REBANA
The Future of West Java
a portfolio of new industrial area and
city development in west java
01
TABLE OF CONTENT
39 Investment Opportunities
15 Rebana In a Glance 41 Infrastructure Provider
51 Developer
16 New Development in North-Eastern Part of West Java 68 Tenant or Joint Developer
17 What is Rebana
18 New Industrial Area Development in Rebana
20 How To Get To Rebana
21 Spatial Structure Concept
22 What We Want to Achieve in Rebana
02
VISION
West Java as the Center
of Excellence Province
through Innovation and
Collaboration
03
01
WEST JAVA
OVERVIEW
Demographic Condition
Social Condition
Economic Condition
Investment Realization
Top 5 Investment
Top Priorities Investment
Nationwide Potential Investment Development
Industrial Estates Portfolio
04
DEMOGRAPHIC
CONDITION
35,378KM2
1.8%
of Indonesia’s Total Area
Population
WEST JAVA
48M
Productive Age Population Population Density
37.5M 1,394/KM2
Population Growth Rate Sex Ratio West Java In Indonesia
Is Located In Java Island
1.11%
Male : Female
SOCIAL
CONDITION
Having two sides of one coin, West Java has both AVERAGE LENGTH
ECONOMIC GROWTH RATE ASSOCIATED WITH OF SCHOOL
PURCHASING POWER, POVERTY RATE, numerous potentials and challenges that can be seen
from some indicators below. Our goal is to optimize
8.55
HDI INDICATOR
AND INFLATION RATE YEAR
the potentials and to overcome the challenges at the
Grow 0.18 year from 2019
11500 12 same time through the
Indonesia: 8.48 year
programs we deliver. NEEDY PEOPLE
4.19 MILLION
Purchasing Power (thousand IDR)
SCHOOL LIFE
11000 8 TOTAL WORKFORCE PEOPLE EXPECTANCY
POVERTY
PEOPLE POVERTY RATE
YEAR
8.43%
Percent
Grow 0.37 million people
10500 4 from 2019 Grow 0.02 year from 2019
WORKFORCE
Indonesia: 138.22 million Grow 1.61% from 2019 Indonesia: 12.98 year
people
Indonesia: 10,19%
10000 0 PURCHASING
UNEMPLOYMENT RATE NEEDY PEOPLE BASED ON POWER
10.46% 10.85
LOCATION
MILLION
Urban 7.79% IDR/YEAR
9500 -4
Grow 2.42% from 2019 Rural 10.64% Drop 0.3 million/year from 2019
2016 2017 2018 2019 2020
Indonesia: 7.07% GINI RATIO Indonesia: 11.013
Purchasing Power Economic Growth Rate
million/year
Poverty Rate Inflation Rate HUMAN DEVELOPMENT
INDEX 0.398 LIFE
Social conditions that were indicated by the poverty
72.09
Same as 2019 EXPECTANCY
73.04
rate, purchasing power, and inflation rate tended to Indonesia: 0.385
YEAR
improve over the years. However, 2020 has been a Categorized as “High” The highest is
Yogyakarta: 0.437
tough year due to the pandemic. Hence, West Java Grow 0.06 from 2019
The lowest is
Grow 0.19 year from 2019
continues to fight for socio-economic recovery Indonesia: 71.94 Bangka Belitung: 0.257 Indonesia: 71.47 year
ECONOMIC
CONDITION
149 41.2%
Trillion USD OF WEST JAVA’S GDRP IS IN
MANUFACTURING SECTOR
NET EXPORT
Billion USD
BALANCE OF TRADE
Billion USD
IS TOTAL WEST JAVA’S
GDRP
ECONOMIC
RECOVERY
ECONOMIC GROWTH RATE OF To overcome the pandemic’s impact, West Java continues
WEST JAVA AND INDONESIA 2013 – 2021 (Q2) to fight for socio-economic recovery through various
West Java strategies.
