ITUNGAN KETERSEDIAAN AIR METODE MOCK

DAS WILAYAH
Luas DAS 57.50

No ITEM
1 Jumlah Hari n
2 Hari hujan n
3 Hujan R
4 Evapotranspirasi POT ETP

5 Parameter

Koefisien Bulan Basah 0-50% m 5


Soil moisture capacity 50-200 SMC 100
Percentage Error 5-30% PF 30
Koefisien infiltrasi 0-1 i 0.5791705
faktor resesi air 0-1 k 0.6629598
Innitial soil moisture 50-250 ISM 250
Innitial Ground water storage >0 Vn-1
6 Evapotranspirasi Aktual

E/Ep = (m/20) x (18 - n)


E = Ep (m/20) x (18 - n) E
Evapotranspirasi Aktual Eta
7 SoiL moisture beg V BEG
8 Storage Calculation V CAL
9 Soil moisture end V END
10 Water Balance

As = R-Eta
Limpasan badai SR = PF x R
Soil moisture storage SMS= ISM+As
Soil moisture deficit SMD = SMS - ISM
Water surplus WS = As-SMD WS
Run Off & Ground Water Storage
11 Infiltrasi i
12 1/2 (1+K)x(i)
13 K(Vn-1) 1 Step --------> (Vn-1)= 0

Vn= K(Vn-1)+0.5(1+K)I 1 Step


K(Vn-1) 2 Step --------> (Vn-1)= 0.00

Vn= K(Vn-1)+0.5(1+K)I 2 Step


K(Vn-1) 3 Step --------> (Vn-1)= 0.00

Vn= K(Vn-1)+0.5(1+K)I 3 Step


14 Ground water storage Vn
15 dVn= Vn - Vn-1
16 Base Flow BF = I - dVn BF
17 Direct Run off DRO = WS - i DRO
18 Run off RO = BF + DRO RO

19 Debit QA

20 Debit Observasi Q
H I K SMC (mm) GWS (mm)
Koef. mock
Km2 58% 66% 100 0
1-100 1-100 50-200 100-400

JAN I JAN II FEB I FEB II MAR I MAR II APR I


hr 15 16 14 14 15 16 15
hr 8 9 8 7 7 8 8
mm 90.83 98.16 114.39 104.57 93.04 111.77 94.13
mm/hr 3.73 3.76 3.85 3.90 3.84 3.70 3.86
mm/hr 55.92 60.10 53.94 54.60 57.62 59.20 57.97

% 5.0 5.0 5.0 5.0 5.0 5.0 5.0

mm 100.0 100.0 100.0 100.0 100.0 100.0 100.0

% 30.0 30.0 30.0 30.0 30.0 30.0 30.0


0.6 0.6 0.6 0.6 0.6 0.6 0.6
0.7 0.7 0.7 0.7 0.7 0.7 0.7

mm 250.0 250.0 250.0 250.0 250.0 250.0 250.0

mm

% 0.03 0.02 0.02 0.03 0.03 0.03 0.03

mm 1.40 1.42 1.35 1.53 1.56 1.55 1.49

mm 54.52 58.68 52.60 53.07 56.06 57.65 56.48

mm
mm
mm

mm 36.31 39.48 61.79 51.50 36.98 54.13 37.65

mm 27.25 29.45 34.32 31.37 27.91 33.53 28.24

mm 286.31 289.48 311.79 301.50 286.98 304.13 287.65

mm 36.31 3.17 22.31 -10.29 -14.51 17.14 -16.48

mm
mm
mm

mm
mm
mm
mm
mm
lt/dt
m3/dt
m3/dt 4.14 3.22 3.74 3.36 3.16 3.36 2.42

4.50

4.00

3.50

3.00

2.50

2.00

1.50

1.00
1.50

1.00

0.50

0.00
1 2 3 4 5 6 7 8 9
Hitunglah debit simulasi menggunakan metode Mock air di DAS berikut berdasark
Syarat : Korelasi antara debit hitungan dengan debit observasi lebih dari 75% dan v

APR II MEI I MEI II JUN I JUN II JUL I JUL II AGS I


15 15 16 15 15 15 16 15
4 3 3 2 2 0 1 1
57.22 17.88 24.68 2.50 9.70 0.00 2.45 2.50
3.42 3.30 3.66 3.00 2.84 3.04 3.00 3.04
51.25 49.50 58.61 45.02 42.59 45.65 47.93 45.62

5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0


100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0
30.0 30.0 30.0 30.0 30.0 30.0 30.0 30.0
0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6
0.7 0.7 0.7 0.7 0.7 0.7 0.7 0.7
250.0 250.0 250.0 250.0 250.0 250.0 250.0 250.0

