*EMPTY JERRICAN DRUM*

Struktur PEB 39280.2 Kg


Gording & Purlin 12757.34 Kg
Dinding & Kanopi 19385.24 Kg
Sling Ikatan Angin 362.97 Kg
Baut 1561.17 Kg
Koneksi 7142.7 Kg
Metal Sheet 3024.0 M2
Block Wall 756 M2
NOK ATAP 72 M
TALANG AIR 144 M
SYPHON 14 PCS
DOWN SPOT PIPE 112 M
DRAINASE PRECAST 400X400 CLOSURE 184 M

*FINISH GOODS*
Struktur PEB 114706.04 Kg
Gording & Purlin 25193.61 Kg
Dinding & Kanopi 14094.27 Kg
Sling Ikatan Angin 1071.52 Kg
Baut 4196 Kg
Koneksi 15340 Kg
Metal Sheet 7395.41 M2
Block Wall 1408 M2
NOK ATAP 72 M
TALANG AIR 144 M
SYPHON 14 PCS
DOWN SPOT PIPE 112 M
DRAINASE PRECAST 400X400 CLOSURE 260 M

EARTH WORK & FOUNDATION UNDER DISCUSSION


1. Excavation & Fill Volume...?
2. Equipment layout & position...?
3. Dranage & pit flow and position...?
4. NSPT soil test...?
5. Soil Fill material from client or not?