FIBER OPTICS

BACKBONE DESIGN
TOWN OF TALAVERA

PREPARED BY.
JOHN MARK NOVENO
ARVIN KARL HERMOSA
JOSE IV PUNONGBAYAN
JAMES LESTER NAUNGAYAN
MARK JOSEPH MANGARIN
ROMAR UMALI
STEPHEN KYLE LOPEZ
MAP OVERVIEW
AND OFFICE
DESIGNATION
LEGEND
1. ALL DIMENSION ARE IN MM
UNLESS OTHERWISE STATED.
2. CONTRACTORS SHALL OBTAIN
NECESSARY WORK PERMIT PRIOR
TO CONSTRUCTION ACTIVITIES
3. ALL WORKS MUST COMPLY WITH
ALL THE PROVIDED COMMUNICATION
STANDARD

TALAVERA-MUNOZ LINK

TALAVERA-BALOC LINK

TALAVERA-LLANERA LINK

CENTRAL OFFICE FIBER

No. Revision/Issue. Date


Firm Name and Address

TALAVERA-RIZAL LINK NOVA CORP. FIBER SERVICES


Brgy. Andal Alino, Talavera, Nueva Ecija

Project Name and Address

PROPOSED MAP OF FIBER LINK


TOWN OF TALAVERA

TALAVERA-CABANATUAN LINK Project


FIBER OPTICS NETWORK DESIGN
OF TALAVERA,NUEVA ECIJA
Sheet

01
Date

DECEMBER 11,2023
Scale
LEGEND
1. ALL DIMENSION ARE IN MM
UNLESS OTHERWISE STATED.
2. CONTRACTORS SHALL OBTAIN
NECESSARY WORK PERMIT PRIOR
TO CONSTRUCTION ACTIVITIES
3. ALL WORKS MUST COMPLY WITH
ALL THE PROVIDED COMMUNICATION
STANDARD

TALAVERA-MUNOZ LINK

TALAVERA-BALOC LINK

TALAVERA-LLANERA LINK

CENTRAL OFFICE FIBER

No. Revision/Issue. Date


Firm Name and Address

TALAVERA-RIZAL LINK NOVA CORP. FIBER SERVICES


Brgy. Andal Alino, Talavera, Nueva Ecija

Project Name and Address

PROPOSED MAP OF FIBER LINK


TOWN OF TALAVERA

TALAVERA-CABANATUAN LINK Project


FIBER OPTICS NETWORK DESIGN
OF TALAVERA,NUEVA ECIJA
Sheet

02
Date

DECEMBER 11,2023
Scale
LEGEND
1. ALL DIMENSION ARE IN MM

10
UNLESS OTHERWISE STATED.
2. CONTRACTORS SHALL OBTAIN
NECESSARY WORK PERMIT PRIOR
TO CONSTRUCTION ACTIVITIES
3. ALL WORKS MUST COMPLY WITH
ALL THE PROVIDED COMMUNICATION
STANDARD

CENTRAL OFFICE FIBER

15.594347, 120.920582

1 9 11 TALAVERA-BALOC SITE
TALAVERA-MUNOZ SITE

2 12 8 15.637057, 120.899031 15.669638, 120.960307

3 13 7
TALAVERA-LLANERA SITE
TALAVERA-RIZAL SITE

15.628641, 120.956890
15.576699, 120.964519

No. Revision/Issue. Date


Firm Name and Address

4 6 TALAVERA-CABANATUAN SITE

15.542681, 120.932523
NOVA CORP. FIBER SERVICES
Brgy. Andal Alino, Talavera, Nueva Ecija

Project Name and Address

PROPOSED MAP OF FIBER LINK


TOWN OF TALAVERA

5 Project

Date

Scale
FIBER OPTICS NETWORK DESIGN
OF TALAVERA,NUEVA ECIJA

DECEMBER 11,2023
Sheet

03
LOCAL DIAGRAM
AND LINK LOSS
BUDGET
1. ALL DIMENSION ARE IN MM
UNLESS OTHERWISE STATED.
2. CONTRACTORS SHALL OBTAIN
NECESSARY WORK PERMIT PRIOR
TO CONSTRUCTION ACTIVITIES
3. ALL WORKS MUST COMPLY WITH
ALL THE PROVIDED COMMUNICATION
STANDARD

