Project Dairy Format

Week No: 1st (26/07/2023 - 29/07/2023)

Activates Planned: Working on Search multiple Topics.

We started our research on Finding innovative and useful ideas which can help our
us in day-to-day life.

Activity Executed:

As we formed our team, we have started searching on different topics for our
project.
In This week we gone through many topics and selected 3 topics for our project.

The Topics where-


1. CharityLink: NGO Connection
2. Blockchain based cloud file sharing
3. Cafe Management: Bill Generator

Reason for Delay if any:

None

Corrective measured adopted:

Ensure the project timeline is manageable to avoid delays.

Remarks from Guide:

Signature of Guide :…………………..


Project Dairy Format
Week No: 2nd (02/08/2023 - 05/08/2023)

Activates Planned: Studying the feasibility of the searched topics

This week searched for project which can be useful and innovative for upcoming
future.

Activity Executed:

We did some analysis and research on all these topics for a week.

1. CharityLink : NGO Connection


2. Blockchain based cloud file sharing
3. Cafe Management: Bill Generator

We have done detailed studied on all above topics we find their existing system,
Find the problems from the existing system, features of existing system, etc.

Reason for Delay if any:

None

Corrective measured adopted:

Nil

Remarks from Guide:

Signature of Guide :…………………..


Project Dairy Format
Week No: 3rd (09/08/2023 - 12/08/2023)

Activates Planned: Finalization of the topic

We completed our research and finalized our topic of NGO Portal.

Activity Executed:

After searching for many days, we have finalized the "NGO Portal". The main
objective is to create a centralized platform where all NGOs can come together to
share resources, collaborate on initiatives, and raise awareness of their causes.
Discussions sessions were conducted to define the scope and objectives of the
project.

Reason for Delay if any:

A need for additional discussions session need to conducted for finalising topic.

Corrective measured adopted:

Held team meetings to Finalize the Topic.

Remarks from Guide:

Signature of Guide :…………………..


Project Dairy Format
Week No: 4th (16/08/2023 - 19/08/2023)

Activates Planned: Study about the requirements for the implementation of the
project

This week involved a study of the requirements for implementing the project. We
gathered information on server infrastructure, database management, and
development tools needed for the portal.
Activity Executed:

After finalized the topic we started working on requirements for this type of project.
After completed our research we decided to create our project of Web Application
using Advance Java, html, Css, Java Script, Servlet, JDBC.

Computer Specifications: Windows 11, i5, 4gb Ram, 512 SSD.

Reason for Delay if any:

No Delay

Corrective measured adopted:

Nil

Remarks from Guide:

Signature of Guide :…………………..


Project Dairy Format
Week No: 5th (23/08/2023 - 26/08/2023)

Activates Planned: Working on the gathered requirements

We continued working on gathering the technical and operational requirements for


the portal.

Activity Executed:

As we had pretty good idea how to develop this project, we focused on working on
it efficiently.
We started planed layout and the design should be for our webpage.
Searched logo and templates for our web application.
Took help from Google for templates ideas.

Reason for Delay if any:

Delays in receiving feedback from team members.

Corrective measured adopted:

Increased communication between team member through online Google meets and
Zoom calls.

Remarks from Guide:

Signature of Guide :…………………..


Project Dairy Format
Week No: 6th (02/09/2023 - 06/09/2023)

Activates Planned: Finalizing the work flow module of the proposed system

This week was dedicated to finalizing the workflow module of the proposed NGO
portal.

Activity Executed:

We drafted a detailed plan for the development process, which included stages such
as design, development, testing, and deployment.
Created DFD Diagram and Entity Relationship Diagram for better understanding
and getting basic ideas of project.
Started gathering information and developing of our modules of our project.

Reason for Delay if any:

No Delay

Corrective measured adopted:

Conducted in-depth team discussions to refine the workflow.

Remarks from Guide:

Signature of Guide :…………………..