Indonesia 7.07
5.05 5.66 5.33 5.66 5.07 SOCIETY SPENDING
Driving the middle and upper-class society to
5.17 6.13 spend as much as money, particularly to the small
4.88 5.03 5.07 5.02
and medium enterprises.
6.13%
WEST JAVA
INVESTMENT
ECONOMIC GROWTH RATE
2021 (Q2) Inviting investors from domestic and foreign
countries to invest in West Java by providing
Typically, West Java’s economic growth rate is always development projects and an investment-friendly
higher than National. However, in 2020, West Java was ecosystem.
more impacted by the pandemic resulting in a lower
economic growth rate than National. In Q2 2021, there has EXPORT
been an economic recovery. Enhancing the export activities from West Java.
one of those is collaborating with foreign trading
chambers and international embassies.
Source: Indonesia Central Bureau of Statistic, 2021
08
INVESTMENT REALIZATION
IN WEST JAVA
TOP 5 TOTAL FOREIGN
INVESTMENT REALIZATION IN INDONESIA DIRECT INVESTMENT REALIZATION ( January – December 2020)
140 Others
48.59%
Investment Realization (Trillion Rupiah)
Residential,
14.88% Industrial Estates,
and Offices
16.37% Automotive and
Other Transportations
Transportation,
5.82% Warehouse, and
Telecommunication
14.94% Electricity, Gas,
and Water
Residential,
4.81% Chemical and
Pharmaceutical 13.61% Industrial Estates,
and Offices
Source: West Java Investment and One Stop Service Agency, 2020
10
FOREIGN INVESTMENT
IN WEST JAVA
TOTAL INVESTMENT TOTAL PROJECTS
In 2020, there were USD 4,793 million In 2020, there were 11,031 invested projects
from 63 foreign countries from 63 foreign countries
that invested in West Java that invested in West Java
Source: West Java Investment and One Stop Service Agency, 2020
11
BUSINESS OPPORTUNITIES
FOR WEST JAVA
10 AT
MEGATRENDS TRADE WAR A E I
TIPPING Look to house economic activity moving away from China
POINT
A Industry 4.0
A E I
NATIONAL SELF DEPENDENCY
Digital and Step up and be the provider of strategic goods for Indonesia and abroad (Health, Food, etc.)
B
data
Energy D
F DIGITAL INNOVATION A B C
revolution
Create an innovation hub, manufacture in demand enablers
Health and
G
wellness
SUSTAINABILITY D F H
H Home and city Wide range of opportunities, from solar panel manufacturing to geothermal energy innovation
I Globalization
TOURISM D I
We expect demand to become local in the short-term & return in the long-term – now may be the
Life sciences
J time to invest
booming
INDUSTRIAL ESTATES
32 8 IN REGENCIES
TOTAL AREA
20,627 HA
35%
of industrial estates total area in Indonesia
are located in West Java
02
REBANA
IN A GLANCE
New Development in North-Eastern Part of West Java
What is Rebana
What We Want to Achieve in Rebana
Area Designation Around Rebana
New Industrial Area and City Development in Rebana
How To Get To Rebana
16
NEW DEVELOPMENT
IN NORTH-EASTERN PART OF WEST JAVA
West Java will expand its north-eastern part into a new
industrial and cities area. It is called Rebana which is located in
Subang, Sumedang, Indramayu, Majalengka,
Kuningan, Cirebon City, and Cirebon Regency
The anchors of this area are Patimban Seaport and Kertajati
Airport that will become the logistics and connectivity centers.
