ID Task Name Duration Start Finish Apr '22 May '22 Jun '22 Jul '22 Aug '22

Duration Start Finish Apr '22 May '22 Jun '22 Jul '22 Aug '22 Sep '22 Oct '22
10 17 24 1 8 15 22 29 5 12 19 26 3 10 17 24 31 7 14 21 28 4 11 18 25 2
1 CONSTRUCTION SCHEDULE 77 days Thu 5/5/22 Fri 8/19/22 CONSTRUCTION SCHEDULE
77 days
2 JOB SITES 3 days Thu 5/5/22 Mon 5/9/22 JOB SITES
3 days
3 Site Preparetion 3 days Thu 5/5/22 Mon 5/9/22
3 days Site Preparetion
4 MANSONRY 6 days Tue 5/10/22 Tue 5/17/22 MANSONRY
6 days
5 Wall 6 days Tue 5/10/22 Tue 5/17/22
6 days Generators Imported from Thailand
6 ELECTRICAL AND MACHENICAL WORK 10 days Mon 5/16/22 Fri 5/27/22 ELECTRICAL AND MACHENICAL WORK
10 days
7 MEP 10 days Mon 5/16/22 Fri 5/27/22
10 days MEP
8 FINISHING WORKS 31 days Sat 5/28/22 Fri 7/8/22
31 days
9 FLOOR FINISHING 8 days Sat 5/28/22 Tue 6/7/22
8 days
10 Floor (Base) 4 days Sat 5/28/22 Wed 6/1/22
Floor (Base)
11 Apply Ceramic Floor Tile 3 days Thu 6/2/22 Mon 6/6/22
3 days Apply Ceramic Floor Tile
12 Apply Wooden Floor Tile 1 day Tue 6/7/22 Tue 6/7/22
1 day Apply Wooden Floor Tile
13 WALL FINISHING 19 days Wed 6/8/22 Mon 7/4/22 WALL FINISHING
19 days
14 Wall (Base) 6 days Wed 6/8/22 Wed 6/15/22
6 days Wall (Base)
15 Manorbum Double paint from Dulux for the room internally 5 days Thu 6/16/22 Wed 6/22/22
5 days Manorbum Double paint from Dulux for the room internally
16 Lyttetto Paint from Dulux for the Exterior of Balcony 2 days Thu 6/23/22 Fri 6/24/22
2 days Lyttetto Paint from Dulux for the Exterior of Balcony
17 Wood Panel Imported from China 3 days Sat 6/25/22 Tue 6/28/22
Wood Panel Imported from China
18 Matte Porcelain Mosaic Tile for Bathroom from China 3 days Wed 6/29/22 Fri 7/1/22
3 days Matte Porcelain Mosaic Tile for Bathroom from China
19 CEILING FINISHING 3 days Tue 7/5/22 Thu 7/7/22 CEILING FINISHING
3 days
20 Gypsum Ceiling With Black Color 3 days Tue 7/5/22 Thu 7/7/22
3 days Gypsum Ceiling With Black Color
21 INSTALLATION WORKS 14 days Fri 7/8/22 Wed 7/27/22 INSTALLATION WORKS
14 days
22 Chandelier (ELK lighting, Elk1907588, 43W, China) 1 day Fri 7/8/22 Fri 7/8/22
1 day Chandelier (ELK lighting, Elk1907588, 43W, China)

Task Project Summary Manual Task Start-only Deadline

Project: Project1 Split Inactive Task Duration-only Finish-only Progress


Date: Tue 4/12/22 Milestone Inactive Milestone Manual Summary Rollup External Tasks Manual Progress

