CM Calculation 1
CM Calculation 1
SAM of pants=
CM (@ 50 % efficiency) =
CM (@ 30 % efficiency) =
36 mins
6.67
(MHR X 8hrs) / (Target per day/ per macine / 8 hrs shift (@ 50% efficiency)
120
(MHR X 8hrs) / (Target per day/ per macine / 8 hrs shift (@ 30% efficiency)
200
1000
800 1.25
500 2
CM 100 114.2857
Fabric/meter 100.00
cons 1.35
Fabric/garment 135.00
CM 100.00
Trims 100.00
436.35
The scientific method for estimating CM (Cut and make) cost of a garment involve two steps as
1. First determine SAM of the garment (refer garment SAM calculation) and
And Cutting SAM is 2 minutes then estimated cutting cost will be = 2*0.40=0.8 INR
At this stage, supplier only get one sample of the garment and specification of fabric and trims for the reference.
For raw material cost suppliers directly take price quote from fabric and trim suppliers. For labor cost it is very
important to estimate as near as it will be during actual production.
The scientific method for estimating CM (Cut and make) cost of a garment involve two steps as
1. First determine SAM of the garment (refer garment SAM calculation) and
And Cutting SAM is 2 minutes then estimated cutting cost will be = 2*0.40=0.8 INR
SMV and SAM:- The Smv is calculated based on the gsd data and is standard ineffective of factory
conditions. SAM is calculated based on factory efficiency and vary depending on your factory
conditions labor efficiency policy allowances etc. therefore your sam varies due to this.
Productivity can be expressed in many ways but mostly productivity is measured as labour
productivity, machine productivity or value productivity. These three term can be defined as-
Labour productivity - Output per labour (direct +indirect) in a given time frame (in pieces)
Machine productivity - Output per machine in a given time frame (in pieces)
Value productivity - Total value of output in a given time frame.
sam=smv/costed effeciency
efficiency%= achived minute(no. of garment producexsam of one garment)
available minute(no of operator worksxtime of each operator)
14/50%=28min
480x12
30x480 40%
BASIC CAPACITY
CALCULATIONS
In the clothing industry, most
companies still work to standard
minutes, which is the calculated or
measured standard time to produce a
garment. A basic calculation may be
as follows:
8 working hours per day = 480
minutes
10 operators per team
Capacity = 4800 minutes per day
Standard Minutes for T-shirt style
a = 12 std min @ 100% efficiency =
4800/12 = 400 pieces per day
However, it may be necessary to
take into account the skills and
efficiency of different teams, or the
ability of a team to make different
products. For instance, if a team
normally make woven garments, to
change to a knitted T-shirt means that
they are less skilled at handling that
item of clothing. If they can only
achieve 75% efficiency, the output is
only 300 pieces per day. The impact
on the production plan is huge.
Many readers will be used to
volume manufacturing of widgets
and know about the steady
automation of their industries.
The clothing industry is still very
heavily dependent on human labour,
despite increasing use of automated
processes. Add to this the whims of
the fashion market, which cause
constant style changes (equivalent to
the constant engineering changes that
manufacturing engineers so hate),
and you have huge difficulty in
achieving efficiencies and optimising
operator skills. If you can keep a team
of operators making the same
type of product as long as possible,
production loss is minimised.
The plan must also consider the
specialist support areas. Working
back from the sewing plan, it is
necessary to calculate where the
loading will impact resources. The
plan must then allow for post-sewing
operations such as garment washing
(where relevant), otherwise the
sewing plan will be acceptable but
WIP builds up in the other areas.
Critical path analysis is a vital tool in
this process – if the plan moves, so
must the priorities.
The Concept of Operator's Performance Rating
Definition of Performance Rating:
Is alert to fumbles, hesitations, and other lost motions- these are seldom or absent in 100% performance.
Eliminates or ignores interruption or events not in the operator’s control.