0.03 0.04 0.04 0.04 0.04 0.05 0.04 0.04


1.75 1.86 2.25 1.83 1.73 2.05 2.01 1.94
49.50 47.64 56.36 43.19 40.86 43.60 45.93 43.68

7.72 -29.77 -31.68 -40.69 -31.16 -43.60 -43.47 -41.18


17.17 5.36 7.40 0.75 2.91 0.00 0.74 0.75
257.72 220.23 218.32 209.31 218.84 206.40 206.53 208.82
-29.93 -37.49 -1.91 -9.01 9.53 -12.44 0.12 2.30
1.98 1.44 1.29 1.15 1.19 1.00 1.13 1.06

AWLR
Hitungan
Hitungan

4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
S berikut berdasarkan KP 01 Jaringan Irigasi
lebih dari 75% dan volume error maksimal 30%

AGS II SEP I SEP II OKT I OKT II NOV I NOV II DES I


16 15 15 15 16 15 15 15
0 1 2 3 4 5 8 8
0.00 1.95 10.53 16.25 3.65 29.99 108.67 107.86
3.22 3.43 3.45 3.73 3.70 3.89 3.95 3.61
51.47 51.47 51.73 55.97 59.25 58.33 59.26 54.13

5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0


100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0
30.0 30.0 30.0 30.0 30.0 30.0 30.0 30.0
0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6
0.7 0.7 0.7 0.7 0.7 0.7 0.7 0.7
250.0 250.0 250.0 250.0 250.0 250.0 250.0 250.0

0.05 0.04 0.04 0.04 0.03 0.03 0.03 0.02


2.32 2.15 2.11 2.10 2.07 1.84 1.53 1.35
49.16 49.32 49.63 53.87 57.18 56.48 57.72 52.78

-49.16 -47.37 -39.10 -37.62 -53.54 -26.50 50.94 55.08


0.00 0.59 3.16 4.87 1.09 9.00 32.60 32.36
200.84 202.63 210.90 212.38 196.46 223.50 300.94 305.08
-7.98 1.79 8.26 1.48 -15.92 27.04 77.44 4.14
1.07 0.82 0.95 1.13 1.58 2.03 2.47 3.32
DES II
16
8
132.44
3.60
57.66

5.0
100.0
30.0
0.6
0.7
250.0

0.03
1.48
56.18

76.27
39.73
326.27
21.18
3.21
Curah Hujan diberbagai Stasiun ( mm )
No Tahun
Stasiun A Stasiun B Stasiun C Stasiun D Stasiun E
1 1984 116 89 103 99 100
2 1985 101 75 82 77 80
3 1986 131 90 120 70 91
4 1987 59 30 127 58 100
5 1988 60 55 72 102 95
6 1989 62 69 130 111 99
7 1990 64 71 97 151 65
8 1991 66 86 88 95 65
9 1992 68 67 119 74 47
10 1993 70 103 67 101 77
11 1994 72 117 58 105 88
12 1995 90 191 68 82 79
13 1996 74 80 116 88 112
14 1997 60 59 72 77 132
15 1998 82 122 129 100 101
16 1999 86 112 118 112 111
17 2000 109 89 98 90 152
18 2001 110 74 69 121 74
19 2002 99 63 56 66 83
20 2003 82 101 70 100 88
Hitunglah debit banjir rancangan kala ulang 2, 5, 10, 25, 50, 100
menggunakan hidrograf Nakayasu
Luas Tiap Stasiun (km2) :
Stasiun A 28.5
Stasiun B 36.75
Stasiun C 21.25
Stasiun D 47.25
Stasiun E 23.75

1). Data Umum Sungai :


Luas DAS = 157.500 Km2
Panjang Sungai Utama = 7.2 Km
Panjang Sungai Seluruhnya = 7.2 km
Elevasi Hulu = + 196 m
Elevasi Hilir = + 31 m
Kemiringan Dasar Sungai Rata-rata = 0.0229
Base Flow = 0.700 m3/det
(Asumsi)

3). Perkiraan Koefisien Pengaliran pada Penggunaan Lahan:


PENGGUNAAN LAHAN AREA (Ha) C
Permukiman 47.250 0.700
Sawah Irigasi 1.200 0.600
Sawah Tadah Hujan 2.500 0.600
Kebun/Perkebunan 3.600 0.500
Hutan 91.650 0.250
Semak/Belukar 2.800 0.600
Tegalan/Ladang 1.000 0.170
Rumput/Tanah Kosong 7.500 0.600
TOTAL 157.500