 7266 7266
READ 0.445 1.525 2.585 3.235 3.485 Weight wet soil 2869 2979
SWELL % 0.38 1.29 2.19 2.74 2.95 Volume mould 2086.77 2086.77
Wet Density 1.375 1.428
Dry Density 1.041 1.071

TIME PENETRATION LOAD


READ 230
410
(menit) (inch) (mm) (kg)
400
1/4 0.0125 0.32 1.0 11.98 220
390
1/2 0.025 0.64 1.9 22.77 380
210
370
1 0.050. 1.27 4.0 47.94 360
200
1 1/2 0.075 1.90 6.7 80.30 350
340
190
2 0.1 2.54 7.9 94.68 330
3 0.15 3.81 9.0 107.86 180
320
4 0.2 5.08 10.0 119.85 310
170
300
6 0.3 7.62 11.8 141.42 290
160
8 0.4 10.16 13.5 161.79 280
270
10 0.5 12.70 17.2 206.13 150
260
Faktor Kalibrasi ; 11.9845 lb/div 250
140
240
3 4 130
230
220
before after 120
210
Wet soil + tare 134.40 153.20 200
110
Dry soil + tare 113.25 125.50 190
180
100
Weigh tare 47.20 42.30 170
Weight water 21.15 27.70 90
160
150
Weight dry soil 66.05 83.20 80
140
Moisture content (%) 32.02 33.29 130
70
120
110
60
100
CBR Values 90
50
0.1" 0.2" 80
40
70
86 125 X 100 % 60
X 100 %
Upper 3 x 1000 3 x 1500 30
50
40
2.87 % 2.78 % 20
30
20
10
X 100 % X 100 % 10
Lower 3 x 1000 3 x 1500
0
% % 0 0.05 0.1 0.15 0.2 0.25 0.3 0.35 0.4 0.45 0.5

Diketahui Oleh, Diperiksa dan Disetujui Oleh, Dibuat Oleh,


Pemberi Tugas Konsultan Pengawas Kontraktor Pelaksana
PT. Jasamarga Japek Selatan PT. Mitrapacific Consulindo International KSO. PT. Buana Adhi - Acset KSO.
Archicon dan PT. Indec Internusa

( ) ( ) ( )
PROYEK PEMBANGUNAN JALAN TOL
JAKARTA-CIKAMPEK II SELATAN
PAKET IIB SUKARAGAM - SUKABUNGAH
(STA. 17+750 - STA.30+750)

CBR TEST
65 X
Consultant : KSO PT. Mitrapacific Consulindo International Standart Test : AASHTO
: PT.Buana Archicon Method Used : T.193-83
: PT. Indec Internusa Item Of Work : Earth Work
Contractor : Adhi - Acset Date Tested : 11 November 2023
Sampled at : Bojong Mangu ( Cikeris 1 ) Lapis 5-10 m
Soil Color : Coklat Kehitaman
Soil Description : Common Borrow Material
Test Perform By : Laboratory Contractor
A before after
DATE 11-Nov-23 12-Nov-23 13-Nov-23 14-Nov-23 15-Nov-23 Weight wet soil + moul 10690 10805
TIME 14:35 14:35 14:35 14:35 14:35 Weight mould 7363 7363
READ 0.250 0.620 1.470 2.020 2.470 Weight wet soil 3327 3442
SWELL % 0.21 0.53 1.25 1.71 2.09 Volume mould 2086.77 2086.77
Wet Density 1.594 1.649
Dry Density 1.211 1.259

TIME PENETRATION LOAD


READ 360
410
(menit) (inch) (mm) (kg)
400
350
1/4 0.0125 0.32 2.5 29.96 390
340
1/2 0.025 0.64 3.5 41.95 380
330
370
1 0.050. 1.27 6.5 77.90 320
360
1 1/2 0.075 1.90 9.5 113.85 310
350
300
340
2 0.1 2.54 11.9 142.62 290
330
3 0.15 3.81 13.9 166.58 320
280
4 0.2 5.08 15.0 179.77 310
270
300
6 0.3 7.62 16.5 197.74 260
290
250
8 0.4 10.16 21 251.67 280
240
270
10 0.5 12.70 26.7 319.99 230
260
Faktor Kalibrasi ; 11.9845 lb/div 220
250
240
210
1 2 230
200
220
190
before after 210
180
Wet soil + tare 133.92 175.69 200
170
190
Dry soil + tare 112.90 144.21 160
180
Weigh tare 46.40 42.60 150
170
Weight water 21.02 31.48 160
140
150
130
Weight dry soil 66.50 101.61 140
120
Moisture content (%) 31.61 30.98 130
110
120
100
110
90
100
CBR Values 80
90
0.1" 0.2" 80
70
70
60
133 185 X 100 % 60
X 100 % 50
Upper 3 x 1000 3 x 1500 50
40
40
4.43 % 4.11 % 30
30
20
20
X 100 % X 100 % 10
Lower 3 x 1000 3 x 1500
0
% % 0 0.05 0.1 0.15 0.2 0.25 0.3 0.35 0.4 0.45 0.5

