The document outlines an 11-task, 19-day project to construct and install a skid machine base. The first task is mobilization, followed by demolition of existing structures. Excavation, concrete works, and installation of drain pipes will then take place. A sump will be constructed before reinstating the area and tiling. The final tasks are installation of the machine and demobilization.
The document outlines an 11-task, 19-day project to construct and install a skid machine base. The first task is mobilization, followed by demolition of existing structures. Excavation, concrete works, and installation of drain pipes will then take place. A sump will be constructed before reinstating the area and tiling. The final tasks are installation of the machine and demobilization.
The document outlines an 11-task, 19-day project to construct and install a skid machine base. The first task is mobilization, followed by demolition of existing structures. Excavation, concrete works, and installation of drain pipes will then take place. A sump will be constructed before reinstating the area and tiling. The final tasks are installation of the machine and demobilization.