Existing
Industrial Estates
Seaport
Airport
17
WHAT IS
Integrated
REBANA connectivity between logistics hubs, industrial
estates, urban areas, and sub-urban areas as
Rebana is a regional agglomeration as a motor well as synergy in logistic chains of large,
of economic growth in the North-East region medium, and small industries
of West Java based on the industrial
Innovative
development that is integrated, innovative,
regional development based on the
collaborative, highly competitive, and technological innovation, creative economy,
sustainable. entrepreneurship and innovative human
resources to welcome the future industry 4.0
Live
Collaborative
Live Work Play regional collaboration platform between
stakeholders (central, provincial, and city level
of government, business, industry, academia,
and community)
Live Live
Highly Competitive
Work Play Work Play Work Play highly ease of doing business supported by
fiscal and non-fiscal easiness and facilities as
well as the readiness of various supporting
infrastructure
The development in Rebana is encouraged not
to be exclusively separated in clusters. One area Sustainable
must cover at least three of live, work, and play environmental friendly industrial estates to
functions. minimize carbon emissions while maintaining
sustainable food agriculture areas
18
TOTAL AREA
01 43.913 HA
08
03
09
02
05
04
06 07
19
04. BUTOM 05. KERTAJATI 06. JATIWANGI 07. CIREBON 08. KRANGKENG
09. TUKDANA 10. BALONGAN 11. LOSARANG 12. PATROL 13. PATIMBAN
3h 15m 2h – 2h 30m 4 – 5h
1h 5m 45m
From Halim From Kertajati
to Kertajati to Semarang
3h 15m 2h 50m
From Gambir From Cirebon Station
to Cirebon Station to Semarang
Planned Railway
Railway Reactivation
Existing Railway
High Speed Train
21
METROPOLITAN POLISENTRIK
Growth Pole
Growth Foundation
22
Economic Growth
7.16% in 2030
Without development of Rebana, West Java
will only grow at 5.68% in the same year
Job Creation
4.39 million
total new job creations until 2030
Through the development of industries and Investment Growth
other services, we are optimistic to create
around 400,000 new employment per year
while the total population by the end of
7.77% in 2030
2030 in Rebana is forecasted to be more Rebana is driven to be an investment
than 9 million people friendly area that boost the increase of
investment
23
03
THE EXCELLENCE
OF REBANA
Best in Class Infrastructure
Investment Ecosystem
Human Capital
Financial Incentives
Permit Facilities
24
01 02 03 04 05
BEST IN CLASS INVESTMENT HUMAN FINANCIAL PERMIT
INFRASTRUCTURE ECOSYSTEM CAPITAL INCENTIVES FACILITIES
Rebana is supported by a Rebana already has large West Java is the most West Java Government has West Java government gives
great deal of infrastructure existing industrial areas, populous province of committed to support all a highly dedication, attention,
including toll road, airport, processing industrial areas Indonesia. So, West Java has investments entered West and support to make this
seaport, electricity, water, that include a huge number abundant high qualified Java by providing Financial project happens. The West
waste treatment, and data of companies from both local labour supply and Incentives for investors. Java Government
center. and foreign investors. competitive regional salary. Based on the national collaborated with Central
regulation financial Government has committed
incentives are given for to offer the easiness of
special investment permit application.
25
NATIONAL ROAD
PROVINCIAL ROAD
TOLL ROAD
• Cikopo-Palimanan (Cipali)
• Palimanan-Kanci (Palikanci)
RAILWAY
• Cikampek – Cirebon
AIRPORT
• Kertajati Airport
SEAPORT
• Balongan
• Patimban
• Cirebon
TERMINAL
• Subang
• Indramayu
• Sumber, Cirebon
26
Dam/ Steam
Reservoir Power Plant
11
01 Cipancuh 11 Indramayu
02 Jatigede 12 Jawa 1
03 Sindang Pano 13 Jawa 3
14 04 Rancabeureum
05 Setupatok Refinery
06 Sedong
14 Balongan
Hydro Power
01 Plant Final Waste
Disposal
07 Jatigede
15 Cirebon
Geothermal
03 04
08 Tampomas
09 Ciremai
10 Mangunan Wanayasa
08
10 05 12
07 13 National
Road
Provincial
15 Road
09
Toll Road
06
02
27
Railway
National Road
Provincial Road
Toll Road
Airport
Seaport
Terminal
28
16 8
Majalengka
14 7
Sumedang
12 6
Percent
Percent
Indramayu West Java
Majalengka Indonesia
10 Cirebon 5
Cirebon
Indonesia
Sumedang Indramayu
Subang
8 Subang 4
West Java
6 3
2015 2016 2017 2018 2019 2015 2016 2017 2018 2019
The percentage of poverty rate of the five regions in The economic growth from 2015 to 2019 in the 5
Rebana tends to be declining every year which shows a regions inside Rebana is a little bit vary and most of
good development is implemented in these areas. them shows has a good trend to be escalated and will
Which means the local government is putting a serious be strengthen along the progress of Rebana
note on a development and support on the upcoming
investments inside the regions.
