PROYEK PEMBANGUNAN JALAN TOL
JAKARTA-CIKAMPEK II SELATAN
PAKET IIB SUKARAGAM - SUKABUNGAH
(STA. 17+750 - STA.30+750)
1.540
1.500
1.460
1.420
1.380 ZA
1.340 V
1.300
Dry Density ( Gr/cm3)
1.260
1.220
1.180 MDD 1,140 m
MDD == 1,140 m33
1.140
1.100
1.060
1.020
0.980
0.940
0.900 OMC
OMC == 30,86
30,86 %
%
0.860
0.820
0.780
19.00 21.00 23.00 25.00 27.00 29.00 31.00 33.00 35.00 37.00 39.00 41.00 43.00
Moisture Content ( % )
( ) ( ) ( )
PROYEK PEMBANGUNAN JALAN TOL
JAKARTA-CIKAMPEK II SELATAN
PAKET IIB SUKARAGAM - SUKABUNGAH
(STA. 17+750 - STA.30+750)
68.00
64.00
60.00
56.00
52.00
Water Content (%)
48.00
44.00
40.00
36.00
32.00
28.00
24.00
20.00
6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60
Number Of Blows
TEST RESULT :
* LIQUID LIMIT = 45.62 %
* PLASTIC LIMIT = 27.97 %
* PLASTICITY INDEX = 17.65 %
( ) ( ) ( )
PROYEK PEMBANGUNAN JALAN TOL
JAKARTA-CIKAMPEK II SELATAN
PAKET IIB SUKARAGAM - SUKABUNGAH
(STA. 17+750 - STA.30+750)
SIEVE ANALYSIS
Consultant : KSO PT. Mitrapacific Consulindo International Standart Test : ASTM
: PT.Buana Archicon Method Used : D 422-63
: PT. Indec Internusa Item Of Work : Earth Work
Contractor : Adhi - Acset Date Tested : 12 November 2023
Sampled at : Bojong Mangu ( Cikeris 1 ) Lapis 5-10 m
Soil Color : Coklat Kehitaman
Soil Description : Common Borrow Material
Test Perform By : Laboratory Contractor
Sample weight : 905.1 gr. Sample weight : 873.8 gr. AVERAGE
SIEVE
Sieve CUMULATIVE Sieve CUMULATIVE SPECIFICATION
% PASS
mm Inch WT.RET % RET. % PASS inch WT.RET % RET % PASS
9.5 #3/8 0.00 0.00 100.00 #3/8 0.00 0.00 100.00 100.00
4.75 #4 0 0.00 100.00 #4 0 0.00 100.00 100.00
2.00 #10 0 0.00 100.00 #10 0 0.00 100.00 100.00
0.85 #16 28.5 3.15 96.85 #16 29.3 3.35 96.65 96.75
0.42 #40 39.0 4.31 95.69 #40 39.3 4.50 95.50 95.60
0.18 #50 49.0 5.41 94.59 #50 47.2 5.40 94.60 94.59
0.149 #100 82.9 9.16 90.84 #100 81.8 9.36 90.64 90.74
0.074 #200 110.4 12.20 87.80 #200 104.9 12.01 87.99 87.90
REMARK : Material di Cuci
UNIFIELD SOILS CLASSIFICATIONS SYSTEM
90
80
70
60
50
40
30
20
10
0
0.010 0.100 1.000 10.000 100.000
( ) ( ) ( )
PROYEK PEMBANGUNAN JALAN TOL
JAKARTA-CIKAMPEK II SELATAN
PAKET IIB SUKARAGAM - SUKABUNGAH
(STA. 17+750 - STA.30+750)
PICNOMETER NUMBER C D
TEMPERATUR 0
C 25.00 25.00
AVERAGE 2.212
( ) ( ) ( )
PROYEK PEMBANGUNAN JALAN TOL
JAKARTA-CIKAMPEK II SELATAN
PAKET IIB SUKARAGAM - SUKABUNGAH
(STA. 17+750 - STA.30+750)
1.540 1.540
1.500 1.500
1.460 1.460
1.420 1.420
1.380 1.380
1.340 1.340
1.300 1.300
1.260 1.260
1.220 1.220
DRY DENSITY (Gr/cc)
1.180 1.180 65 X
MDD 100%
1.140 1.140
1.100 1.100
35 X
1.060 1.060
1.020 1.020
0.980 0.980
10 X
0.940 0.940
0.900 0.900
0.860 0.860
0.780 0.780
19 21 23 25 27 29 31 33 35 37 39 41 43 0 1 2 3 4 5 6
MOISTURE CONTENT (%) CBR ( % )
( ) ( ) ( )
PROYEK PEMBANGUNAN JALAN TOL
JAKARTA-CIKAMPEK II SELATAN
PAKET IIB SUKARAGAM - SUKABUNGAH
(STA. 17+750 - STA.30+750)
CBR TEST
10 X
Consultant : KSO PT. Mitrapacific Consulindo International Standart Test : AASHTO
: PT.Buana Archicon Method Used : T.193-83