Diketahui Oleh, Diperiksa dan Disetujui Oleh, Dibuat Oleh,


Pemberi Tugas Konsultan Pengawas Kontraktor Pelaksana
PT. Jasamarga Japek Selatan PT. Mitrapacific Consulindo International KSO. PT. Buana Adhi - Acset KSO.
Archicon dan PT. Indec Internusa

( ) ( ) ( )
DOKUMENTASI

CONTROL REPORT

JENIS PEKERJAAN :

Pengerinagn Sample material

Note:
Common Borrow Material
Quarry EX. KARANG LAYUNG 3

CONTROL REPORT

JENIS PEKERJAAN :

Pengambilan Sample Quarry

Note:
Common Borrow Material
Quarry EX. KARANG LAYUNG 3

CONTROL REPORT

JENIS PEKERJAAN :

PERSIAPAN PROCTOR
-- Timbang material

Note:
Common Borrow Material
Quarry EX. KARANG LAYUNG 3
DOKUMENTASI

CONTROL REPORT

JENIS PEKERJAAN :

PERSIAPAN PROCTOR
-- Penambahan kadar air dan
Pencampuran/pengadukan material
-- Ambil kadar air awal proctor

Note:
Common Borrow Material
Quarry EX. KARANG LAYUNG 3

CONTROL REPORT

JENIS PEKERJAAN :

-- Pengeringan Sample
-- Sampling Material
PERSIAPAN PROCTOR
-- Penambahan kadar air dan
Pencampuran/pengadukan material

Note:
Common Borrow Material
Quarry EX. KARANG LAYUNG 3

CONTROL REPORT

JENIS PEKERJAAN :

PERSIAPAN PROCTOR
-- Penambahan kadar air dan
Pencampuran/pengadukan material
-- Ambil kadar air awal proctor

Note:
Common Borrow Material
Quarry EX. KARANG LAYUNG 3
DOKUMENTASI

CONTROL REPORT

JENIS PEKERJAAN :

COMPACTION TEST FOR MDD


-- Timbang berat sample proctor

Note:
Common Borrow Material
Quarry EX. KARANG LAYUNG 3

CONTROL REPORT

JENIS PEKERJAAN :

-- COMPACTION TEST FOR MDD


( Proctor )
-- Ambil kadar air proctor

Note:
Common Borrow Material
Quarry EX. KARANG LAYUNG 3

CONTROL REPORT

JENIS PEKERJAAN :

COMPACTION TEST FOR MDD


-- Ambil kadar air proctor

Note:
Common Borrow Material
Quarry EX. KARANG LAYUNG 3
DOKUMENTASI

CONTROL REPORT

JENIS PEKERJAAN :

COMPACTION TEST FOR CBR LABOR


-- Penimbangan material
-- Penambahan kadar air dan
Pencampuran/pengadukan material
( CBR Sebelum )

Note:
Common Borrow Material
Quarry EX. KARANG LAYUNG 3

CONTROL REPORT

JENIS PEKERJAAN :

CBR LABORATORIUM
-- Ambil kadar air (Sebelum)
-- Penambahan kadar air
-- Pencampuran material

Note:
Common Borrow Material
Quarry EX. KARANG LAYUNG 3

CONTROL REPORT

JENIS PEKERJAAN :

COMPACTION TEST FOR MDD


-- Ambil Kadar Air Proctor

Note:
Common Borrow Material
Quarry EX. KARANG LAYUNG 3
DOKUMENTASI

CONTROL REPORT

JENIS PEKERJAAN :

