You are on page 1of 3

M.

Sc PRODUCTION OPTIMIZATION PEE 617


PRESENTATION TIMETABLE
S/NO NAME TOPIC DATE
1. Methuselah PRESENTATION 1: Introduction to Performance 16/04/2024
Caleb Kushi Analysis
Reg No:  Productivity Index:
PGS/23-
 Definition and concept
23/2/M/9325
 Calculation methods and equations

 Inflow Performance Relations (IPR):


 Understanding inflow performance
curves (IPCs)
 Mathematical models for IPR
2. Tajudeen PRESENTATION 2: Advanced Performance Analysis 17/04/2024
Othman
 Inflow Performance Relations (IPR) (contd.):
Reg no:
PGS/22-  Analysis of reservoir behavior using IPR
23/M/11422  Practical applications and limitations
 Outflow Performance Relations (OPR):
 Introduction to OPR
 Types of OPR curves (Vogel's, Fetkovich,
etc.)
3. Ahmad PRESENTATION 3: Outflow Performance Relations 23/04/2024
Balarabe (OPR) and Sizing Tubing
Hamza
 Outflow Performance Relations (OPR) (contd.):
Reg No:
PGS/22-  Derivation and interpretation of OPR
23/2/M/ curves
8611  Application in well performance
optimization
 Sizing Tubing and Flowlines:
 Importance of proper sizing
 Factors influencing tubing and flowline
design

4. Haliru PRESENTATION 4: Design of Oil and Water Handling 24/04/2024


Kawule Facilities
Haliru
 Separators:
Reg No:
PGS/22-  Types of separators (gravity, centrifugal,
23/M/9228 etc.)
 Principles of separation
 Gathering Systems:
 Function and importance of gathering
systems
5. Muru PRESENTATION 5: Design of Gas Handling Facilities 30/04/2024
Yohanna
 Separators (contd.):
Nyankwon
Reg. No:  Design considerations for efficient
PGS/22- separation
23/2/M/8756  Separator sizing and configuration

 Gathering Systems (contd.):


 Design considerations for gathering
systems
6. Bello sadiq PRESENTATION 6: Design of Individual Components - 01/05/2024
dabo Completion Tubing
PGS/22-
 Design of Individual Components of the
23/2/M/8355
Production System:
 Completion Tubing:
 Types of completion tubing
(casing, tubing, liners)
 Design considerations for
completion tubing
7. Salim Tahir PRESENTATION 7: Design of Individual Components - 07/05/2024
Reg no: Chokes and Conclusion
PGS/22-
 Design of Individual Components of the
23/M/8483
Production System (contd.):
 Chokes:
 Role of chokes in production
optimization
 Types of chokes (fixed, adjustable,
variable)
 Choke sizing and selection criteria
8. Rabilu PRESENTATION 8: Recap and Conclusion: 08/05/2024
Mamman
 Review of key concepts
Dankoli
Reg No :  Application of learned principles
PGS/22-  Future directions in production optimization
23/M/8404

You might also like