LEGEND

CENTRAL OFFICE

1000 GPBS OF SERVICE INTERNET


24 x LC DUPLEX 48 Fibers OS2 Single Mode
FHU 1U 19 Fiber Patch Panel

Cusco ASR 9912


ROUTER

SEE CENTRAL OFFICE DETAIL

ROUTER

PP 1 PP 2 PP 3 PP 4 PP 5

FOTS - CO - 001 FOTS - CO - 002 FOTS - CO - 003 FOTS - CO - 004 FOTS - CO - 005

SEE FIBER SPLICE DETAIL

5.25 KM

4 KM

SEE FIBER SPLICE DETAIL

8.7 KM
6.2 KM 5.4 KM

5.25 KM

SEE FIBER SPLICE DETAIL

FOTS - TO - 001 FOTS - TO - 002 FOTS - TO - 003 FOTS - TO - 004 FOTS - TO - 005
No. Revision/Issue. Date
TALAVERA CABANATUAN LINK TALAVERA - LLANERA LINK Firm Name and Address
SEE TERMINAL OFFICE DETAIL TALAVERA - RIZAL LINK TALAVERA - BALOC LINK TALAVERA - MUNOZ LINK

PPT 1 PPT 2 PPT 3 PPT 4 PPT 5

NOVA CORP. FIBER SERVICES


Brgy. Andal Alino, Talavera, Nueva Ecija

SW 1 SW 2 SW 3 SW 4 SW 5

PPD 1 PPD 2 PPD 3 PPD 4 PPD 5 Project Name and Address

LOGICAL DIAGRAM OF FIBER


LINK TOWN OF TALAVERA

Project Sheet
FIBER OPTICS NETWORK DESIGN
OF TALAVERA,NUEVA ECIJA

01
Date

DECEMBER 11,2023
Scale
1. ALL DIMENSION ARE IN MM
UNLESS OTHERWISE STATED.
2. CONTRACTORS SHALL OBTAIN
NECESSARY WORK PERMIT PRIOR
TO CONSTRUCTION ACTIVITIES
3. ALL WORKS MUST COMPLY WITH
ALL THE PROVIDED COMMUNICATION
STANDARD

LEGEND

CENTRAL OFFICE

1000 GPBS OF SERVICE INTERNET


24 x LC DUPLEX 48 Fibers OS2 Single Mode
FHU 1U 19 Fiber Patch Panel

Cusco ASR 9912


ROUTER

SEE CENTRAL OFFICE DETAIL

ROUTER

PP 1 PP 2 PP 3 PP 4 PP 5

FOTS - CO - 001 FOTS - CO - 002 FOTS - CO - 003 FOTS - CO - 004 FOTS - CO - 005

SEE FIBER SPLICE DETAIL

5.25 KM

4 KM No. Revision/Issue. Date


Firm Name and Address
SEE FIBER SPLICE DETAIL

8.7 KM
6.2 KM 5.4 KM

5.25 KM NOVA CORP. FIBER SERVICES


Brgy. Andal Alino, Talavera, Nueva Ecija

SEE FIBER SPLICE DETAIL

FOTS - TO - 001 FOTS - TO - 002 FOTS - TO - 003 FOTS - TO - 004 FOTS - TO - 005 Project Name and Address

SEE TERMINAL OFFICE DETAIL


TALAVERA CABANATUAN LINK TALAVERA - RIZAL LINK TALAVERA - LLANERA LINK TALAVERA - BALOC LINK TALAVERA - MUNOZ LINK

FIBER LINK LOSS BUDGET


DIAGRAM AND COMPUTATION
PPT 1 PPT 2 PPT 3 PPT 4 PPT 5

SW 1 SW 2 SW 3 SW 4 SW 5

Project Sheet

PPD 4 PPD 5
FIBER OPTICS NETWORK DESIGN
PPD 1 PPD 2 PPD 3
OF TALAVERA,NUEVA ECIJA

02
Date

DECEMBER 11,2023
Scale
PROPOSED
FIBER OPTIC
ROUTES
General Notes

1. ALL DIMENSION ARE IN MM


UNLESS OTHERWISE STATED.
2. CONTRACTORS SHALL OBTAIN
NECESSARY WORK PERMIT PRIOR
TO CONSTRUCTION ACTIVITIES
3. ALL WORKS MUST COMPLY WITH
ALL THE PROVIDED COMMUNICATION
STANDARD

