You are on page 1of 4

Standard Operation Procedure

Title: Measurement Inspection


Reference No.: IED-SOP 018
Effective Date: 01/11/07 Revision No: 001 Pages: Page 1 of 4

Revision Record
Revision Date Revision Details Effective Date
DD/MM/YY No. DD/MM/YY
6.2.1
10/01/08 001 6.2.2 11/01/08
6.2.3

Prepared by Endorsed by Approved by

Signature
Name
Thang Nguyen Duy Quan Le Hong Zainuddin Yasin
Title
Senior Officer Assistant Manager Senior Manager
Date

Copyright in receipt of this document is owned by Regent Garment Factory Ltd. No reproduction of this
document or any part by whatever means is permitted without the prior written consent o f Regent
Garment Factory Ltd. If the control stamp color is not in red, this is an uncontrolled copy. Please refer
only to the controlled copy.
Standard Operation Procedure
Title: Measurement Inspection
Reference No.: IED-SOP 018
Effective Date: 01/11/07 Revision No: 001 Pages: Page 2 of 4

1 Purpose:

To instruct Production Checker, inspector follows strictly 100% measurement inspection procedure in
order to ensure to have an effective checking station and clear identification of defects in checking area
2 Scope:

This procedure will be applied for 100% measurement inspection belong to Production
3 Reference
5s document
Manufacture Order
4 Abbreviation and Definition:

-PDN: Production
- LLD: Line Leader
- P.I.C: Person In Charge
- QAD: Quality Assurance Department
- QC: Quality Control
- CQA: CIMA Quality Assurance
- AQL: Acceptable Quality Level
- SEW: Sewing
- FNS: Finishing
-WIP: Work In Process.
5 Responsibility:
The responsibility of related parties is indicated in the Procedure below
6 Procedure
6.1 - Flow chart:
Standard Operation Procedure
Title: Measurement Inspection
Reference No.: IED-SOP 018
Effective Date: 01/11/07 Revision No: 001 Pages: Page 3 of 4

6.2 - Procedure:

Operation
No Operation Description Requirement P.I.C
Name
All the labor safety required is ready
Check & ensure all the
for working.
preparation ready before
Clean the table and the work station to
start doing the jobs
ensure good working condition.
1 Preparation
-WIP trolley. Checker
Equipment preparation: to ensure -Paper pattern.
enough equipment for working -Report.
-Sticker
The Checkers will take the garment Ensure 100% measurement
after ironing to measure. inspection

Standard The Checkers must follow the standard


operation/ method trained by CQA and WI issued
2 by IED for measurement checking The inspection must ensure Checker
quality
process there are not any defective
requirement
garment pass thru
The passed garment after measurement
will be sent to QA for the audit
according to the AQL required.

Work station Clean table and work station before


cleaning leaving.
3 Ensure 5s concept. Checker
before Put the pattern and equip in upper part
leaving time of the table.
7 Record:
Standard Operation Procedure
Title: Measurement Inspection
Reference No.: IED-SOP 018
Effective Date: 01/11/07 Revision No: 001 Pages: Page 4 of 4

Name of record Retention Responsible Party


Measurement record 6 months FNS