You are on page 1of 3

RENCANA ANGGARAN BIAYA PEMIPAAN

No Uraian Pemipaan Tipe Ukuran


1 Kebutuhan Pipa U-PVC Rucika Standard AW 3/4''
U-PVC Rucika Standard AW 3''
U-PVC Rucika Standard AW 4''

2 Fitting Pipa Elbow AW 3/4'' - 3/4''


Elbow AW 3''- 3''
Elbow AW 4'' - 4''
Tee AW 3/4'' - 3/4''- 3/4''
Tee AW 3''- 3''- 3''
Tee AW 4'' - 4''- 4''

3 Unit Plumbing Tandon


Pompa Air
Closet
Kitchen Sink
Kran
Floor Drain

4 Pipa Tambahan U-PVC Rucika Standard AW 1''


Panjang Jumlah No Uraian Pemipaan
38.9 1 Kebutuhan Pipa
35.3 a. U-PVC Rucika 3/4''
32.3 b. U-PVC Rucika 2''
c. U-PVC Rucika 4''
3
2 2 Fitting Pipa
3 a. Elbow AW 3/4''
3 b. Elbow AW 3'
3 c. Elbow AW 4''
2 d. Tee AW 3/4''
e. Tee AW 2''
1 f. Tee AW 4''
1
3 3 Unit Alat Pemipaan
1 a. Tandon
4 b. Pompa Air
3 c. Closet
d. Kitchen Sink
8 e. Kran
f. Floor Drain
Total Anggaran Biaya Pemipaan+Alat Pemipaa
Panjang(m) / Jumlah bh Harga / m atau bh Total Harga

38.9 Rp 10,675.00 Rp 415,257.50


35.3 Rp 84,000.00 Rp 2,965,200.00
32.3 Rp 108,900.00 Rp 3,517,470.00

3 Rp 2,300.00 Rp 6,900.00
2 Rp 14,100.00 Rp 28,200.00
3 Rp 70,000.00 Rp 210,000.00
3 Rp 3,300.00 Rp 9,900.00
3 Rp 19,500.00 Rp 58,500.00
2 Rp 128,000.00 Rp 256,000.00

1 Rp 1,802,000.00 Rp 1,802,000.00
1 Rp 208,000.00 Rp 208,000.00
3 Rp 750,000.00 Rp 2,250,000.00
1 Rp 708,000.00 Rp 708,000.00
4 Rp 44,100.00 Rp 176,400.00
3 Rp 41,400.00 Rp 124,200.00
Total Anggaran Biaya Pemipaan+Alat Pemipaan Rp 12,736,027.50