LEGEND

16171819
T2

STA - STATION
STA 00 - CENTRAL OFFICE
STA 1a - BALOC LINK
STA 1b - CABANATUAN LINK
STA 2a - MUÑOZ LINK

1
STA 2b - LLANERA LINK

1415
T1

STA 3a - RIZAL LINK

CENTRAL LINK

23 13 T3
T1
TERMINAL OFFICE/
DISTRIBUTION SITE
Terminal Site Number

4 2324
5 2122 CENTRAL
OFFICE

76 20 3132
8 2930 T4

2728 No. Revision/Issue.


Firm Name and Address
Date

NOVA CORP. FIBER SERVICES


Brgy. Andal Alino, Talavera, Nueva Ecija

Project Name and Address

T5

PROPOSED MAP OF FIBER LINK


TOWN OF TALAVERA

Project Sheet
FIBER OPTICS NETWORK DESIGN
OF TALAVERA,NUEVA ECIJA

01
Date

DECEMBER 11,2023
Scale
General Notes

1. ALL DIMENSION ARE IN MM


UNLESS OTHERWISE STATED.
2. CONTRACTORS SHALL OBTAIN
NECESSARY WORK PERMIT PRIOR
TO CONSTRUCTION ACTIVITIES

1
3. ALL WORKS MUST COMPLY WITH
ALL THE PROVIDED COMMUNICATION
STANDARD

LEGEND
T1 STA - STATION
STA 00 - CENTRAL OFFICE

3-13 STA 1a - BALOC LINK


STA 1b - CABANATUAN LINK
STA 2a - MUÑOZ LINK
STA 2b - LLANERA LINK
STA 3a - RIZAL LINK

2-3 CENTRAL LINK

TERMINAL OFFICE/
T1
DISTRIBUTION SITE
Terminal Site Number

1-2 3-4

3-4
1-2

No. Revision/Issue. Date


Firm Name and Address

NOVA CORP. FIBER SERVICES


Brgy. Andal Alino, Talavera, Nueva Ecija

4-5 Project Name and Address

PROPOSED MAP OF FIBER LINK


TOWN OF TALAVERA

Project Sheet
FIBER OPTICS NETWORK DESIGN
OF TALAVERA,NUEVA ECIJA

02
Date

DECEMBER 11,2023
Scale
General Notes

1. ALL DIMENSION ARE IN MM


UNLESS OTHERWISE STATED.
2. CONTRACTORS SHALL OBTAIN
NECESSARY WORK PERMIT PRIOR
TO CONSTRUCTION ACTIVITIES
3. ALL WORKS MUST COMPLY WITH
ALL THE PROVIDED COMMUNICATION

4-5
STANDARD

7-6
LEGEND
STA - STATION
STA 00 - CENTRAL OFFICE
STA 1a - BALOC LINK
STA 1b - CABANATUAN LINK
STA 2a - MUÑOZ LINK
STA 2b - LLANERA LINK
STA 3a - RIZAL LINK

CENTRAL LINK

TERMINAL OFFICE/
T1
DISTRIBUTION SITE
Terminal Site Number

CENTRAL
OFFICE

5-6 7-8

5-6
7-8

No. Revision/Issue. Date


Firm Name and Address

NOVA CORP. FIBER SERVICES


Brgy. Andal Alino, Talavera, Nueva Ecija

7-6 8-9 Project Name and Address

PROPOSED MAP OF FIBER LINK


TOWN OF TALAVERA

Project Sheet
FIBER OPTICS NETWORK DESIGN
OF TALAVERA,NUEVA ECIJA

03
Date

DECEMBER 11,2023
Scale
General Notes

1. ALL DIMENSION ARE IN MM


UNLESS OTHERWISE STATED.
2. CONTRACTORS SHALL OBTAIN
NECESSARY WORK PERMIT PRIOR
TO CONSTRUCTION ACTIVITIES
3. ALL WORKS MUST COMPLY WITH
ALL THE PROVIDED COMMUNICATION
STANDARD

8-9 LEGEND
10-11
STA - STATION
STA 00 - CENTRAL OFFICE
STA 1a - BALOC LINK
STA 1b - CABANATUAN LINK
STA 2a - MUÑOZ LINK
STA 2b - LLANERA LINK
STA 3a - RIZAL LINK

CENTRAL LINK

TERMINAL OFFICE/
T1
DISTRIBUTION SITE
T5 Terminal Site Number

9-10 11-12

9-10 11-12

No. Revision/Issue. Date


Firm Name and Address

10-11 12 NOVA CORP. FIBER SERVICES


Brgy. Andal Alino, Talavera, Nueva Ecija

Project Name and Address

PROPOSED MAP OF FIBER LINK


TOWN OF TALAVERA

Project Sheet
FIBER OPTICS NETWORK DESIGN
OF TALAVERA,NUEVA ECIJA

04
Date

DECEMBER 11,2023
Scale
General Notes

1. ALL DIMENSION ARE IN MM


UNLESS OTHERWISE STATED.
2. CONTRACTORS SHALL OBTAIN
NECESSARY WORK PERMIT PRIOR
TO CONSTRUCTION ACTIVITIES
3. ALL WORKS MUST COMPLY WITH
ALL THE PROVIDED COMMUNICATION
STANDARD

