Ref : OFFER/KPC/SSL/23-24/1967 DATE : 22.03.2024


M/s. Sahaj Solar Ltd
Ahmedabad [Gujarat]
Kind Attn : Mr. Hardik Parmar– 06351839020
Email : project@sahajsolar.com
Sub : Offer for 4000 KVA / 11 /0.800 KV Inverter Duty Transformer as per IS: 1180
Ref : Your Inquiry By Telephonic Discussion With Mr. Hiren Sir On 22-03-2024

Dear Sir,

We are thankful to you for your interest in our product and welcome your inquiry.

With reference to your requirement of Transformer, we are pleased to quote


Energy Efficient & Cost effective lowest price for design, manufacturing, testing &
supply of 4000KVA, 11KV/0.800KV ECO, STD & EE “Inverter Duty Transformer
as per IS: 2026 for Solar Project as per following Annexure:

1. Technical Particulars : ANNEXURE – A


2. Accessory and Fittings : ANNEXURE – B
3. List Of Routine Tests : ANNEXURE – C
4. Price, Commercial Terms & Condition : ANNEXURE – D

It is our sincere effort to provide you with a product of Top most quality at very
affordable price. We ensure that, product is tasted as per INDIAN STANDARD
norms.

Thanking you in anticipation.

Yours truly,
For Kay Pee Corporation

Hiren Patel
Mob : +91 88668 34177
Email: info@kaypee.co.in
LEADING MANUFACTURERS OF POWER & DISTRIBUTION TRANSFORMERS
AWARDED BIS CERTIFICATION UPTO 2500 KVA & ISO 9001:2015 UNIT

TECHNICAL PARTICULARS - ANNEXURE “A”

No ITEM Unit PARTICULARS


.
1.01 GENERAL SPECIFICATIONS:
1 Make “KAY PEE”
2 Rated KVA KVA 4000 KVA
Inverter Duty Transformer
3 Service & Duty Continuous, Step Up
Distribution Transformer
4 Type IDT
5 Location Indoor / Outdoor
6 Type of Cooling AN
7 Wound Copper Double Wound
1.02 SYSTEM PARTICULARS:
1 Nominal Voltage (V) V 11000
2 Highest System Voltage (V) V 12000
3 No. of Phases 3
4 Frequency (Hz) Hz 50
5 Voltage Variation ± 10 %
6 Frequency Variation ±3%
7 Combined Voltage and Frequency ± 10 %
variation
1.03 TERMINAL ARRANGEMENT:
1 HV 11KV/250 A Cable Box
2 LV 1.1KV/3150 A Cable Box
3 Orientation of HV & LV 180 Degree
1.04 RATING:
1 Rated Voltage of H.V. (Volts) V 11000
2 Rated Voltage of L.V. (Volts) V 800
3 Rated current of HV (Amps) A 209.95 @ U P F
4 Rated current of LV (Amps) A 2886.66 @ U P F
5 Temperature Rise (in Oil) 50 ºC
6 Temperature Rise (in Winding) 55 ºC
1.05 WINDING CONNECTION DETAILS:
1 Connections:
a. H.V. Winding Delta
b. L.V. Winding Star
c. Neutral brought out for Earthling Yes, Solidly Earthed
d. Shild Between LV & HV Winding
2 Tapings on HV Winding For HV Variation
a. No. of Positions 5 Positions
b. Range ± 5% in steps of 2.50% by OCTC
3 Tap Switch make OFF Circuit Tap Changer
4 Vector Symbol Dyn 11
1 ITEM Unit 4000 KVA 4000 KVA 4000 KVA
(ECO) (STD) (EE)
1 No load losses at rated Watts 4000 2800 3000
frequency and voltage
2 Load losses at rated Watts 35060 28785 20835
current and rated
frequency at 75 ºC
3 % Impedance at 75 ºC at % 6.00 % 6.00 % 6.00 %
normal Tap
4 No Load Current Approx. Less than 2% of full load current
1.0 Efficiency at 75 Degree 4000 KVA 4000 KVA 4000 KVA
7 C@UPF (ECO) (STD) (EE)
a. 100% Full Load % 99.024 99.210 99.404
b. 75% Full Load % 99.407 99.525 99.632
c. 50% Full Load % 99.681 99.750 99.795
d. 25% Full Load % 99.845 99.885 99.892
1.0 Regulation at 75 Degree
7.1 C @ U P F
a. 100% Full Load % 1.053 0.962 0.699
b. 75% Full Load % 0.756 0.676 0.491
c. 50% Full Load % 0.482 0.420 0.305
d. 25% Full Load % 0.279 0.238 0.172