Pengambilan Kadar Air Awal


Sebelum pencampuran CBR
SAMPLE CBR 10X 35X & 65X BLOWS

Note:
Common Borrow Material
Quarry EX. KARANG LAYUNG 3

CONTROL REPORT

JENIS PEKERJAAN :

CBR LABORATORIUM
-- COMPACTION TEST FOR CBR LABOR
10X 35X 65X Blows
-- Timbang sample dan Perendaman

Note:
Common Borrow Material
Quarry EX. KARANG LAYUNG 3

CONTROL REPORT

JENIS PEKERJAAN :

COMPACTION TEST FOR CBR LABOR


10X 35X 65X Blows
CBR Laboratorium

Note:
Common Borrow Material
Quarry EX. KARANG LAYUNG 3
DOKUMENTASI

CONTROL REPORT

JENIS PEKERJAAN :

Pengambilan Kadar Air (Sebelum) CBR


SAMPLE CBR 10X 35X & 65X BLOWS

Note:
Common Borrow Material
Quarry EX. KARANG LAYUNG 3

CONTROL REPORT

JENIS PEKERJAAN :

CBR LABORATORIUM
-- Pembacaaan Dial Penetrasi
10X 35X 65X Blows

Note:
Common Borrow Material
Quarry EX. KARANG LAYUNG 3

CONTROL REPORT

JENIS PEKERJAAN :

Angkat dan penirisan setelah perendaman


SAMPLE CBR 10X 35X & 65X BLOWS

Note:
Common Borrow Material
Quarry EX. KARANG LAYUNG 3
DOKUMENTASI

CONTROL REPORT

JENIS PEKERJAAN :

PERSIAPAN PROCTOR
-- Penambahan kadar air dan
Pencampuran/pengadukan material
-- Ambil kadar air awal proctor

Note:
Common Borrow Material
Quarry EX. KARANG LAYUNG 3

CONTROL REPORT

JENIS PEKERJAAN :

Pembacaaan Dial Penetrasi


10X 35X 65X Blows
CBR Laboratorium

Note:
Common Borrow Material
Quarry EX. KARANG LAYUNG 3

CONTROL REPORT

JENIS PEKERJAAN :

Pengambilan kadar air (Setelah) CBR penetrasi


10X 35X 65X Blows
CBR Laboratorium

Note:
Common Borrow Material
Quarry EX. KARANG LAYUNG 3
DOKUMENTASI

CONTROL REPORT

JENIS PEKERJAAN :

Pembacaaan Dial Penetrasi


10X 35X 65X Blows
CBR Laboratorium

Note:
Common Borrow Material
Quarry EX. KARANG LAYUNG 3

CONTROL REPORT

JENIS PEKERJAAN :

SPECIFIC GRAVITY OF SOIL

Note:
Common Borrow Material
Quarry EX. KARANG LAYUNG 3

CONTROL REPORT

JENIS PEKERJAAN :

SPECIFIC GRAVITY OF SOIL

Note:
Common Borrow Material
Quarry EX. KARANG LAYUNG 3
DOKUMENTASI

CONTROL REPORT

JENIS PEKERJAAN :

LIQUID LIMIT & PLASTIC LIMIT TEST


( Atterberg Test )

Note:
Common Borrow Material
Quarry EX. KARANG LAYUNG 3

CONTROL REPORT

JENIS PEKERJAAN :

LIQUID LIMIT & PLASTIC LIMIT TEST


( Atterberg Test )

Note:
Common Borrow Material
Quarry EX. KARANG LAYUNG 3

CONTROL REPORT

JENIS PEKERJAAN :

LIQUID LIMIT & PLASTIC LIMIT TEST


( Atterberg Test )

Note:
Common Borrow Material
Quarry EX. KARANG LAYUNG 3
DOKUMENTASI

CONTROL REPORT

JENIS PEKERJAAN :

Pembacaaan Dial Penetrasi


10X 35X 65X Blows
CBR Laboratorium

Note:
Common Borrow Material
Quarry EX. KARANG LAYUNG 3

CONTROL REPORT

JENIS PEKERJAAN :

Pembacaaan Dial Penetrasi


10X 35X 65X Blows
CBR Laboratorium

Note:
Common Borrow Material
Quarry EX. KARANG LAYUNG 3

CONTROL REPORT

JENIS PEKERJAAN :

Pembacaaan Dial Penetrasi


10X 35X 65X Blows
CBR Laboratorium

Note:
Common Borrow Material
Quarry EX. KARANG LAYUNG 3