LEGEND
STA - STATION

14-15 STA 00 - CENTRAL OFFICE


STA 1a - BALOC LINK

16-17 STA 1b - CABANATUAN LINK


STA 2a - MUÑOZ LINK
STA 2b - LLANERA LINK
STA 3a - RIZAL LINK

CENTRAL LINK

TERMINAL OFFICE/
T1
DISTRIBUTION SITE
Terminal Site Number

13-14 15-16

13-14 15-16
3-13

No. Revision/Issue. Date

14-15 Firm Name and Address

NOVA CORP. FIBER SERVICES


Brgy. Andal Alino, Talavera, Nueva Ecija

Project Name and Address

PROPOSED MAP OF FIBER LINK


TOWN OF TALAVERA

Project Sheet
FIBER OPTICS NETWORK DESIGN
OF TALAVERA,NUEVA ECIJA

05
Date

DECEMBER 11,2023
Scale
General Notes

1. ALL DIMENSION ARE IN MM


UNLESS OTHERWISE STATED.
2. CONTRACTORS SHALL OBTAIN
NECESSARY WORK PERMIT PRIOR
TO CONSTRUCTION ACTIVITIES
3. ALL WORKS MUST COMPLY WITH
ALL THE PROVIDED COMMUNICATION
STANDARD

LEGEND
STA - STATION

16-17 STA 00 - CENTRAL OFFICE

19
STA 1a - BALOC LINK
STA 1b - CABANATUAN LINK
STA 2a - MUÑOZ LINK
STA 2b - LLANERA LINK
T2
STA 3a - RIZAL LINK

18-19 CENTRAL LINK

17-18 T1
TERMINAL OFFICE/
DISTRIBUTION SITE
Terminal Site Number

6-20

18-19
17-18
No. Revision/Issue. Date
Firm Name and Address

NOVA CORP. FIBER SERVICES


Brgy. Andal Alino, Talavera, Nueva Ecija

Project Name and Address

PROPOSED MAP OF FIBER LINK


TOWN OF TALAVERA

Project Sheet
FIBER OPTICS NETWORK DESIGN
OF TALAVERA,NUEVA ECIJA

06
Date

DECEMBER 11,2023
Scale
General Notes

1. ALL DIMENSION ARE IN MM


UNLESS OTHERWISE STATED.
2. CONTRACTORS SHALL OBTAIN
NECESSARY WORK PERMIT PRIOR
TO CONSTRUCTION ACTIVITIES
3. ALL WORKS MUST COMPLY WITH
ALL THE PROVIDED COMMUNICATION
STANDARD

LEGEND
STA - STATION
STA 00 - CENTRAL OFFICE
STA 1a - BALOC LINK
STA 1b - CABANATUAN LINK
STA 2a - MUÑOZ LINK
21-22 STA 2b - LLANERA LINK
STA 3a - RIZAL LINK

CENTRAL LINK

TERMINAL OFFICE/
T1
DISTRIBUTION SITE
Terminal Site Number

5-21
22-23 23-24

T3

6-20
24

No. Revision/Issue. Date


Firm Name and Address

23-24 NOVA CORP. FIBER SERVICES


Brgy. Andal Alino, Talavera, Nueva Ecija

Project Name and Address

PROPOSED MAP OF FIBER LINK


TOWN OF TALAVERA

Project Sheet
FIBER OPTICS NETWORK DESIGN
OF TALAVERA,NUEVA ECIJA

07
Date

DECEMBER 11,2023
Scale
General Notes

1. ALL DIMENSION ARE IN MM


UNLESS OTHERWISE STATED.
2. CONTRACTORS SHALL OBTAIN
NECESSARY WORK PERMIT PRIOR
TO CONSTRUCTION ACTIVITIES
3. ALL WORKS MUST COMPLY WITH
ALL THE PROVIDED COMMUNICATION
STANDARD

LEGEND
25-26 STA - STATION
STA 00 - CENTRAL OFFICE
STA 1a - BALOC LINK
STA 1b - CABANATUAN LINK
STA 2a - MUÑOZ LINK
27-28 STA 2b - LLANERA LINK
STA 3a - RIZAL LINK