Project Dairy Format
Week No: 7th (09/09/2023 - 09/09/2023)

Activates Planned: Searching the multiple platforms for proposed system

Looked for multiple web-based platforms which are similar to our topic.

Activity Executed:

While working on project we decided to look for existing application present but
there wasn’t any platform which resembles our project.
We aim for a platform where multiple NGO connect to each other and work
together for our community.

Reason for Delay if any:

Limited availability of suitable platforms.

Corrective measured adopted:

Expanded the search and reached out to a broader network for platform.

Remarks from Guide:

Signature of Guide :…………………..


Project Dairy Format
Week No: 8th (13/09/2023 - 16/09/2023)

Activates Planned: Working on the multiple platforms for proposed system with
their feasibility

Developing 1st module of project.

Activity Executed:

As we were creating our 1st module of admin, we were looking for similar websites
for admin, web page for checking whether our web site is similar to that or our
website is more complicated then there website we have done more deeply research
on this.

Reason for Delay if any:

No Delay

Corrective measured adopted:

Nil

Remarks from Guide:

Signature of Guide :…………………..


Project Dairy Format
Week No: 9th (20/09/2023 - 23/09/2023)

Activates Planned: Finalization of the platform and all relevant information for the
proposed system

Developing 1st Module

Activity Executed:

After doing research for a week, we then finally finalized our webpage and started
writing information on our webpage.
We also created an admin module side by side.
With database connection we have finally created our 1st module successfully.
In this week we tested our website homepage and admin module

Reason for Delay if any:

No Delay

Corrective measured adopted:

Nil

Remarks from Guide:

Signature of Guide :…………………..


Project Dairy Format
Week No: 10th (27/09/2023 - 30/09/2023)

Activates Planned: Gathering & integrating all modules together.

Preparing last module and integrating all modules together.

Activity Executed:

In this week we have developed completed all modules, we started integrating them
together.
In this week we have demonstrated our webpage and verified by our Guide for any
changes. As there were no changes, we started working on our project report.

Reason for Delay if any:

As we integrate all modules together faced some problems with redirecting and data
insertion in Database

Corrective measured adopted:

Integrated modules one by one.

Remarks from Guide:

Signature of Guide :…………………..


Project Dairy Format
Week No: 11th (04/10/2023 - 07/10/2023)

Activates Planned:

Project Report Writing

Activity Executed:

After contacting with our guide and demonstrating our project we started writing
project report.

We created the report and then we have checked the format by our Guide.

Reason for Delay if any:

No Delay

Corrective measured adopted:

Nil

Remarks from Guide:

Signature of Guide :…………………..


Project Dairy Format
Week No: 12th (11/10/2023 - 14/10/2023)

Activates Planned:

Preparing Presentation on work done in 5th Semester

Activity Executed:

We were informed that there will be the final presentation in this semester.
We created PPT of our progress.
In the PPT we also added screenshot of our work done in all these week, screen shot
like Web page, admin module, database, etc.

Reason for Delay if any:

No Delay

Corrective measured adopted:

Nil

Remarks from Guide:

Signature of Guide :…………………..


Project Dairy Format
Week No: 13th (02/01/2024 - 06/01/2024)

Activates Planned: Basic implementation of project

We started discussing on the project front end and started creating it.

Activity Executed:

We started our work and started creating our landing page (Main Page Of Our
Website) again means we made some changes in the landing page.

Reason for Delay if any:

None

Corrective measured adopted:

None

Remarks from Guide:

Signature of Guide :…………………..


Project Dairy Format
Week No: 14th (08/01/2024 - 13/01/2024)

Activates Planned: Started working on the basis of our project

This week we worked on remaining landing page and started working on our
registration page

Activity Executed:

We started making changes and started working on our login page , registration
page of all Modules

Reason for Delay if any:

None

Corrective measured adopted:

None

Remarks from Guide:

Signature of Guide :…………………..


Project Dairy Format
Week No: 15th (15/01/2024 - 20/01/2024)

Activates Planned: Working On Our 1st Module

We started working on our 1st module which is Admin Dashboard.

