You are on page 1of 6

YOU & Us Investment png l

Daily Work Report

Date Com/Per Name Nature of Work Time In

2/29/2024 Supreme Investment Plumber on Progress

2/29/2024 Supreme Investment Airconditon

2/29/2024 Water Systems - Quali Pure Bottle Waters

2/29/2024 Benji Port Pass & Airport Pass

2/29/2024 Yollendar Phone

2/29/2024 Digitec PNG Printer

2/29/2024 NAC Operation

2/29/2024 Benji - Bishop Brothers Tshirts and Vests

2/29/2024 Benji - PNG Embroidery Logo on Tshirts

Prepaid By: Yollendar Jovopa Signture:


vestment png limited
ly Work Report

Time In Time Out Comment

1.00pm 4.30pm Job not complete Yet

Didn’t attend today, call but no


response

1.45pm 1.50pm Received 3x Bottle waters

Still Fellow Up

Received

Quote Pending

Pending

2.20pm 3.50pm Quotation

2.20pm 3.50pm Quotation

Signture:
Al-Madina Steel Works
CEO.Muhammad Zafar Contact No.0300-6665436 E-Mail: MZ66
workshop no.# 3 Sargodha Road Faisalabad.

Quotation For Wear House M.S shed with steel sheet

CUSTOMER NAME: NESTLE DISTIBUTERS FAISALABAD

Parameters App.
Clear Span Width 70 FT
Length 140 FT
Ridge Height 16 FT
Bays Spacing 18 FT
Lift & Right Hight 12 FT
Lift & Right column spacing 18 FT

Material Detail:
Main Frame & Roof Specification
Vertical pipe 6" X 6" ( 14 Gage)
Horizental Pipe 4" x 4" (14 Gage)
Base Plate 12" X 12" 10 MM
Foundation Bolt 16 mm (18")
Parnur 3" X 1.4" (16 G parnur to parnur dista
High Rib Sheet 24 Gage
Color Company Painted
Glasswol 1" Made in China
Measurement APP.
L X W ( 140 X70) 9800 SFT
Rate 350/SFT
Total Amount App. Rs.3,430,000/-
Terms & Conditions
35% amount received as advance of total contract value. ( cash or bank a/c)
30% at the time deliver of frame at site of contract value.
30% at the time of complete shed structure installsation
5% after completion of work.
All civil ,electric,plumbing ,doors,window,partitions work excluded in this proposal.
we dedction w.h.tax 4.5%
we paid all transportation charges.
Total time required to work 40 days