Hannah Wayne Production Schedule – FMP 2022

Week of Task Completed?


24/01/22 Context
Create Mind maps
Conduct three potential ideas for short film
Weekly blogs
Production Schedule, Bibliography, Proposal, Rationale
31/01/22 Topic and Target Audience: Friendship, Adventure etc
Research
Weekly blogs

07/02/22 Codes and Conventions of Coming of Age Films


(research and test shoots)
Weekly blogs

14/02/22 Narrative and Character research.


Weekly blogs

HALF TERM
Make sure ALL work is up to date
28/02/22 Mise-en-scene / props (deadline lesson10)
Location research and location tests / recces
Weekly blogs
Start script and storyboard
Thursday 3rd and 4th March: London
07/03/22 Finish Script
Storyboard and opening and end credits (deadline lesson 11)
Weekly blogs

14/03/22 Pitch prep / pitch / complete plan


Start Pitches – Selected Groups
Weekly blog

21/03/22 PITCHES –
PLANNING: Production schedules / organising filming / auditions
(whilst not in pitches)
Weekly blogs

28/03/22 Complete storyboards and upload to weebly


Wednesday- Uni open day
Send out all permission slips.
Location scouting with Aimee at RGS
Film test shoots with mum

04/04/22 Monday: Film with Izzy


Tuesday: Film with Kate and Mum
Wednesday: Film with Mum and I
Review footage and upload to memory stick.
EASTER HOLIDAYS
11/04/22 Monday: filming with Liddie, park scenes
Tuesday: Create social media and overlays and film
Wednesday: Re shoots
Rest of the week away

Back on Wednesday
18/04/22 Edit Thurs, Fri, Sat and Sun
Friday: Filming with Liddie again

25/04/22 Edit every day


Get first draft uploaded.
Re shoots if needed

02/05/22 Edit and review


FINAL EDIT submitted 6th MAY 2022

09/05/22 Monday- watch peer productions + focus groups for feedback.


Evaluation!
Send out survey monkey for more peer feedback.

16/05/22 Final evaluation completed by Wednesday 18th May