Villa Sistemi Medicali ARCOVIS 2000 R - Installation - 8
SUMMARY
UNPACKING 2
GROUPS ASSEMBLY: IMAGE INTENSIFIER TUBE AND COLLIMATOR ................................................. 4
INTENSIFIER GROUP ASSEMBLY ............................................................................................................. 5
MONOBLOC GROUP ASSEMBLY............................................................................................................. 10
SETUP 14
POWER SUPPLY ....................................................................................................................................... 14
115V power supply ................................................................................................................................ 14
230V power supply ................................................................................................................................ 14
TUBE SETTING IN ..................................................................................................................................... 15
UNPACKING
To unpack the unit, please refer to picture 1 (page 4), the letters indicate the parts of the packing that have to
been disposed of, as they are not component parts of the system, but assure a safe transportation from the
factory to the destination site; the numbers indicate the component parts of the system.
Picture 1
Assembly the little case, and fix it by the four lever washers
and screws as shown in the picture.
SETUP
POWER SUPPLY
Before inserting the supply plug into the mains, perform the following checks:
• verify that the plug is supplied with the earth connection:
• verify that the mains voltage corresponds to the one of the unit.
IF ALL THESE CONDITIONS ARE NOT VERIFIED AND NOT CERTAIN, DO NOT CONNECT THE
SUPPLY PLUG TO THE MAINS.
During the purchase order procedure, it is already specified whether the unit has to operate either at 230V or
115V, therefore, no modification is required during the installation phase. For any further verification, please
refer to the electrical drawings and to the set up tables.
ATTENTION: For any check, the intervention of qualified and authorized personnel is
required.
TUBE SETTING IN
It’s necessary to proceed with the X-RAY TUBE SETTING IN before using the unit for the very first time and
after any long period of non-use (3 months or more).
ATTENTION:
If during this procedure, any discrepancies or anomalies are detected, it’s necessary
to interrupt it for at least half an hour and start again from the beginning.