EXISTING INDUSTRIES
INVESTMENT
AROUND REBANA ECOSYSTEM
27 EXISTING
DI
PT RNI PT KESEPUHAN BULK TERMINAL
PT EKA KARTOINDO ASRI DI DI
DI
PT JINJING GAS
PT TAKENAKA INDONESIA
FI
8 PROCESS
DI
PTPN VIII
DI
PT STARCAMAPPAREL INDONESIA
DI
11 PLANNING
PT HARTA BETON SEJAHTERA
PT TAIFA JAYA DI
FI * DI : Domestic Investment
PT BOUNTY PT BERNOFARM FI : Foreign Investment
FI DI
PT PG RAJAWALI
PT PULAI INTAN LESTARI DI
DI
TAX FINANCIAL
INCENTIVES
INCENTIVES
The Incentives are applied for pioneer industries. Pioneer industry is an List of Pioneer Industries
industries having a broad linkages, providing high added value and high 1. Upstream basic metals
externalities, introducing new technologies, and having strategic value for
2. Oil and gas refining
national development.
3. Petrochemicals arising from oil, gas or coal
Facility of exemption or reduction of 4. Inorganic basic chemicals
corporate income tax
5. Organic base chemicals derived from
Tax holiday or tax allowance for Period Of 5 years for $ 35 – 70 M agricultural, plantation or forestry activity
new capital investment of pioneer Reduction 7 years for $ 70 – 350 M 6. Pharmaceuticals raw materials
industry 10 years for $ 350 – 1050 M
7. Semi conductors or other component for
15 years for $ 1050 – 2100 M
computer
Net income deduction up to 60% 20 years for > $ 2100 M
from investment value in the form 8. Communication equipment
of tangible fixed assets including 9. Health equipment
land for labor intensive industries Reduction 100 % (single rate to nil) 10. Motor vehicle production equipment
Of
Gross income deduction up to Corporate 11. Robotics components
200% from cost expended for Income Tax 12. Electrical motors of internal combustion
conducting work practices, engines components
apprenticeship, and/or learning 13. Vessel components
activities in order to develop Transition 50% Corporate Income
human resource Tax reduction for the next 14. Aircraft components
2 years 15. Locomotive components
Gross income deduction up to 16. Power plant machinery components
300% from cost expended for
domestic companies conducting 17. Economic infrastructure
research and development in 18. Digital economy
Indonesia
Regulated in Government Regulation no 45 / 2019 and Minister of Finance Regulation No 128 / PMK.010 / 2019
33
TAX FINANCIAL
INCENTIVES
INCENTIVES
Tax Holiday and Mini Tax Holiday are facilities INCENTIVE SCHEME LIST OF PIONEER INDUSTRIES
for reducing Corporate Income Tax (CIT)
from the income obtained from Main TAX HOLIDAY 1. Upstream basic metals
Business Activities. 2. Oil and gas refinery
Corporate 100 % 3. Petrochemicals from oil, gas, or coal
CRITERIA Income Tax for minimum investment of
Reduction IDR 500 Billion 4. Inorganic basic chemicals
Given to new investment or business
expansion 5. Organic base chemicals derived from the
Period of 5 years for IDR 500 B to 1 T
Minimum investment IDR 100 Billion agricultural, plantation, or forestry activity
Facilities 7 years for IDR 1 T to 5 T
Given to company running in the group of Based on 10 years for IDR 5 T to 15 T 6. Pharmaceuticals raw materials