: PT. Indec Internusa Item Of Work : Earth Work
Contractor : Adhi - Acset Date Tested : 11 November 2023
Sampled at : Bojong Mangu ( Cikeris 1 ) Lapis 5-10 m
Soil Color : Coklat Kehitaman
Soil Description : Common Borrow Material
Test Perform By : Laboratory Contractor
B before after
DATE 11-Nov-23 12-Nov-23 13-Nov-23 14-Nov-23 15-Nov-23 Weight wet soil + moul 9741 9875
TIME 14:25 14:25 14:25 14:25 14:25 Weight mould 7487 7487
READ 0.780 1.850 2.910 3.675 3.985 Weight wet soil 2254 2388
SWELL % 0.66 1.57 2.47 3.11 3.38 Volume mould 2086.77 2086.77
Wet Density 1.080 1.144
Dry Density 0.841 0.853
CBR Values 35
30
0.1" 0.2"
25
60 86
X 100 % X 100 %
20
Upper 3 x 1000 3 x 1500
15
2.00 % 1.91 %
10
X 100 % X 100 % 5
Lower 3 x 1000 3 x 1500
0
% % 0 0.05 0.1 0.15 0.2 0.25 0.3 0.35 0.4 0.45 0.5
( ) ( ) ( )
PROYEK PEMBANGUNAN JALAN TOL
JAKARTA-CIKAMPEK II SELATAN
PAKET IIB SUKARAGAM - SUKABUNGAH
(STA. 17+750 - STA.30+750)
CBR TEST
35 X
Consultant : KSO PT. Mitrapacific Consulindo International Standart Test : AASHTO
: PT.Buana Archicon Method Used : T.193-83
: PT. Indec Internusa Item Of Work : Earth Work
Contractor : Adhi - Acset Date Tested : 11 November 2023
Sampled at : Bojong Mangu ( Cikeris 1 ) Lapis 5-10 m
Soil Color : Coklat Kehitaman
Soil Description : Common Borrow Material
Test Perform By : Laboratory Contractor
C before after
DATE 11-Nov-23 12-Nov-23 13-Nov-23 14-Nov-23 15-Nov-23 Weight wet soil + moul 10135 10245
TIME 14:30 14:30 14:30 14:30 14:30 Weight mould 7266 7266
READ 0.445 1.525 2.585 3.235 3.485 Weight wet soil 2869 2979
SWELL % 0.38 1.29 2.19 2.74 2.95 Volume mould 2086.77 2086.77
Wet Density 1.375 1.428
Dry Density 1.041 1.071
( ) ( ) ( )
PROYEK PEMBANGUNAN JALAN TOL
JAKARTA-CIKAMPEK II SELATAN
PAKET IIB SUKARAGAM - SUKABUNGAH
(STA. 17+750 - STA.30+750)
CBR TEST
65 X
Consultant : KSO PT. Mitrapacific Consulindo International Standart Test : AASHTO
: PT.Buana Archicon Method Used : T.193-83
: PT. Indec Internusa Item Of Work : Earth Work
Contractor : Adhi - Acset Date Tested : 11 November 2023
Sampled at : Bojong Mangu ( Cikeris 1 ) Lapis 5-10 m
Soil Color : Coklat Kehitaman
Soil Description : Common Borrow Material
Test Perform By : Laboratory Contractor
A before after
DATE 11-Nov-23 12-Nov-23 13-Nov-23 14-Nov-23 15-Nov-23 Weight wet soil + moul 10690 10805
TIME 14:35 14:35 14:35 14:35 14:35 Weight mould 7363 7363
READ 0.250 0.620 1.470 2.020 2.470 Weight wet soil 3327 3442
SWELL % 0.21 0.53 1.25 1.71 2.09 Volume mould 2086.77 2086.77
Wet Density 1.594 1.649
Dry Density 1.211 1.259
( ) ( ) ( )
DOKUMENTASI
CONTROL REPORT
JENIS PEKERJAAN :
Note:
Common Borrow Material
Quarry EX. KARANG LAYUNG 3
CONTROL REPORT
JENIS PEKERJAAN :
Note:
Common Borrow Material
Quarry EX. KARANG LAYUNG 3
CONTROL REPORT
JENIS PEKERJAAN :
PERSIAPAN PROCTOR
-- Timbang material
Note:
Common Borrow Material
Quarry EX. KARANG LAYUNG 3
DOKUMENTASI
CONTROL REPORT
JENIS PEKERJAAN :
PERSIAPAN PROCTOR
-- Penambahan kadar air dan
Pencampuran/pengadukan material
-- Ambil kadar air awal proctor
Note:
Common Borrow Material
