After confirmation and saving, to check the confirmed order, use coois and then select confi
will have all the confirmed orders w
To cancel the Confirmed order…CO13
For GR
For GR, order must be released. We can make GR of an order without confirmation b
For creatin of GR
To check the list orders whose GR has been created
For Sale order
To create sale order
to Change created sale order
To check list of sale order of specific material
Display Stock/Requirements Si
use MD04
Display Stock/Requirements Si
use MB21
To check stock uploaded
mb52
Code Created
OX15 MHS2
OX02 ZS01
OX16 ZS01 ---MHS2
OX06
OX19
OB45
OB38
OX10 ZS01
OX18 ZS01--ZS01
OX08 P100
OX01 P100--ZS01
OX17 P100--ZS01
OX09 Done
OVX5 S100
OVX3 Done
OVX6
OVXA
OVXD
OVXC
OVXI
OVXK
OVXG
OVX8
oms2
omsk
mmnr
MP1
CP1
opj9 ps1
opkp ps01
scal
os20
os24
ating Material master using mm01
mm01
mm60
mm02
To make BOM
cs01
cs03
cs02
To create work center
Cr01
cr02
To make routing
ca01
ca02
op50
cs11
To make Production order
CO01
using SPRO====Operation====shoop floor====master data====oder
opu3
opkp ps01
opup
release the made production order
opjk
to release order
coois
mb25
n of order…(Only released order will be confirmed)
spro==production==shop floor==operation==confirmation
nfirmtion and click over CO11N option above so it will take you to confirmation screen directly
e coois and then select confirmatino option in the drop down list and enter plant number, so yo
e all the confirmed orders with quantity
For GR
order without confirmation but not more than the quantity assigned in productino order
use MIGO…if period error occures, then use MVPR and MVPP
use MB51
For Sale order
Use VA01
VA02
VA05N
play Stock/Requirements Situation
use MD04
play Stock/Requirements Situation
use MB21
To check stock uploaded
mb52
For material type generation
by SAP standard
fert
HALB
Before making BOM, we have to create material master for that product and relevan
IF there is no storage optin editbale in GR, go to osm2 and tick the valuatino and quanity…the make a new production order
" Account determination Error", occures, follow the below steps…use code OByC
IF there is no storage optin editbale in GR, go to osm2 and tick the valuatino and quanity…the make a new production order
" Account determination Error", occures, follow the below steps…use code OByC
To maintain work scheduling view go to transaction code MM50 & then in selection fields select maintenance status as A (w
material type. After this execute this transaction.
This will lead you to WS view, on work scheduling view maintain the details as needed.
Account Reference
Self generated
fp for finished product fp01 Finished product cement
sf for semi finished sf01 semi finish clinker
RM for raw material rm01 Raw material cement
______________________________
te material master for that product and relevant raw material or semi finished product
and quanity…the make a new production order and check again by posting GR using MIGO….if this time
ByC
and quanity…the make a new production order and check again by posting GR using MIGO….if this time
ByC
lection fields select maintenance status as A (work scheduling, then enter plant no, material no &
as needed.
Valuation classes numerage
FP02 42
SF02 40
RM02 41
Steps of making productin order
After converting planned order into production order through CO40, release that order, GR that order and do goods issuance
Reservation of Inventory by
stricted stock, sales order, consignment stock and
order from location where you have done transfer 1. Execute the transaction MB21.
2. Fill in the fields as needed.
Reservation can be made for consumption for a
use 201 movement (movement type 201), production order (movem
and then Migo transfer (311), sales order, project, network etc
on MB21.
eded.
e for consumption for a cost center
roduction order (movement type 261), stock
er, project, network etc.