Duration Start Finish Apr '22 May '22 Jun '22 Jul '22 Aug '22 Sep '22 Oct '22
10 17 24 1 8 15 22 29 5 12 19 26 3 10 17 24 31 7 14 21 28 4 11 18 25 2
1 CONSTRUCTION SCHEDULE 77 days Thu 5/5/22 Fri 8/19/22 CONSTRUCTION SCHEDULE
77 days
2 JOB SITES 3 days Thu 5/5/22 Mon 5/9/22 JOB SITES
3 days
3 Site Preparetion 3 days Thu 5/5/22 Mon 5/9/22
3 days Site Preparetion
4 MANSONRY 6 days Tue 5/10/22 Tue 5/17/22 MANSONRY
6 days
5 Wall 6 days Tue 5/10/22 Tue 5/17/22
6 days Generators Imported from Thailand
6 ELECTRICAL AND MACHENICAL WORK 10 days Mon 5/16/22 Fri 5/27/22 ELECTRICAL AND MACHENICAL WORK
10 days
7 MEP 10 days Mon 5/16/22 Fri 5/27/22
10 days MEP
8 FINISHING WORKS 31 days Sat 5/28/22 Fri 7/8/22
31 days
9 FLOOR FINISHING 8 days Sat 5/28/22 Tue 6/7/22
8 days
10 Floor (Base) 4 days Sat 5/28/22 Wed 6/1/22
Floor (Base)
11 Apply Ceramic Floor Tile 3 days Thu 6/2/22 Mon 6/6/22
3 days Apply Ceramic Floor Tile
12 Apply Wooden Floor Tile 1 day Tue 6/7/22 Tue 6/7/22
1 day Apply Wooden Floor Tile
13 WALL FINISHING 19 days Wed 6/8/22 Mon 7/4/22 WALL FINISHING
19 days
14 Wall (Base) 6 days Wed 6/8/22 Wed 6/15/22
6 days Wall (Base)
15 Manorbum Double paint from Dulux for the room internally 5 days Thu 6/16/22 Wed 6/22/22
5 days Manorbum Double paint from Dulux for the room internally
16 Lyttetto Paint from Dulux for the Exterior of Balcony 2 days Thu 6/23/22 Fri 6/24/22
2 days Lyttetto Paint from Dulux for the Exterior of Balcony
17 Wood Panel Imported from China 3 days Sat 6/25/22 Tue 6/28/22
Wood Panel Imported from China
18 Matte Porcelain Mosaic Tile for Bathroom from China 3 days Wed 6/29/22 Fri 7/1/22
3 days Matte Porcelain Mosaic Tile for Bathroom from China
19 CEILING FINISHING 3 days Tue 7/5/22 Thu 7/7/22 CEILING FINISHING
3 days
20 Gypsum Ceiling With Black Color 3 days Tue 7/5/22 Thu 7/7/22
3 days Gypsum Ceiling With Black Color
21 INSTALLATION WORKS 14 days Fri 7/8/22 Wed 7/27/22 INSTALLATION WORKS
14 days
22 Chandelier (ELK lighting, Elk1907588, 43W, China) 1 day Fri 7/8/22 Fri 7/8/22
1 day Chandelier (ELK lighting, Elk1907588, 43W, China)
Page 1
ID Task Name Duration Start Finish Apr '22 May '22 Jun '22 Jul '22 Aug '22 Sep '22 Oct '22
10 17 24 1 8 15 22 29 5 12 19 26 3 10 17 24 31 7 14 21 28 4 11 18 25 2
23 Recessed Slim Downlight-Die Casting Aluminum (24W, 220-240V) 3 days Sat 7/9/22 Tue 7/12/22
Recessed Slim Downlight-Die Casting Aluminum (24W, 2
24 Air Conditioner (1.5HP, LG, #S3-Q12JA3WA) 1 day Wed 7/13/22 Wed 7/13/22
1 day Air Conditioner (1.5HP, LG, #S3-Q12JA3WA)
25 Generators Imported from Thailand 1 day Thu 7/14/22 Thu 7/14/22
1 day Generators Imported from Thailand
26 Double Door H2.3 x L2.1m 1 day Fri 7/15/22 Fri 7/15/22
1 day Double Door H2.3 x L2.1m
27 Door H2.1 x L0.70m 1 day Sat 7/16/22 Sat 7/16/22
Door H2.1 x L0.70m
28 Slide Glass Door H2.3 x L2.0m 1 day Mon 7/18/22 Mon 7/18/22
1 day Slide Glass Door H2.3 x L2.0m
29 Glass Door H2.1 x L0.80m 1 day Tue 7/19/22 Tue 7/19/22
1 day Glass Door H2.1 x L0.80m
30 Project Window H2.1 x L2.4m 1 day Wed 7/20/22 Wed 7/20/22
1 day Project Window H2.1 x L2.4m
31 Project Window H2.5 x L0.60m 1 day Thu 7/21/22 Thu 7/21/22
1 day Project Window H2.5 x L0.60m
32 Fixed Window H2.1 x L1.6m 1 day Fri 7/22/22 Fri 7/22/22
1 day Fixed Window H2.1 x L1.6m
33 Fixed Window H2.6 x L2.8m 1 day Sat 7/23/22 Sat 7/23/22
Fixed Window H2.6 x L2.8m
34 FURNITURE AND EQUIPMENT INSTALLATION TASKS 13 days Thu 7/28/22 Mon 8/15/22 FURNITURE AND EQUIPMENT INSTALLATION TASKS
13 days
35 Beds for bedroom 1 day Thu 7/28/22 Thu 7/28/22
1 day Beds for bedroom
36 Wardrobe (#YJYG02) 1 day Fri 7/29/22 Fri 7/29/22
1 day Wardrobe (#YJYG02)
37 Table (#YLT-1501-01P) 1 day Sat 7/30/22 Sat 7/30/22
Table (#YLT-1501-01P)
38 Chair (#NSW540) 1 day Mon 8/1/22 Mon 8/1/22
1 day Chair (#NSW540)
39 TV Stand (#DSG-3) 1 day Tue 8/2/22 Tue 8/2/22
1 day TV Stand (#DSG-3)
40 Coffee Table (#Hlroundsidetable) 1 day Wed 8/3/22 Wed 8/3/22
1 day Coffee Table (#Hlroundsidetable)
41 Leisure Chair (#BP4015) 1 day Thu 8/4/22 Thu 8/4/22
1 day Leisure Chair (#BP4015)
42 Table (#LV016) 1 day Fri 8/5/22 Fri 8/5/22
1 day Table (#LV016)
43 Office Chair (@X#-59B-MF) 1 day Sat 8/6/22 Sat 8/6/22
Office Chair (@X#-59B-MF)
44 Curtain (#B08MQJSDN) 1 day Mon 8/8/22 Mon 8/8/22
1 day Curtain (#B08MQJSDN)
Page 2
ID Task Name Duration Start Finish Apr '22 May '22 Jun '22 Jul '22 Aug '22 Sep '22 Oct '22
10 17 24 1 8 15 22 29 5 12 19 26 3 10 17 24 31 7 14 21 28 4 11 18 25 2
45 Tv (Toshibar, 55-inch, #55C350KIJ) 1 day Tue 8/9/22 Tue 8/9/22
1 day Tv (Toshibar, 55-inch, #55C350KIJ)
46 Bookshelf (Customized) 1 day Wed 8/10/22 Wed 8/10/22
1 day Bookshelf (Customized)
47 Desk (#S-1650) 1 day Thu 8/11/22 Thu 8/11/22
1 day Desk (#S-1650)
Page 3