Activity Executed:

After creating our landing page and login page we started working on our 1st and
main module which is Admin Module as this module was made we had added some
more functionality.

Reason for Delay if any:

None

Corrective measured adopted:

None

Remarks from Guide:

Signature of Guide :…………………..


Project Dairy Format
Week No: 16th (22/01/2024 - 22/01/2024)

Activates Planned: Working on 2nd Module

This week we started working on 2nd Module which is Ngo Module

Activity Executed:

As we have completed our Module 1 then we have shifted to the 2nd Module which
is the main module of our project.

Reason for Delay if any:

No Delay

Corrective measured adopted:

Nil

Remarks from Guide:

Signature of Guide :…………………..


Project Dairy Format
Week No: 17th (29/01/2024 - 03/02/2024)

Activates Planned: Working on 2nd Module

We continued working on 2nd Module

Activity Executed:

As 2nd module which is Ngo module is our main and big module so we where still
on that module.

Reason for Delay if any:

Delays in receiving feedback about the Module from team members.

Corrective measured adopted:

Increased communication between team member through online Google meets and
Zoom calls.

Remarks from Guide:

Signature of Guide :…………………..


Project Dairy Format
Week No: 18th (05/02/2024 - 10/02/2024)

Activates Planned: Working on 3rd and last Module

This week we where on our last module which was user module.

Activity Executed:

We started working on our last module which is User Module as we were almost
done with Ngo and Admin module

Reason for Delay if any:

No Delay

Corrective measured adopted:

None

Remarks from Guide:

Signature of Guide :…………………..


Project Dairy Format
Week No: 19th (20/02/2024 - 24/02/2024)

Activates Planned: Working On 3rd Module.

We were still working on 3rd module which is user module.

Activity Executed:

As it was last module and this was also little big with many features so was still
working on it.

We where done 85% of our project till here.

Reason for Delay if any:

None

Corrective measured adopted:

None

Remarks from Guide:

Signature of Guide :…………………..


Project Dairy Format
Week No: 20th (26/02/2024 - 02/03/2024)

Activates Planned: We started on Testing Part

Working on testcase.

Activity Executed:

As our project was almost completed and we started working on testing and started
making testcase and excuted it and we also check our project with our project guide.

Reason for Delay if any:

No Delay

Corrective measured adopted:

Nil

Remarks from Guide:

Signature of Guide :…………………..


Project Dairy Format
Week No: 21th (04/03/2024 - 09/03/2024)

Activates Planned: Fixing Bugs and Issues

Continued on fixing bugs which where found during testing.

Activity Executed:

After doing testing we were fixing bugs which was found from testing and after
fixing we started regression testing on it.

Reason for Delay if any:

No Delay

Corrective measured adopted:

Nil

Remarks from Guide:

Signature of Guide :…………………..


Project Dairy Format
Week No: 22nd (11/03/2024 - 16/03/2024)

Activates Planned: Documentations.

Working on Black-Book and documentation.

Activity Executed:

In this week we have developed our project succesfully and started working on
Black-Book and publishing research papers.

Reason for Delay if any:

None

Corrective measured adopted:

None

Remarks from Guide:

Signature of Guide :…………………..


Project Dairy Format
Week No: 23rd (11/03/2024 - 16/03/2024)

Activates Planned:

Finding bugs if any and checking our project.

Activity Executed:

After all this we have checked our Black-Book from guide and we where checking
our project is working correctly or not.

Reason for Delay if any:

No Delay

Corrective measured adopted:

Nil

Remarks from Guide:

Signature of Guide :…………………..


Project Dairy Format
Week No: 24th (18/03/2024 - 23/03/2024)

Activates Planned:

Finding bugs if any and checking our project.

Activity Executed:

We where checking our project is working correctly or not.

Reason for Delay if any:

No Delay

Corrective measured adopted:

Nil

Remarks from Guide:

Signature of Guide :…………………..