The document contains a schedule for completing a final major project (FMP) with various pre-production, production, and post-production tasks. It lists tasks such as writing a proposal, conducting research, filming scenes, editing footage, and completing documentation between April 2024 and May 2024, with many tasks to be finished before specific deadlines. It also notes whether tasks need to be rescheduled.
The document contains a schedule for completing a final major project (FMP) with various pre-production, production, and post-production tasks. It lists tasks such as writing a proposal, conducting research, filming scenes, editing footage, and completing documentation between April 2024 and May 2024, with many tasks to be finished before specific deadlines. It also notes whether tasks need to be rescheduled.
The document contains a schedule for completing a final major project (FMP) with various pre-production, production, and post-production tasks. It lists tasks such as writing a proposal, conducting research, filming scenes, editing footage, and completing documentation between April 2024 and May 2024, with many tasks to be finished before specific deadlines. It also notes whether tasks need to be rescheduled.
PRE / PROD / POST TASK TO BE COMPLETED BY? TO BE RESCHDULED?
Write up and submit 04/03/24 – 11/03/24
Pre FMP proposal
Start writing about
Pre different secondary 11/03/24 - 18/03/24 research topics
Create a Primary Pre research and sent it out 11/03/24 - 18/03/24 to people.
Draw story boards for my
Pre 18/03/24 - 25/03/24 FMP.
Pre Write scripts 18/03/24 - 25/03/24
Look for locations and
Pre then write a location 25/03/24 - 31/03/24 recce
Over the easter start
All scenes filmed by Prod filming some of the 22/04/24 scenes
Start editing the footage
Post and adding special 22/04/24 – 6/05/24 effects
Tidy up any documents,
Post research or anything I 6/05/24 – 17/05/24 missed Complete practical element/ plan survey and Post feedback/ designing and 20/05/24 – 27/05/24 submission of exhibition posters