Summary Inactive Summary Manual Summary External Milestone

Page 1
ID Task Name Duration Start Finish Apr '22 May '22 Jun '22 Jul '22 Aug '22 Sep '22 Oct '22
10 17 24 1 8 15 22 29 5 12 19 26 3 10 17 24 31 7 14 21 28 4 11 18 25 2
23 Recessed Slim Downlight-Die Casting Aluminum (24W, 220-240V) 3 days Sat 7/9/22 Tue 7/12/22
Recessed Slim Downlight-Die Casting Aluminum (24W, 2
24 Air Conditioner (1.5HP, LG, #S3-Q12JA3WA) 1 day Wed 7/13/22 Wed 7/13/22
1 day Air Conditioner (1.5HP, LG, #S3-Q12JA3WA)
25 Generators Imported from Thailand 1 day Thu 7/14/22 Thu 7/14/22
1 day Generators Imported from Thailand
26 Double Door H2.3 x L2.1m 1 day Fri 7/15/22 Fri 7/15/22
1 day Double Door H2.3 x L2.1m
27 Door H2.1 x L0.70m 1 day Sat 7/16/22 Sat 7/16/22
Door H2.1 x L0.70m
28 Slide Glass Door H2.3 x L2.0m 1 day Mon 7/18/22 Mon 7/18/22
1 day Slide Glass Door H2.3 x L2.0m
29 Glass Door H2.1 x L0.80m 1 day Tue 7/19/22 Tue 7/19/22
1 day Glass Door H2.1 x L0.80m
30 Project Window H2.1 x L2.4m 1 day Wed 7/20/22 Wed 7/20/22
1 day Project Window H2.1 x L2.4m
31 Project Window H2.5 x L0.60m 1 day Thu 7/21/22 Thu 7/21/22
1 day Project Window H2.5 x L0.60m
32 Fixed Window H2.1 x L1.6m 1 day Fri 7/22/22 Fri 7/22/22
1 day Fixed Window H2.1 x L1.6m
33 Fixed Window H2.6 x L2.8m 1 day Sat 7/23/22 Sat 7/23/22
Fixed Window H2.6 x L2.8m
34 FURNITURE AND EQUIPMENT INSTALLATION TASKS 13 days Thu 7/28/22 Mon 8/15/22 FURNITURE AND EQUIPMENT INSTALLATION TASKS
13 days
35 Beds for bedroom 1 day Thu 7/28/22 Thu 7/28/22
1 day Beds for bedroom
36 Wardrobe (#YJYG02) 1 day Fri 7/29/22 Fri 7/29/22
1 day Wardrobe (#YJYG02)
37 Table (#YLT-1501-01P) 1 day Sat 7/30/22 Sat 7/30/22
Table (#YLT-1501-01P)
38 Chair (#NSW540) 1 day Mon 8/1/22 Mon 8/1/22
1 day Chair (#NSW540)
39 TV Stand (#DSG-3) 1 day Tue 8/2/22 Tue 8/2/22
1 day TV Stand (#DSG-3)
40 Coffee Table (#Hlroundsidetable) 1 day Wed 8/3/22 Wed 8/3/22
1 day Coffee Table (#Hlroundsidetable)
41 Leisure Chair (#BP4015) 1 day Thu 8/4/22 Thu 8/4/22
1 day Leisure Chair (#BP4015)
42 Table (#LV016) 1 day Fri 8/5/22 Fri 8/5/22
1 day Table (#LV016)
43 Office Chair (@X#-59B-MF) 1 day Sat 8/6/22 Sat 8/6/22
Office Chair (@X#-59B-MF)
44 Curtain (#B08MQJSDN) 1 day Mon 8/8/22 Mon 8/8/22
1 day Curtain (#B08MQJSDN)

Task Project Summary Manual Task Start-only Deadline

Project: Project1 Split Inactive Task Duration-only Finish-only Progress


Date: Tue 4/12/22 Milestone Inactive Milestone Manual Summary Rollup External Tasks Manual Progress

Summary Inactive Summary Manual Summary External Milestone

Page 2
ID Task Name Duration Start Finish Apr '22 May '22 Jun '22 Jul '22 Aug '22 Sep '22 Oct '22
10 17 24 1 8 15 22 29 5 12 19 26 3 10 17 24 31 7 14 21 28 4 11 18 25 2
45 Tv (Toshibar, 55-inch, #55C350KIJ) 1 day Tue 8/9/22 Tue 8/9/22
1 day Tv (Toshibar, 55-inch, #55C350KIJ)
46 Bookshelf (Customized) 1 day Wed 8/10/22 Wed 8/10/22
1 day Bookshelf (Customized)
47 Desk (#S-1650) 1 day Thu 8/11/22 Thu 8/11/22
1 day Desk (#S-1650)

Task Project Summary Manual Task Start-only Deadline

Project: Project1 Split Inactive Task Duration-only Finish-only Progress


Date: Tue 4/12/22 Milestone Inactive Milestone Manual Summary Rollup External Tasks Manual Progress

Summary Inactive Summary Manual Summary External Milestone