CENTRAL LINK

TERMINAL OFFICE/
T1
DISTRIBUTION SITE

26-27 Terminal Site Number

10-25

26-27
28-29

27-28
No. Revision/Issue. Date
Firm Name and Address

NOVA CORP. FIBER SERVICES


Brgy. Andal Alino, Talavera, Nueva Ecija

Project Name and Address

PROPOSED MAP OF FIBER LINK


TOWN OF TALAVERA

Project Sheet
FIBER OPTICS NETWORK DESIGN
OF TALAVERA,NUEVA ECIJA

08
Date

DECEMBER 11,2023
Scale
General Notes

1. ALL DIMENSION ARE IN MM


UNLESS OTHERWISE STATED.
2. CONTRACTORS SHALL OBTAIN
NECESSARY WORK PERMIT PRIOR
TO CONSTRUCTION ACTIVITIES
3. ALL WORKS MUST COMPLY WITH
ALL THE PROVIDED COMMUNICATION
STANDARD

LEGEND
31-32 STA - STATION
STA 00 - CENTRAL OFFICE
STA 1a - BALOC LINK
STA 1b - CABANATUAN LINK
STA 2a - MUÑOZ LINK
STA 2b - LLANERA LINK
STA 3a - RIZAL LINK

CENTRAL LINK

29-30
TERMINAL OFFICE/
T1
DISTRIBUTION SITE
Terminal Site Number

28-29
30-31

30-31

No. Revision/Issue. Date


Firm Name and Address

NOVA CORP. FIBER SERVICES


Brgy. Andal Alino, Talavera, Nueva Ecija

T4
29-30 32 Project Name and Address

PROPOSED MAP OF FIBER LINK


TOWN OF TALAVERA

Project Sheet
FIBER OPTICS NETWORK DESIGN
OF TALAVERA,NUEVA ECIJA

09
Date

DECEMBER 11,2023
Scale
OUTSIDE PLANT
AND INSIDE
PLANT DETAILS
1. ALL DIMENSION ARE IN M
UNLESS OTHERWISE STATED.
2. DIMENSIONS ARE STATED IN A
LENGTH BY WIDTH FORMAT
3. ALWAYS MAINTAIN THE PROPER
TEMPERATURE NEEDED BY
THE EQUIPMENTS
ENTRANCE
1.95 x 3.15

LEGENDS

LOUNGE
DOOR

AIR CONDITIONING

BILLING ROOM
UNIT

11.8 X 8.8
AC POWER OUTLET
DROP OFF
6.85 x 3.00

MANAGER'S
ELECTRICAL WIRING

WALKWAY
8.8 X 5.90

5.9 X 4.00
AREA

OFFICE

OFFICE
AREA

CONFERENCE
EQUIPMENT
3.88 X 5.80

BATTERY

9.25 X 5.80

5.8 X 5.8
ROOM
GENERATOR

ROOM
ROOM

RESTROOM
2.34 X 3.85

WOMEN'S
2.90 X 5.80
ROOM

RESTROOM
2.16 X3.85

MEN'S
NOVA CORP. FIBER SERVICES
Brgy. Andal Alino, Talavera, Nueva Ecija

CENTRAL OFFICE
ELECTRICAL WIRING DETAILS

FIBER OPTICS NETWORK DESIGN OF


TALAVERA, NUEVA ECIJA

DECEMBER 11, 2023


01
1. ALL DIMENSION ARE IN M
UNLESS OTHERWISE STATED.
2. DIMENSIONS ARE STATED IN A
LENGTH BY WIDTH FORMAT
3. ALWAYS MAINTAIN THE PROPER
TEMPERATURE NEEDED BY
THE EQUIPMENTS

LEGENDS

DOOR

5.3 5.3 2.6 2.7 4.08 AIR CONDITIONING


UNIT

CONFERENCE/ OFFICE TABLE


DINNING ROOM

BATTERY 4.3 ELECTRICAL WIRING


ROOM LADDER
EQUIPMENT
6.5 ROOM TOILET
OFFICE CABINET

CHAIR

EQUIPMENT RACK
2.2 DUCT
12.5
BATTERY CABINET

OFFICE 14.5
ROOM
6 6
LOBBY

NOVA CORP. FIBER SERVICES

2.9 4.8 Brgy. Andal Alino, Talavera, Nueva Ecija

PARKING
AREA FULL LOT DESIGN AND DETAILS
DISTRIBUTION OFFICE/
TERMINAL OFFICE

FIBER OPTICS NETWORK DESIGN OF


TALAVERA, NUEVA ECIJA

DECEMBER 11, 2023


02
1. ALL DIMENSION ARE IN M
UNLESS OTHERWISE STATED.
2. DIMENSIONS ARE STATED IN A
LENGTH BY WIDTH FORMAT
3. ALWAYS MAINTAIN THE PROPER
TEMPERATURE NEEDED BY
THE EQUIPMENTS