18 Pioneer Industries Investment 15 years for IDR 15 T to 30 T 7. Semi-conductors or other components
If not included in Pioneer Industries, Value 20 years for > IDR 30 T for computer
company can request for reduction of CIT
facilities by fulfilling quantitative criteria of 50% Corporate Income 8. Communication equipment
Additional
Pioneer Industries with the minimum Tax reduction for the next 9. Health equipment
Period
score 80 2 years
10. Motor vehicle production equipment
HOW TO APPLY MINI TAX HOLIDAY 11. Robotics components
Access One Single Submission (OSS) 12. Electrical motors of internal combustion
portal in https://oss.go.id/ Corporate 50 % engines components
Fill in data of planned project Income Tax for investment value between 13. Vessel components
Submit the required document to request Reduction IDR 100 to 500 Billion 14. Aircraft components
for tax holiday
OSS will verify the administrative Period of 15. Locomotive components
requirements within 5 working days. Facilities 5 years 16. Power plant machinery components
If not complete, requestor will be given 3 17. Economic infrastructure
working days to revise or add more data 25% Corporate Income
Additional
If complete, OSS will issue an approval for Tax reduction for the next 18. Digital economy
Period
granting tax holiday facilities 2 years
Regulated in Minister of Finance Decree no 96 / 2020 Regulated in Minister of Finance Decree no 16 /PMK.010/2020
35
Regulated in Minister of Finance Decree no 128/PMK.010/2019 Regulated in Minister of Finance Decree no 153/PMK.010/2020
36
CLOUD
CLOUD
MOUNTAIN
HORIZON
WATER
04
INVESTMENT
OPPORTUNITIES
Investment Opportunities as Infrastructure Provider
Investment Opportunities as Developer
Investment Opportunities as Tenant
Construction Progress of Patimban Seaport
41
Investment Opportunities
A
Investment Opportunities
As Infrastructure Provider
Infrastructure Development Plan
Utilities Development Plan
Patimban Seaport
Kertajati Airport
Medium Speed Railway
Jatigede Water Treatment Plant
Greater Cirebon Waste Treatment Plant
42
42 Toll Road
06
35 Non-Toll Road
12 Railway
08 Bridge
Flyover
43 33 Airport
02 11
38
31 Port & Dryport
30 34 LRT & Public Transportation
10 23
Toll Road Construction
Planned Toll Road
03 Existing Toll Road
Arterial Road
32 Planned Railway
15 20 40 13 Railway Reactivation
05 04 Existing Railway
21 High Speed Train
17 41 44
16 39
01 18 29 45
07
36
28 14
09 37
25
19 24
22 26
27
43
*Under Construction
44
09
03 Water
Energy
Waste
Telecommunication
13
11 Toll Road Construction
Planned Toll Road
02 Existing Toll Road
Arterial Road
08 Planned Railway
Railway Reactivation
14 Existing Railway
High Speed Train
05 17
21
22
20
19
06 15
12
45
ELECTRICITY WASTE
01 Patimban 15 Greater Cirebon Waste Treatment Plant
02 Cibogo 16 Patimban Intregated Waste Management Plant
03 Sukamandi-Haurgeulis 17 Greater Cirebon Waste Water Treatment Plant
04 Indramayu 18 Patimban Waste Water Treatment Plant
05 Kadipaten 19 Cirebon Intregated Waste Treatment Plant Unit
