Professional Documents
Culture Documents
Revision Record
Revision Date Revision Details Effective Date
DD/MM/YY No. DD/MM/YY
6.2.1
10/01/08 001 6.2.2 11/01/08
6.2.3
Signature
Name
Thang Nguyen Duy Quan Le Hong Zainuddin Yasin
Title
Senior Officer Assistant Manager Senior Manager
Date
Copyright in receipt of this document is owned by Regent Garment Factory Ltd. No reproduction of this
document or any part by whatever means is permitted without the prior written consent o f Regent
Garment Factory Ltd. If the control stamp color is not in red, this is an uncontrolled copy. Please refer
only to the controlled copy.
Standard Operation Procedure
Title: Measurement Inspection
Reference No.: IED-SOP 018
Effective Date: 01/11/07 Revision No: 001 Pages: Page 2 of 4
1 Purpose:
To instruct Production Checker, inspector follows strictly 100% measurement inspection procedure in
order to ensure to have an effective checking station and clear identification of defects in checking area
2 Scope:
This procedure will be applied for 100% measurement inspection belong to Production
3 Reference
5s document
Manufacture Order
4 Abbreviation and Definition:
-PDN: Production
- LLD: Line Leader
- P.I.C: Person In Charge
- QAD: Quality Assurance Department
- QC: Quality Control
- CQA: CIMA Quality Assurance
- AQL: Acceptable Quality Level
- SEW: Sewing
- FNS: Finishing
-WIP: Work In Process.
5 Responsibility:
The responsibility of related parties is indicated in the Procedure below
6 Procedure
6.1 - Flow chart:
Standard Operation Procedure
Title: Measurement Inspection
Reference No.: IED-SOP 018
Effective Date: 01/11/07 Revision No: 001 Pages: Page 3 of 4
6.2 - Procedure:
Operation
No Operation Description Requirement P.I.C
Name
All the labor safety required is ready
Check & ensure all the
for working.
preparation ready before
Clean the table and the work station to
start doing the jobs
ensure good working condition.
1 Preparation
-WIP trolley. Checker
Equipment preparation: to ensure -Paper pattern.
enough equipment for working -Report.
-Sticker
The Checkers will take the garment Ensure 100% measurement
after ironing to measure. inspection