LEGENDS

NOVA CORP. FIBER SERVICES


Brgy. Andal Alino, Talavera, Nueva Ecija

3D DIAGRAM OF THE CENTRAL


OFFICE

FIBER OPTICS NETWORK DESIGN OF


TALAVERA, NUEVA ECIJA

DECEMBER 11, 2023


03
1. RACK HEIGHT: 2133.60 mm
WIDTH: 381 mm
RACK - 4 RACK - 3 RACK - 2 VCM RACK - 1 DEPTH: 515.87 mm
2. MANUFACTURED BY:
PANDUIT CORP
PART NO. 298-12414-ND
MANUFACTURER PART NO. R2P
3. JUNIPER MX 480 ROUTER
UNITS: 8U
4. PATCH PANEL AND SWITCH
UNITS: 8U
5. UPS
UNITS: 2U
6. THE EQUIPMENT SPECIFICATIONS
ARE PROVIDED IN THE FOLDER

LEGEND
PP PATCH PANEL
PP
S SWITCH

S R ROUTER

CMCABLE MANAGEMENT

E001
E002
E003
E004 E001
E002
E003
E004 E001
E002
E003
E004
01 02 03 04 05 06 07 08 09 10 11 12

E001 E002 E003 E004

HCM HCM
UPSUNINTERUPTED
POWER SOURCE

HCM HORIZONTAL CABLE


MANAGEMENT
VCM VERTICAL CABLE
MANAGEMENT

SPARE UNITS RACK

MASTER
ONLINE ACO/LT
NETWROKS OFFLINE FAN PEM0 1 2 3
RE0 RE1 NC C NO NC C NO

OK FAIL OK FAIL OK FAIL OK FAIL OK FAIL OK FAIL OK FAIL OK FAIL RUNNING

JUNOS
0 1 0 1 2 3 4 5

LINK

LINK

LINK

LINK
PCWT V1 LINK
PCWT V0 LINK

E/1

E/2
E/0

E/3
5
MPC5E-100G10G

LINK

LINK

LINK
LINK
PCWT V0 LINK

PCWT V1 LINK

E/0

E/1

E/2

E/3
4
MPC5E-100G10G

LINK

LINK

LINK
LINK
PCWT V0 LINK

PCWT V1 LINK

E/1

E/2
E/0

E/3
3

2
MPC5E-100G10G

CM

LINK

LINK

LINK

LINK
PCWT V0 LINK

PCWT V1 LINK

E/1

E/2
E/0

E/3
1
MPC5E-100G10G

NOVA CORP. FIBER SERVICES


0
Brgy. Andal Alino Talavera, Nueva Ecija

ONLINE UPS
XX.X UPS RACK DETAIL (RD)

XX.X
ONLINE UPS

FIBER OPTICS NETWORK DESIGN OF


TALAVERA

DECEMBER 11, 2023


04
143
LEGEND
SM SINGLE MODE

RK - 1 RK - 2 RK - 3 RK - 4 RK RACK
RK - 1 24x LC Duplex, 48 Fibers OS2 Single Mode FHU 24x LC Duplex, 48 Fibers OS2 Single Mode FHU 24x LC Duplex, 48 Fibers OS2 Single Mode FHU 24x LC Duplex, 48 Fibers OS2 Single Mode FHU
JUNIPER MX - 480 1U 19'' Fiber Patch Panel 1U 19'' Fiber Patch Panel 1U 19'' Fiber Patch Panel 1U 19'' Fiber Patch Panel LUCENT CONNECTOR

CR FIBER OPTIC CABLE JUMPER


NUMBER

TX TRANSMITTER

RXRECIEVER

FOC 13 - 24
FOC 1 - 12

FOC 13 - 24
FOC 1 - 12

FOC 13 - 24
MPC5EQ - 100G10G CFP2

MPC5EQ - 100G10G CFP2

MPC5EQ - 100G10G CFP2

MPC5EQ - 100G10G CFP2


LC LUCENT CONNECTOR

FOC 1 - 12

FOC 13 - 24
FOC 1 - 12
GB GIGA BYTES
2x100GE + 4x10GE

2x100GE + 4x10GE

2x100GE + 4x10GE

2x100GE + 4x10GE
CFP2

CFP2

CFP2

CFP2

SM-LC-5M TX,A01
S5/0/1 CR-001
RX,A02

TX,A01
S4/0/1 SM-LC-5M CR-002
RX,A02

TX,A01
S3/0/1 SM-LC-5M CR-003
RX,A02

TX,A01
S2/0/1 SM-LC-5M CR-004
RX,A02

NOVA CORP. FIBER SERVICES


Brgy. La torre Talavera, Nueva Ecija

PATCHING DETAIL (PTD)

