Professional Documents
Culture Documents
We started our research on Finding innovative and useful ideas which can help our
us in day-to-day life.
Activity Executed:
As we formed our team, we have started searching on different topics for our
project.
In This week we gone through many topics and selected 3 topics for our project.
None
This week searched for project which can be useful and innovative for upcoming
future.
Activity Executed:
We did some analysis and research on all these topics for a week.
We have done detailed studied on all above topics we find their existing system,
Find the problems from the existing system, features of existing system, etc.
None
Nil
Activity Executed:
After searching for many days, we have finalized the "NGO Portal". The main
objective is to create a centralized platform where all NGOs can come together to
share resources, collaborate on initiatives, and raise awareness of their causes.
Discussions sessions were conducted to define the scope and objectives of the
project.
A need for additional discussions session need to conducted for finalising topic.
Activates Planned: Study about the requirements for the implementation of the
project
This week involved a study of the requirements for implementing the project. We
gathered information on server infrastructure, database management, and
development tools needed for the portal.
Activity Executed:
After finalized the topic we started working on requirements for this type of project.
After completed our research we decided to create our project of Web Application
using Advance Java, html, Css, Java Script, Servlet, JDBC.
No Delay
Nil
Activity Executed:
As we had pretty good idea how to develop this project, we focused on working on
it efficiently.
We started planed layout and the design should be for our webpage.
Searched logo and templates for our web application.
Took help from Google for templates ideas.
Increased communication between team member through online Google meets and
Zoom calls.
Activates Planned: Finalizing the work flow module of the proposed system
This week was dedicated to finalizing the workflow module of the proposed NGO
portal.
Activity Executed:
We drafted a detailed plan for the development process, which included stages such
as design, development, testing, and deployment.
Created DFD Diagram and Entity Relationship Diagram for better understanding
and getting basic ideas of project.
Started gathering information and developing of our modules of our project.
No Delay
Looked for multiple web-based platforms which are similar to our topic.
Activity Executed:
While working on project we decided to look for existing application present but
there wasn’t any platform which resembles our project.
We aim for a platform where multiple NGO connect to each other and work
together for our community.
Expanded the search and reached out to a broader network for platform.
Activates Planned: Working on the multiple platforms for proposed system with
their feasibility
Activity Executed:
As we were creating our 1st module of admin, we were looking for similar websites
for admin, web page for checking whether our web site is similar to that or our
website is more complicated then there website we have done more deeply research
on this.
No Delay
Nil
Activates Planned: Finalization of the platform and all relevant information for the
proposed system
Activity Executed:
After doing research for a week, we then finally finalized our webpage and started
writing information on our webpage.
We also created an admin module side by side.
With database connection we have finally created our 1st module successfully.
In this week we tested our website homepage and admin module
No Delay
Nil
Activity Executed:
In this week we have developed completed all modules, we started integrating them
together.
In this week we have demonstrated our webpage and verified by our Guide for any
changes. As there were no changes, we started working on our project report.
As we integrate all modules together faced some problems with redirecting and data
insertion in Database
Activates Planned:
Activity Executed:
After contacting with our guide and demonstrating our project we started writing
project report.
We created the report and then we have checked the format by our Guide.
No Delay
Nil
Activates Planned:
Activity Executed:
We were informed that there will be the final presentation in this semester.
We created PPT of our progress.
In the PPT we also added screenshot of our work done in all these week, screen shot
like Web page, admin module, database, etc.
No Delay
Nil
We started discussing on the project front end and started creating it.
Activity Executed:
We started our work and started creating our landing page (Main Page Of Our
Website) again means we made some changes in the landing page.
None
None
This week we worked on remaining landing page and started working on our
registration page
Activity Executed:
We started making changes and started working on our login page , registration
page of all Modules
None
None
Activity Executed:
After creating our landing page and login page we started working on our 1st and
main module which is Admin Module as this module was made we had added some
more functionality.
None
None
Activity Executed:
As we have completed our Module 1 then we have shifted to the 2nd Module which
is the main module of our project.
No Delay
Nil
Activity Executed:
As 2nd module which is Ngo module is our main and big module so we where still
on that module.
Increased communication between team member through online Google meets and
Zoom calls.
This week we where on our last module which was user module.
Activity Executed:
We started working on our last module which is User Module as we were almost
done with Ngo and Admin module
No Delay
None
Activity Executed:
As it was last module and this was also little big with many features so was still
working on it.
None
None
Working on testcase.
Activity Executed:
As our project was almost completed and we started working on testing and started
making testcase and excuted it and we also check our project with our project guide.
No Delay
Nil
Activity Executed:
After doing testing we were fixing bugs which was found from testing and after
fixing we started regression testing on it.
No Delay
Nil
Activity Executed:
In this week we have developed our project succesfully and started working on
Black-Book and publishing research papers.
None
None
Activates Planned:
Activity Executed:
After all this we have checked our Black-Book from guide and we where checking
our project is working correctly or not.
No Delay
Nil
Activates Planned:
Activity Executed:
No Delay