ID Task Task Name Duration Start Finish July 2022 August 2022 September 2022

Mode 11 16 21 26 31 5 10 15 20 25 30 4 9 14 19 24
1 Research method and project management 37.38 days
Mon 25/07/22 Wed 14/09/22
2 Project presentation semester 1 1.88 daysMon 25/07/22 Tue 26/07/22
3 Team meeting 1 hr Mon 25/07/22Mon 25/07/22
4 Assigning team roles and setting up powerpoint
4 hrs Mon 25/07/22Mon 25/07/22
5 Rehersal 2 hrs Mon 25/07/22Mon 25/07/22
6 Presentation day 1 day Mon 25/07/22Tue 26/07/22
7 Milestone 0 days Tue 26/07/22Tue 26/07/22 26/07
8 Semester 2 35.5 daysTue 26/07/22Wed 14/09/22
9 1.1 Project management 3 days Tue 26/07/22Fri 29/07/22
10 1.1.1 Meetings 24 hrs Tue 26/07/22Fri 29/07/22
11 1.1.2 Project planning 1 day Tue 26/07/22Wed 27/07/22
12 1.1.3 Roles assigning 1 hr Tue 26/07/22Tue 26/07/22
13 1.3 Support equipment 8 days Fri 29/07/22 Wed 10/08/22
14 1.3.1 Laboratory in uni 8 days Fri 29/07/22 Wed 10/08/22
15 Asking for approval 1 wk Fri 29/07/22 Fri 5/08/22
16 Setting up schedule 2 days Fri 5/08/22 Tue 9/08/22
17 Testing equipment 1 day Tue 9/08/22 Wed 10/08/22
18 1.3.2 Rowater Australia 7 days Fri 29/07/22 Tue 9/08/22
19 Deciding which euqipemtn to borrow 4 days Fri 29/07/22 Thu 4/08/22
20 Cost analysis 7 days Fri 29/07/22 Tue 9/08/22
21 1.4 Data required 20.13 days
Wed 10/08/22 Wed 7/09/22
22 1.4.1 HTC mechanism 5 days Wed 10/08/22 Wed 17/08/22
23 Borrowing the reactor 4 days Wed 10/08/22Tue 16/08/22
24 Experiment procedures 1 day Tue 16/08/22Wed 17/08/22
25 1.4.2 Effect of biomass retention time 5 days Wed 10/08/22 Wed 17/08/22
26 Planning what type of biomass to test 2 days Wed 10/08/22Fri 12/08/22
27 Experiment procedure 3 days Fri 12/08/22 Wed 17/08/22

Project: ver 4 Semester 2 projec Task Milestone Project Summary Progress


Date: Fri 3/06/22 Split Summary Deadline

Page 1
ID Task Task Name Duration Start Finish July 2022 August 2022 September 2022
Mode 11 16 21 26 31 5 10 15 20 25 30 4 9 14 19 24
28 1.4.3 Compositions of biomass 3 days Wed 10/08/22 Mon 15/08/22
29 Planning +collecting biomass samples 2 days Wed 10/08/22Fri 12/08/22
30 Experiment procedures 1 day Fri 12/08/22 Mon 15/08/22
31 1.4.4 Stability/affinity of active sites 17.13 days
Wed 10/08/22 Fri 2/09/22
32 Planning + collecting samples 8 days Wed 10/08/22Fri 2/09/22
33 Experiment procedures 1 day Wed 10/08/22Thu 11/08/22
34 1.4.5 Active radical modification 3 days Mon 5/09/22Wed 7/09/22
35 Planning+collecting samples 3 days Mon 5/09/22Wed 7/09/22
36 Eperiment procedures 1 day Mon 5/09/22Mon 5/09/22
37 1.4.6 Test/Evaluation 0 days Wed 7/09/22Wed 7/09/22 7/09
38 Mile stone 0 days Wed 7/09/22Wed 7/09/22 7/09
39 1.5 Report 29.5 daysTue 26/07/22Tue 6/09/22
40 1.5.1 Draft report 11 days Tue 26/07/22Wed 10/08/22
41 Gathering info + results 1 wk Tue 26/07/22Tue 2/08/22
42 Identifying and assigning tasks 1 day Tue 2/08/22 Wed 3/08/22
43 Writing 4 days Wed 3/08/22Tue 9/08/22
44 Checking + submitting 1 day Tue 9/08/22 Wed 10/08/22
45 Mile stone 0 days Wed 10/08/22Wed 10/08/22 10/08
46 1.5.2 Final report 18.5 daysWed 10/08/22 Tue 6/09/22
47 Reflecting and evaluating feedbacks 12 hrs Wed 10/08/22Fri 12/08/22
48 Reporting progress wk 1 6 days Fri 12/08/22 Mon 22/08/22
49 Reporting progress wk2 6 days Mon 22/08/22Tue 30/08/22
50 Final draft checking + submitting 5 days Tue 30/08/22Tue 6/09/22
51 Mile stone 0 days Tue 6/09/22 Tue 6/09/22 6/09
52 1.6 Ingenuity expo presentation 6 days Tue 6/09/22 Wed 14/09/22
53 Assigning tasks and powerpoint set up 4 days Tue 6/09/22 Mon 12/09/22
54 Rehersal 1 day Mon 12/09/22Tue 13/09/22

Project: ver 4 Semester 2 projec Task Milestone Project Summary Progress


Date: Fri 3/06/22 Split Summary Deadline

Page 2
ID Task Task Name Duration Start Finish July 2022 August 2022 September 2022
Mode 11 16 21 26 31 5 10 15 20 25 30 4 9 14 19 24
55 Presentation day 1 day Tue 13/09/22Wed 14/09/22
56 Mile stone 0 days Wed 14/09/22Wed 14/09/22 14/09