20 Cipanas Waste Waster Treatment Plant
WATER
06 Jatigede Water Treatment Plant TELECOMMUNICATION
07 Patimban Water Treatment Plant 21 Ducting System
08 Cipanas Water Treatment Plant 22 ICT Data Centre
09 Tarum Timur Water Treatment Plant
10 Cipunagara Dam
11 Sadawarna Dam*
12 Kadumalik Dam
13 Cilame Dam
14 Cipanas Dam*
*Under Construction
46
PATIMBAN
SEAPORT
STAGE 1-1 CONTAINER TERMINAL STAGE 1-2 CONTAINER TERMINAL STAGE 2 CONTAINER TERMINAL STAGE 3 CONTAINER
(Present) 35 Ha (Capacity 250.000 2021—2023 66 Ha (Cumulative PPP Cumulative capacity 5.5 PPP TERMINAL
2018—2021 TEUS) LOAN JICA capacity 3,75 million TEUs) 2024—2025 million TEUs 2026—2027 Cumulative capacity
IDR 9.5 T
LOAN JICA VEHICLE TERMINAL VEHICLE TERMINAL
LOAN JICA LOAN JICA 7.0 million TEUs
IP-577 Green Book IDR 7.58 T IDR 3.86 T
25 Ha (Capacity 218.000 Bappenas Capacity 382.000 CBU
IDR 14 T CBU) 2019 RORO TERMINAL 200 m
47
KERTAJATI
AIRPORT
LOCATION
Majalengka,
West Java
JAKARTA - SURABAYA
MEDIUM SPEED RAILWAY
LOCATION
Jakarta – Surabaya
JAKARTA
Main Station:
Manggarai (Jakarta)
SEMARANG
Cirebon (West Java)
CIREBON Semarang (Central Java)
BANDUNG
SURABAYA Surabaya Pasarturi (East Java)
RAILWAY
YOGYAKARTA
LENGTH
Phase 1: 435.4 Km
Phase 2: 713.2 Km
New Single Track 435,4kms Existing Track 277,8kms
PHASE 1 Vmax 160km/h Vmax 120km/h LAND REQUIRED
Travel Time 3h 21m Travel Time 3h 29m
1,248 Ha
New Single Track 713,2kms
Land Acquisition Value:
PHASE 2 Vmax 160km/h
Travel Time 5h 30m IDR 17.11 Trillion
INVESTMENT VALUE
JATIGEDE
WATER TREATMENT PLANT
Jatigede Regional Water Treatment is a water supply
project planned by West Java Government in Sumedang
Regency. The project aims to equally distribute clean
water and increase the coverage area of clean water
service in Greater Cirebon Area. The system is designed
with a capacity of 1,500 lt/s which will flow through 5
municipalities. Business Enterprise assists the
investment, construction and operation of the
production and transmission system to the Reservoir at
7 off-take locations. The return on investment is
obtained from the sale of bulk water to Regional Drinking
Water Companies in 5 cities.
Coverage Area
Cirebon, Cirebon Regency, Majalengka Regency,
Sumedang Regency, Indramayu Regency.
Location
Sumedang Regency
Beneficiaries
Investment Value :
120,000 Household or 600,000 people
IDR 2.1 Water Capacity
TRILLION 1,500 Lt/Sec
Project Progress
Final Business Case Preparation
50
GREATER CIREBON
WASTE TREATMENT PLANT
Project Owner Greater Cirebon Waste Treatment Plant
located in Ciwaringin, Cirebon that is
PT. Migas Hulu Jabar
designed to cover Greater Cirebon
area. This project will manage solid
Location waste generated from 5 municipalities.
Ciwaringin, Cirebon Reference technology used in feasibility
study is Waste-to-RDF considering the
availability of off-taker near the plant,
Project Progress
namely Indocement, and 2 Steam
Bidding Preparation Power Plants. Other than that, revenue
will also come from tipping fee charged
Total Area to beneficiary cities.