Avoids a corrupting bias when observing fast and slow operators in succession
Knows that increasing the number of cycles observed increases accuracy
The Concept of Operator's Performance Rating
Definition of Performance Rating:
Rating is a subjective comparison of any condition or activity to a benchmark, based upon our experience. While
the mechanics of time study record the time a task did take, applying a rating will determine the time a task
should take.
What is 100% performance or Normal Performance?
The concept of 100% performance is a critical element of time study and performance measures. Normal performance is the
rate of output which qualified workers will achieves without over-exertion over the working day sifts provided they know
and adhere to the specified method and provided they are motivated to apply themselves to the work. This performance is
denoted as 100% on standard rating and performance scales.
A slower is performance rate, which will produce fewer pieces per hour, is recorded as a percentage below
100%. A faster performance rate that produces more pieces per hour is recorded as greater than 100%.
Characteristic of 100% Performance or Normal operator
Fluid motions without hesitation
No false starts or duplications
Consistent, coordinated, effective rhythm
No wasted actions or work
Attention centered on the task
How to get accurate rating?
To improve accuracy in rating an operator, observer must -
Has knowledge of the operation and the specified method or standard operating procedures for that task.
Concentrates on operator motions
Is alert to fumbles, hesitations, and other lost motions- these are seldom or absent in 100% performance.
Eliminates or ignores interruption or events not in the operator’s control.
Avoids a corrupting bias when observing fast and slow operators in succession
Knows that increasing the number of cycles observed increases accuracy
How to do Time Study for garment operations?
Definition of Time Study:
A stop watch
Time study format
One pen or pencil
Step 1: Preparation
Ready with stationeries like time study format, stop watch (digital one) and pencil
Tell the operator that you are going measure time he/she taking to do the job.
Observe the operation carefully and break down operation into elements.
Fill the basic information in the time study format. Like machine category, guide or attachment used.
Table -1
Step 3: Calculation of Basic time
Table-2
A stop watch
Time study format
One pen or pencil
An operation cycle consists of material handling, positioning and aligning parts, sewing, trimming
threads and tying and untying a bundle. So in the time study format, divide whole task into various
elements according to the motion sequences of the operation. For example, in operation ‘collar run
stitch’, task elements may be i) pick up panel to sew first seam, ii) turn collar to sew second seam, iii)
turn collar to sew third seam iv) check work and dispose and v) waiting for next pieces.
Step 1: Preparation
Ready with stationeries like time study format, stop watch (digital one) and pencil
Tell the operator that you are going measure time he/she taking to do the job.
Observe the operation carefully and break down operation into elements.
Fill the basic information in the time study format. Like machine category, guide or attachment used.
Now measure the time taken for completing each elements of the operation cycle by the operator.
Time should be captured in seconds. Similarly, capture element timing for consecutive 5 operation
cycles. During data capturing only note down reading (see following table-1) of the stop watch and
later calculate element timing. If you found any abnormal time in any elements record time during
time study and later discard that reading. Or you capture time for one more cycle. Abnormal time may
be occurred due to bobbin change, thread break, power cut or quality issues.
Table -1
Step 3: Calculation of Basic time
From the Reading (R) calculate time taken for each element for all five cycles just by deducting
previous Reading from elemental reading. Sum up times of five cycles for each element. Note, if you
discard any reading than in that case no. of cycles will be four. Calculate average element times. This
average time is called basic time. (in the following table-2 it is noted as average time)
Table-2
To convert basic time to normal you have to multiply it with operator performance rating. Here for
example, rating has been taken 100%. Now you have add allowances for machine allowances, fatigue
and personal needs etc. Add machine allowance only to those elements where machine is running and
fatigue and personal needs to all elements. Now we got standard time for each element in seconds.
Sum up all elemental time and convert seconds into minutes. This is standard minutes or SAM.
How to measure labor productivity?
Definition
Assume that
Total production in day =1200 pieces
Total labor (operator +helpers) = 37
Working time = 600 minutes (10 hours)
differ from one garment to another. Calculation of labor efficiency is shown below. Consider above data.