Quarry EX. KARANG LAYUNG 3
CONTROL REPORT
JENIS PEKERJAAN :
-- Pengeringan Sample
-- Sampling Material
PERSIAPAN PROCTOR
-- Penambahan kadar air dan
Pencampuran/pengadukan material
Note:
Common Borrow Material
Quarry EX. KARANG LAYUNG 3
CONTROL REPORT
JENIS PEKERJAAN :
PERSIAPAN PROCTOR
-- Penambahan kadar air dan
Pencampuran/pengadukan material
-- Ambil kadar air awal proctor
Note:
Common Borrow Material
Quarry EX. KARANG LAYUNG 3
DOKUMENTASI
CONTROL REPORT
JENIS PEKERJAAN :
Note:
Common Borrow Material
Quarry EX. KARANG LAYUNG 3
CONTROL REPORT
JENIS PEKERJAAN :
Note:
Common Borrow Material
Quarry EX. KARANG LAYUNG 3
CONTROL REPORT
JENIS PEKERJAAN :
Note:
Common Borrow Material
Quarry EX. KARANG LAYUNG 3
DOKUMENTASI
CONTROL REPORT
JENIS PEKERJAAN :
Note:
Common Borrow Material
Quarry EX. KARANG LAYUNG 3
CONTROL REPORT
JENIS PEKERJAAN :
CBR LABORATORIUM
-- Ambil kadar air (Sebelum)
-- Penambahan kadar air
-- Pencampuran material
Note:
Common Borrow Material
Quarry EX. KARANG LAYUNG 3
CONTROL REPORT
JENIS PEKERJAAN :
Note:
Common Borrow Material
Quarry EX. KARANG LAYUNG 3
DOKUMENTASI
CONTROL REPORT
JENIS PEKERJAAN :
Note:
Common Borrow Material
Quarry EX. KARANG LAYUNG 3
CONTROL REPORT
JENIS PEKERJAAN :
CBR LABORATORIUM
-- COMPACTION TEST FOR CBR LABOR
10X 35X 65X Blows
-- Timbang sample dan Perendaman
Note:
Common Borrow Material
Quarry EX. KARANG LAYUNG 3
CONTROL REPORT
JENIS PEKERJAAN :
Note:
Common Borrow Material
Quarry EX. KARANG LAYUNG 3
DOKUMENTASI
CONTROL REPORT
JENIS PEKERJAAN :
Note:
Common Borrow Material
Quarry EX. KARANG LAYUNG 3
CONTROL REPORT
JENIS PEKERJAAN :
CBR LABORATORIUM
-- Pembacaaan Dial Penetrasi
10X 35X 65X Blows
Note:
Common Borrow Material
Quarry EX. KARANG LAYUNG 3
CONTROL REPORT
JENIS PEKERJAAN :
Note:
Common Borrow Material
Quarry EX. KARANG LAYUNG 3
DOKUMENTASI
CONTROL REPORT
JENIS PEKERJAAN :
PERSIAPAN PROCTOR
-- Penambahan kadar air dan
Pencampuran/pengadukan material
-- Ambil kadar air awal proctor
Note:
Common Borrow Material
Quarry EX. KARANG LAYUNG 3
CONTROL REPORT
JENIS PEKERJAAN :
Note:
Common Borrow Material
Quarry EX. KARANG LAYUNG 3
CONTROL REPORT
JENIS PEKERJAAN :
Note:
Common Borrow Material
Quarry EX. KARANG LAYUNG 3
DOKUMENTASI
CONTROL REPORT
JENIS PEKERJAAN :
Note:
Common Borrow Material
Quarry EX. KARANG LAYUNG 3
CONTROL REPORT
JENIS PEKERJAAN :
Note:
Common Borrow Material
Quarry EX. KARANG LAYUNG 3
CONTROL REPORT
JENIS PEKERJAAN :
Note:
Common Borrow Material
Quarry EX. KARANG LAYUNG 3
DOKUMENTASI
CONTROL REPORT
JENIS PEKERJAAN :
Note:
Common Borrow Material
Quarry EX. KARANG LAYUNG 3
CONTROL REPORT
JENIS PEKERJAAN :
Note:
Common Borrow Material
Quarry EX. KARANG LAYUNG 3
CONTROL REPORT
JENIS PEKERJAAN :
Note:
Common Borrow Material
Quarry EX. KARANG LAYUNG 3
DOKUMENTASI
CONTROL REPORT
JENIS PEKERJAAN :
Note:
Common Borrow Material
Quarry EX. KARANG LAYUNG 3
CONTROL REPORT
JENIS PEKERJAAN :
Note:
Common Borrow Material
Quarry EX. KARANG LAYUNG 3
CONTROL REPORT
JENIS PEKERJAAN :
Note:
Common Borrow Material
Quarry EX. KARANG LAYUNG 3