52 Ha
Potential Off-takers
Land Owner Indocement
Perum Perhutani Cirebon Steam Power Plant
Investment Opportunities
B
Investment Opportunities
As Infrastructure Provider
Type of Industries
Cipali West Subang
Cipali East Subang
Cipali Indramayu
Butom
Kertajati
Jatiwangi
Cirebon
Krangkeng
Tukdana
Balongan
Losarang
Patrol
Patimban
Patimban New City
52
There are 13 new industrial area development that have already Industrial Area Development
complied with the spatial plan regulation. Investors are very
Cipali West Subang (10,408 Ha)
welcome to develop new industrial estates, factories on the
designated areas. Other than that, investors also possible to Butom (4,092 Ha)
develop new cities around the industrial areas. Tukdana (563 Ha)
Patrol (4,141 Ha)
Cipali East Subang (4,806 Ha)
Losarang (6,710 Ha)
Cirebon (1,815 Ha)
Kertajati (1,415 Ha)
Cipali Indramayu (2,875 Ha)
Krangkeng (3,452 Ha)
Balongan (2,122 Ha)
Patimban (542 Ha)
Jatiwangi (972 Ha)
TOTAL AREA
43.913 HA
53
TYPE OF INDUSTRIES
Here is a grouping based on the type of industries that might be suitable to be developed in the particular area in
Rebana by considering the surrounding advantages of geographical and social condition. This grouping does not mean
to close the possibility to develop other types of industries.
Location:
Subang
10,408 HA
Location:
Subang
4,806 HA
CIPALI INDRAMAYU
Location:
Indramayu
2,875 HA
Coordinate: Development
N : 6° 31' 55.38" S specialization: Electronics Industries,
S : 6° 39' 28.8" S Food Processing Industries, Transportation Industries,
W : 107° 51' 18.576" E Metal Industries, Rubber Industries
E : 108° 2' 44.88" E Manufacture Industries,
Textile Industries,
57
BUTOM
Location:
Sumedang
4,092 HA
Butom area stands for Buah Dua, Ujung Jaya, and Tomo.
Those are the sub-districts in Sumedang Regency where
this area is located. This area is divided into 3 stretches
of land where situated to the south of Cipali Indramayu
and Kertajati areas.
Apart from being on a flat stretch, this area is also close
to the mountainous area to the south. This area is the
closest to the mountains among other development
areas in Rebana. Therefore, the mildness and the
potential of nature can be used as an advantage that
provides benefits.
KERTAJATI
Location:
Majalengka
1,415 HA
JATIWANGI
Location:
Majalengka
972 HA
CIREBON
Location:
Cirebon
1,815 HA
KRANGKENG
Location:
Indramayu
3,452 HA
TUKDANA
Location:
Indramayu
563 HA
BALONGAN
Location:
Indramayu
563 HA
LOSARANG
Location:
Indramayu
6,710 HA
PATROL
Location:
Indramayu
4,141 HA
PATIMBAN
Location:
Subang
542 HA
NEW CITY
DEVELOPMENT
Location:
Gold Course Subang
Maritime School
Theme Park
Public Beach
Country Club
Expo
6,028 HA
Marina
Canal
System
Other than new industrial area development, in Patimban
will also have prospect development as coastal city that
supports logistic hub and port activities.
Seaport
Central The city is suitable for the development of residential,
Park office, park, transportation, plantation, fishery, and other
buffer zone.