SAM (Standard allowed minutes) of the garment = 8.9
Minutes produced by each labor =(32.4 pieces X 8.9) = 288 minutes
Available minutes was 600
So, Labor efficiency = (Produced minutes/available minutes) = (288/600*100)% = 48%
How to measure labor productivity?
Definition
So, Labor productivity per 10 hours is =Total pieces produced/ total labor input = (1200/37) Pieces
=32.4 pieces.
Another productivity measure is labor efficiency, which is a comparison of the time spent working
productively to the total time spent at work. These metrics are appropriate for analyzing and comparing
the productivity of a particular production line or factory that turns out specific apparel products.
However, comparing productivity levels across products or operating lines can be difficult because the
differ from one garment to another. Calculation of labor efficiency is shown below. Consider above data.
SAM (Standard allowed minutes) of the garment = 8.9
Minutes produced by each labor =(32.4 pieces X 8.9) = 288 minutes
Available minutes was 600
So, Labor efficiency = (Produced minutes/available minutes) = (288/600*100)% = 48%
To compare productivity estimates across products, factories, or even industries, economists define
labor productivity as the production value added that each worker generates. In this case, labor
productivity equals the value of production divided by labor input. The value of production is generally
measured as value added, equal to the gross value of sales minus the value of purchased inputs such
as fabric, trim, and energy. Labor input is measured by total work hours. Labor productivity can thus be
estimated at the national, aggregate level and for specific industries in an economy.
How to estimate garment production?
One of the visitors asked this question that how to estimate production of a style from the line.
Suppose, SAM of the garment is 20 minutes, 30 operators line, works 8 hours shift day. Line
works at average 50% efficiency. Operators get total 45 minutes for lunch and tea break.
So, Total available man minutes = 30 X (8 X 60 – 45) = 13050 minutes
Daily estimated production = 13050 /20 * 50% = 326 pieces
You can expect above output from that line if everything is gone well. You can see the
production of a line is directly proportional to the line efficiency; no. of operators and working
hours. And production is reverse proportional to the garment SAM. If efficiency of a line
increases you can expect higher production. Similarly if SAM of style reduces at that also you
Factors that hamper production:
Any one of the following can reduce production of assembly line. So to get estimated output,
you have to take on the following areas.
i. Machine break down
ii. Imbalance line (WIP control)
iii. Continuous feeding to the line
iv. Quality problems
v. Individual operator performance level.
vi. Operator absenteeism
How to Balance a Traditional Sewing line?
Tools required:
i) Stop watch
ii) Spread sheet or Calculator
Important things to keep in mind:
How to Balance a Traditional Sewing line?
A sequence of operations is involved in making a garment. In bulk garment production, generally a team works in an
assembly line (Progressive Bundle system) and each operator do one operation and give it other operator to do next
operation. In this way garment reached to end of the line as a completed garment. In the assembly line after some time of
the line setting, it is found that at some places in the line, work is started to pile up and few operators sit idle due to
unavailability of work.
When this situation happens in the line it is called an imbalanced line. Normally it happens due to two main
reasons – a) variation in work content (time needed to do an operation) in different operations and b) operator’s
performance level. To meet the production target, maintaining smooth work flow in the line is very important.
So it is very important to know basics of quick line balancing.
How to balance an imbalanced line has been explained in the following. The main job in line balancing is to
eliminate or reduce WIP (work in process) at bottleneck operations. To do that you have to know which
operations are bottleneck in the line. Through capacity study and target setting you will find existing bottlenecks
in the line.
Tools required:
i) Stop watch
ii) Spread sheet or Calculator
Step 1: Capacity study: List down all operations (with operator name) as per operation sequence in a paper.
Using stop watch cycle time (time study) for each operation for five consecutive cycles. With average cycle time
calculate hourly capacity of the operators. (i.e. operation cycle time 30 seconds and total allowances is 20% then
capacity is 100 pieces per hour). Draw a line graph with per hour capacity data.