1.0 Efficiency at 75 Degree @ 0.8 P F @ 0.8 P F @ 0.8 P F


8 C @ 0.8 P F
a. 100% Full Load % 98.779 99.013 99.255
b. 75% Full Load % 99.259 99.407 99.540
c. 50% Full Load % 99.601 99.688 99.743
d. 25% Full Load % 99.807 99.856 99.866
1.0 Regulation at 75 Degree @ 0.8 P F @ 0.8 P F @ 0.8 P F
8.1 C @ 0.8 P F
a. 100% Full Load % 4.352 4.885 4.103
b. 75% Full Load % 3.247 3.639 3.058
c. 50% Full Load % 2.154 2.410 2.026
d. 25% Full Load % 1.287 1.438 1.210

2 Maximum efficiency % 33.778% 31.189% 37.948%


(Percentage)

1.09 % RESISTANCE % 0.876 0.719 0.520


1.10 % REACTANCE % 5.936 6.963 5.977
1.11 Power Frequency Apply
1 HV 28 kV
2 LV 3 kV
1.12 Impulse Voltage withstand HV/LV 75 Kv / Nil
1.13 OVERALL DIMENSIONS (Approximate):
Length x Width x Height (ECO) Mm 3685 x 1905 x 2560
Length x Width x Height (STD) Mm 3780 x 1940 x 2585
Length x Width x Height (EE) Mm 3855 x 1965 x 2735
1.14 OVERALL WEIGHT (Approximate):
(ECO) (STD) (EE)
1 Core & Winding Kgs 4179 4621 5607
2 Tank & Fitting Kgs 2500 2450 2250
3 Oil (In Kgs.) Kgs 1620 1755 1935
4 Oil (In Ltrs.) Ltrs 1800 1920 2150
Total Weight Kgs 8400 8900 9900
1.15 I.S. REFERENCE As per IS: 2026
1.16 I.S. TOLERANCE % ± 10 %
1.17 MATERIALS
1 CONDUCTOR E.C. Grade D.P.C. Copper Wire & Strips
2 LAMINATION M4/27/23 (ECO) (STD) (EE)
CG120 HP85 HP80
3 INSULATION “A” Class
4 PAINT Epoxy Quoted Paint
5 OIL POWER OIL (IS-335/1993)
LEADING MANUFACTURERS OF POWER & DISTRIBUTION TRANSFORMERS
AWARDED BIS CERTIFICATION UPTO 2500 KVA & ISO 9001:2015 UNIT

FITTINGS & ACCESSORY - ANNEXURE “B”

No Description Qty

1 Oil conservator complete with plain oil level gauge, filling hole with 1 No
cap and drain Plug.
2 Silica gel dehydrating breather – (for main transformer tank) 1 No
3 Lifting Lugs for Top cover 2 Nos
4 Lifting Lugs for complete Transformer 2 Nos
5 Thermometer Pocket 2 Nos
6 Air release plug for main tank 1 No
7 Top Oil Filter Valve 1 No
8 Bottom Filter cum Drain Valve 1 No
9 Manual Operated OFF Circuit Tap Changer 1 No
10 HV Cable Box (11KV/250A) 1No
11 LV Cable Box (1.1KV,1000A) 1 Nos
12 Additional natural bushing for solid/ NGR Earthing (1KV, 1000A) 1 No
13 Rating and Diagram Plate 1 No
14 Explorer vent with Diagram 1 No
15 Ear thing Terminals 2 Nos
16 Marshalling Box with O.T.I. & W.T.I with Alarm & Trip contact 1 No
17 Buchholz Relay 1 No
18 Pressed Steel Cooling Radiators with air release plug, Lifting lugs and As Per
Required
drain Plug
19 Shield Terminal 1No
LEADING MANUFACTURERS OF POWER & DISTRIBUTION TRANSFORMERS
AWARDED BIS CERTIFICATION UPTO 2500 KVA & ISO 9001:2015 UNIT