FIBER OPTICS NETWORK DESIGN OF


TALAVERA

DECEMBER 11, 2023


05
TO/FROM T1/CAB
1. ISA CARD TO BE PROVIDED AND
INSTALLED BY CONTRACTOR TO
UPGRADE EXISTING SDH EQUIPMENT
TO PROVIDE GIGA BIT ETHERNET
INTERFACE.
TO END.

LEGEND
PROPOSED FIBER OPTIC CABLE

EXISTING FIBER OPTIC CABLE


RK - 1
EXISTING COPPER CABLE
1-48
SM SINGLE MODE

RK RACK

1-2
LC LUCENT CONNECTOR

RXRECIEVER

TX,A01

RX,A02
TX TRANSMITTER

T TERMINAL

SM-LC-5M
BA Baloc link

MZ Munoz link

C 2PF -C 0 10G- L LL Llanera Link

2PF 01 G C
Q 5C MPE-1G
00 MZ Munoz link

CAB Cabanatuan link

MPC5EQ - 100G10G CFP2


MPC5EQ - 100G10G CFP2
100G - LC - CFP2

100G - LC - CFP2
1-2 TX,A01 SM-LC-5M SM-LC-5M TX,A01 1-2

RK - 3
RK - 2

1-48

TO/FROM T2/MZ TO/FROM T3/LL

1-48
JUNIPER MX - 480
RX,A02 RX,A02

MPC5EQ - 100G10G CFP2

100G - LC - CFP2 ETH - SFP


SM-LC-5M
TX,A01

RX,A02

1 COMP-1 COMP-1
2 COMP-2 COMP-2
3 COMP-3 COMP-3
4 COMP-4 COMP-4

NOVA CORP. FIBER SERVICES


1-2

Brgy. Andal alino Talavera, Nueva Ecija

1-48

RK - 4

CONNECTIVITY DETAIL
(CD)
TO/FROM T1/BA

FIBER OPTICS NETWORK DESIGN OF


Talavera

December 11, 2023


06
143
1. ALL DIMENSION ARE IN MM
UNLESS OTHERWISE STATED.
2. LOSES SUCH AS SPLICE LOSS
AND CONNECTOR LOSS SHOULD
BE COMPUTED AND OBSERVED
FOR THE EFFICIENCY OF THE LINK
TO BE MADE

FIBER SPLICING

SPLICE SECTION

SPLICING FLAP PLATE

ADAPTOR

123456789
FIBER REINFORCE FIXER SEALING AREA

123456789
CABLE INLET/OUTLET

NOVA CORP. FIBER SERVICES


Brgy. Andal Alino, Talavera Nueva Ecija

Base

CLOSE NUT FIBER SPLICING DETAIL (FSD)

FIBER ENCLOSURE CEALING GROOVE AND REPEATABLE OPEN

FIBER OPTICS NETWORK DESIGN OF


Talavera

December 11, 2023


07
1. ALL DIMENSION ARE IN MM
UNLESS OTHERWISE STATED.
2. CONCRETE SHALL BE A MINIMUM
OF 3000 PSI STRENGTH, AT 28 DAYS
TYPE V CEMENT SHOULD BE USED
3. CONCRETE ENCASED CONDUIT
MUST REMAIN LEVEN FROM END
TO END.
4. TERRA MARKER TAPE SHOULD BE
CABLE LADDER PLACED NOT GREATER THAN 300M
FROM GRADE LEVEL AND NOT LESS
THAN 300M FROM FIBER OPTIC CABLE
AND ON TOP OF THE CONCRETE
5. THE TRENCH BOTTOM SHALL BE
LEVELLED AND COMPACTED PRIOR
IN PLACING CONDUIT/CONCRETE.
6. PLACE PULL ROPE 1/4" MINIMUM
POLYPYLENE, IN ALL VACANT DUCTS
FIBER SPLICE AND SUBDUCTS MUST BE SEALED IN
CLOSURE BOTH ENDS.
7. TRENCHES OR EXCAVATION THAT
ARE 1.2 METER OR MORE IN DEPTH
SEE FSD #8
SHALL BE SAFEGUARD BY SHORING OR
SLOPING THE TRENCH WALL.