Step 2: Target setting: With the above capacity data set your target output per hour from one line. Generally it is
calculated using following formula (Target per hour= Total no of operators X 60 /garment SAM). Check current
hourly operator production report. Draw a straight line with target output data on the line graph.
Step 3: Identification of bottleneck areas: Now go to the capacity study table and compare each operator’s
capacity with the target capacity. Each individual operator whose capacity is less than the target output is
bottleneck operation for the line. It is impossible to improve imbalanced line’s output without improving output
Step 4: Eliminate bottlenecks from the line: Now to eliminate bottleneck areas use following methods which
suites best to your situation but don’t jump without trying initial steps.
i. Club operations where possible. Where there is higher capacity than the target output, give that
operator another operation with less work content. Considering machine type and sewing thread colours.
ii. Shuffle operators. Operations that have low work content use low performer there. And where work
content is higher use high performers.
iii. Reduce cycle time using work aids and attachments. To assist the operator in handling parts during
sewing, positioning cutting and disposing finished task, work aids, guides or attachment can be used. Think of
that if possible provide operator with aids. It will reduce operation cycle time.
iv. Improve workstation layout and improve methods. Most important area for improving output from a
particular operation is using best workstation layout and best method of work. There is always a chance that
though improving method of bottleneck operations you can do line balancing.
v. Add more operators at bottleneck operations. Adding one additional machine in easy task than others.
Before adding one more machine compare the cost-benefits of putting additional machine into the line. It can be
simple compared by estimating machine productivity in both cases.
vi. Do extra work at bottleneck operations. At lunch break and Tea break when each operator of the line
goes for break, bottleneck operator can continue work to feed next to his operator. Later he can take break. At
the end of the day tell this operator to work for one hour extra to reduce the WIP.
Important
i. things to
Conduct keep
Time in mind:
Study hourly basis and check output of each operator. Once you have eliminated one
bottleneck, you will find a new bottleneck operation. Follow the same methodology to improve line balancing.
Use of Takt Time in Apparel Industry
What is Takt Time?
Net available time = 4500 minutes / shift (10 operators total man-minutes)
Customer demand = 500 pieces / shift
Takt time = (4500÷500) = 9 minutes / piece
Important things to be noted that,
Takt time can’t be measured with a stop watch.
Takt time is not the time it takes to perform a task.
Takt time is only reduced or increased by changes in production demand or net available time to work.
How Takt is used to in Garment Production?
Takt time is a very important tool for Lean Line or One Piece Flow Production.
Use of Takt Time in Apparel Industry
Whattime
Takt is Takt Time?
is the allowable times to produce one product at the rate of customers’ demand. This is NOT the same as
cycle time, which is the normal time to complete an operation on a product (which should be less than or equal to TAKT
Takt time is the calculated pace of production based on the average speed at which the customer is buying a product or
service. The formula is net available time to produce per time period divided by customer demand per time period. For
example when,
Net available time = 4500 minutes / shift (10 operators total man-minutes)
Customer demand = 500 pieces / shift
Takt time = (4500÷500) = 9 minutes / piece
Important things to be noted that,
Takt time can’t be measured with a stop watch.
Takt time is not the time it takes to perform a task.
Takt time is only reduced or increased by changes in production demand or net available time to work.
How
As theTakt is usedsays,
definition to initGarment Production?
is the demand of customer or simply demand of following processes. To set a
production assembly line takt time is taken as a base to determine work content to be given to each
Taktexample,
For time is a demand
very important tool for Lean
from production lineLine
is 60orpieces
One Piece FlowIn
per hour. Production.
one hour you had only 3600 seconds. So
takt have
You time for the line will
to distribute all be 60 seconds/pieces
operations (3600 seconds/60
within 20 operators. pieces).will
All operations So,have
you different
know thatwork
yourcontent.
target ofSo
to equalise work content each operator will get work of about 60 seconds work content. For this, few