68
Investment Opportunities
C
Investment Opportunities
As Tenant or Joint Developer
Ready-to-offer Estates
Subang Smartpolitan
Taifa Jaya Development
Manyingsal-Subang Integrated Industrial Estate
Kertajati Aerocity
Subang Industrial Park
Kertajati Industrial Estate Majalengka
Metropolitan Kertajati Development
01 69
SUBANG SMARTPOLITAN 01
2,717 HA
GRAND REBANA 03
01
1,508 HA
REBANA TECHNOPOLIS 04
03
02
6,127 HA
KERTAJATI AEROCITY 05
3,480 HA
04
05 KERTAJATI INDUSTRIAL
ESTATE MAJALENGKA 06
400 HA
07
METLAND 07
06 330 HA
70
SUBANG SMARTPOLITAN
PT SURYACIPTA SWADAYA
Developer Concept
The portion of land inside the PT Suryacipta Swadaya Smart and Sustainable City
red line is proposed to be the
Special Economic Zone Location Potential Tenants
Cipali West Subang • Automotive (incl. EV & Battery)
Total Proposed SEZ Size • Consumer Goods (Incl. F&B)
530 Ha Total Area • Pharma & Medical Equipment
2,717 Ha • High Precision Industries
Land Allocation • IT (Incl. Data Centre)
• Logistics
• Industrial Lot (1,060 Ha)
• Commercial (206 Ha) Legalities
• Residential (257 Ha) • Industrial Estates Business Permit is
Jakarta • Green & Open Space (200 Ha) already obtained (2,000 Ha)
• Utility & Infrastructure (212 Ha) • On-Going process for SEZ status
• Public Facility (15 Ha) (530 Ha)
• Future Development (767 Ha)
Contact
Accessibilities
Industrial Lot • Binawati Dewi (Sales Manager)
• Cipali Toll road
Commercial Lot +62 812 8236 791
• Patimban Access Toll Road with
Residential Lot binawati.dewi@suryacipta.com
Public Facility dedicated Toll Gate (planned)
• Putri Arum Dwiani (Sales Supervisor)
Private Amenity • Sadang-Subang non-toll road
Utility +62 812 8469 2572
Green Open Space Phase 1 Development putri.arum@suryacipta.com
Pond Total Area : 400 Ha
• • The Manor Office Park
Road
• Residential Area : 40 Ha Jl. Surya Utama Kav. C1
• Diamond Bay : 60 Ha Karawang 0267 440088
• Handover : Q1 2023 www.suryacipta.com
71
Location
Subang
Total Area
94 HA
GRAND REBANA
RNI - JIEP - PP
Developer
PT Pembangunan
Perumahan
Total Area
1,508 Ha
Location
Industry Clusters
Manyingsal, Subang
F&B
Textile & Clothing
Contact Automotive
Ricko Wahyudi Electronic
+62 818 5401 01 Chemical
Mixed / Small Medium Industries
www.rni.co.id Halal Industry Boundaries
73
KERTAJATI AEROCITY
PT BANDARUDARA INTERNASIONAL JAWA BARAT
Developer
PT BIJB
Green & Blue
Industrial & Warehouse Zone
Office & Commercial Zone
Mixed-Use Zone
BANDARUDARA Residential Zone
INTERNASIONAL Public Facilities
JAWA BARAT
Location
Majalengka
Total Area
3,480 HA
Contact
2nd Floor – Domestic
Terminal (Office Area)
West Java
International Airport
Kertajati
Majalengka, West Java
+622 31 3000 301
www.bijb.co.id
74
REBANA TECHNOPOLIS
PT PERKEBUNAN NUSANTARA VIII
400 HA
D
Contact
Michael H Danubrata
Project Owner J
+62 812 9312 6511 C
Michaelhanadidanubrata@gmail.com
Yusak Tedjasukmana Industrial Area
Marketing Officer
+62 811 8532 51 Cluster Area K
(Residential, Warehouse, B
Kiem.majalengka@gmail.com A
Small Medium Industry)
Jl Raya Kertajati -Jatibarang Km 5,5
Business Center
Majalengka/Exit toll Cipali km157
76
Developer
REGIONAL
PT Metropolitan Land HOSPITAL
(2 HA)
KERTAJATI AIRPORT
Location
Majalengka
PHASE 2
Total Area
330 Ha
PHASE 1