LEGEND
DETECTABLE MARKERTAPE
MIN MINIMUM

4-4"θ PVC CONDUIT


CONCRETE ENCASE

4-4"θ PVC ELBOW


R= 0.914m
L= 1.44m
A= 90 degrees bend

4-4"θ PVC COUPLING


NOVA CORP. FIBER SERVICES
Brgy. Andal ALino Talavera, Nueva Ecija

TRENCHING DETAIL (TCD)

FIBER OPTICS NETWORK DESIGN OF


Talavera
SEE TCD #8

December 11, 2023


08
143
1. ALL DIMENSION ARE IN MM
UNLESS OTHERWISE STATED.
2. CONCRETE SHALL BE A MINIMUM
OF 3000 PSI STRENGTH, AT 28 DAYS
TYPE V CEMENT SHOULD BE USED
3. CONCRETE ENCASED CONDUIT
MUST REMAIN LEVEN FROM END
TO END.
4. TERRA MARKER TAPE SHOULD BE
PLACED NOT GREATER THAN 300M
FROM GRADE LEVEL AND NOT LESS
460 THAN 300M FROM FIBER OPTIC CABLE
300
MIN AND ON TOP OF THE CONCRETE
5. THE TRENCH BOTTOM SHALL BE
LEVELLED AND COMPACTED PRIOR
IN PLACING CONDUIT/CONCRETE.
6. PLACE PULL ROPE 1/4" MINIMUM
POLYPYLENE, IN ALL VACANT DUCTS
AND SUBDUCTS MUST BE SEALED IN
BOTH ENDS.
5. TRENCHES OR EXCAVATION THAT
ARE 1.2 METER OR MORE IN DEPTH
SHALL BE SAFEGUARD BY SHORING OR
SLOPING THE TRENCH WALL.

1200
LEGEND
DETECTABLE MARKERTAPE
MIN MINIMUM

4-4"θ PVC
FIBER OPTIC CABLE
TERMINAL LINK 1

FOC 001

75
FOC 002

FIBER OPTIC CABLE


TERMINAL LINK 2

FIBER OPTIC CABLE


TERMINAL LINK 3 FIBER OPTIC CABLE
TERMINAL LINK 4
1 2 112

FOC 003 FOC 004


449

75

3 4
0.7500 NOVA CORP. FIBER SERVICES
Brgy. Andal Alino Talavera, Nueva Ecija

TRENCH BOTTOM CONCRETE ENCASEMENT SUBDUCT DETAIL (SDD)

FIBER OPTICS NETWORK DESIGN OF


TALAVERA

DECEMBER 11, 2023


09
143
1. ISA CARD TO BE PROVIDED AND
INSTALLED BY CONTRACTOR TO
UPGRADE EXISTING SDH EQUIPMENT
TO PROVIDE GIGA BIT ETHERNET
INTERFACE.
TO END.

LEGEND
PROPOSED FIBER OPTIC CABLE

EXISTING FIBER OPTIC CABLE

EXISTING COPPER CABLE


30"

460
MIN

FOSC 400

FOC (18M)

NOVA CORP. FIBER SERVICES


Brgy. Andal alino Talavera, Nueva Ecija

OPTIPED DETAIL (FSOD)

TRENCH BOTTOM CONCRETE ENCASEMENT


FIBER OPTICS NETWORK DESIGN OF
TALAVERA

DECEMBER 11, 2023


10
1. ALL DIMENSION ARE IN M
UNLESS OTHERWISE STATED.
2. DIMENSIONS ARE STATED IN A
LENGTH BY WIDTH FORMAT
3. ALWAYS MAINTAIN THE PROPER
TEMPERATURE NEEDED BY

EQUIPMENT ROOM
THE EQUIPMENTS

LEGENDS

DOOR

AIR CONDITIONING
UNIT
BATTERY ROOM

OFFICE TABLE

ELECTRICAL
WIRING

EQUIPMENT RACKS

OFFICE CABINET

NOVA CORP. FIBER SERVICES


Brgy. Andal Alino, Talavera, Nueva Ecija

EQUIPMENT ROOM DETAILS (ER)


CENTRAL OFFICE

FIBER OPTICS NETWORK DESIGN OF


TALAVERA, NUEVA ECIJA

DECEMBER 07, 2023