LIST OF ROUTINE TESTS - ANNEXURE “C”

Name of Routine Test Unit Ex-Works (Kim) Price

Insulation Resistance (Meger) FREE


Winding Resistance FREE
No Load Losses & Current Measurement FREE
Load Losses & Short Circuit Test FREE
voltage ratio Test FREE
checking of vector Group FREE
Turns Ratio Test FREE
Measurement of Impedance Voltage (DVDF) FREE
Induced Over Voltage Withstand Test FREE
Separate Source Voltage Withstand Test FREE
Oil BDV Test FREE

Note: All above Routine Tests as described in IS: 2026, shall be carried
Out at our works Free of cost. Any Type / Special Tests, if required, shall be
carried out at our works on chargeable basis ONLY.
LEADING MANUFACTURERS OF POWER & DISTRIBUTION TRANSFORMERS
PRICE, COMMERCIAL TERMS & CONDITIONS - ANNEXURE “D”
RATING 4000KVA / 11 / 0.800KV Inverter Duty Transformer
UNIT PRICE INR (ECO) (STD) (EE)
29,78,000=00 36,85,000=00 46,69,000=00
Twenty Nine Lack Thirty Six Lack Eighty Forty Six Lack Sixty
Price In Word Seventy Eight Five Thousand Only Nine Thousand Only
Thousand Only
Extra as applicable. Present rate of GST is @18%. However,
GST
Taxes & Duties prevailing at the time of dispatch will be levied.
PRICE VARIATION FIRM, Till Order execution.
F.O.R. Freight & Transit Insurance to be arranged & paid by Purchaser
PACKING INCLUSIVE (For Domestic Supply only)
Octroi / Entry Tax Extra, if applicable to your Account
a) 40% Advance with Purchase Order
PAYMENT b) Balance with 100% Taxes & Duties against Performa
Invoice prior to Dispatch.
Minimum 4-6 Week after receipt of Purchase Order along with
DELIVERY approved drawings and Advance. However, delivery shall be
agreed upon during finalization of order.
VALIDITY Offer is valid for 7 days from the date of Offer
THIRD PARTY We welcome Third party Inspection and Testing. Expenses for
INSPECTION the same will be borne by you
We also welcome your Testing Engineer for final Inspection &
TESTING
Testing at our works
18 months from the date of dispatch Or 12 month From
WARRANTY Installation with ever is earlier against any manufacturing
defect or poor workmanship only
ACCESSORIES Additional Accessories, require will be charged EXTRA
O.L.T.C. If required, Cost for OLTC will be INR 3.50 Lacs EXTRA.
All Routine Tests as described in IS: 2026 / IS: 11171 shall be carried
ROUTINE TEST out at our works free of cost. Any Type / Special Tests, if required, shall
be carried out at our works on chargeable basis ONLY.
INTEREST & We will issue Inspection call before 7 days of readiness of
STORAGE COST transformer for Routine Tests Inspection at our works. In case,
TOWARDS NON
If you will not organize inspection as per scheduled date &
LIFTING OF
TRANSFORMER time, you will have to make payment immediately failing
IN STIPULATED which, we will charge Interest @24% p.a. plus 1% storage
TIME charges per week from the date of readiness of Transformer.
If the delay cause due to event of Natural Calamities like Earth
quake, cyclone, tsunami, riot, war or any other unforeseen
FORCE
circumstances that may result from an Act of GOD, we are not
MAJEURE
liable for any penalty.
Jurisdiction Subject to S U R AT Jurisdiction