Planned Order
It also defines which resources are to be used and how the order costs are to be settled.
Goods Issue
Production orders are used to control production within a company and also to control cost
accounting.
Structure of a Production Order
a) Material a) Production
b) Quantity Dates
Production
Order
a) Operation
a) Costs
b) Capacities
Routing is selected, its operations and sequences are transferred to the order;
BOM are transferred to the order;
Reservations are generated for BOM items held in stock;
Planned costs for the order are generated;
Capacity requirements are generated for the work centers;
Purchase requisitions are generated for non-stock items and externally-processed
operations.
GENERAL
Add quantity
Scrap portion % if any
Add end and start date
ASSIGNMENT
CONTROL
DATES/QUANTITIES
Dates
Quantities – How much delivered, planned order.
MASTER DATA
Routing
BOM
Order release is the basis for further processing of the production order(material withdrwal and so
on). It can be released manually or automatically. We can release an individual operation, a whole
order, or several orders together. STATUS – REL.
Order Creation
Machine Usage
Availability Check
Order Release
- System will revert status from released(REL) to create(CRTD) as we can making changes to the data.
GOODS ISSUE
Material staging is also called as Goods Issue.
Material components must be staged for production in specific quantities and dates.
To do so, we have to go to the proposed warehouse with the material withdrawal
slip and withdraw the material.
GI can be planned or unplanned. Planned – whatever compotent is reversed against
the prod. order. Unplanned – whenever we require extra compotents against a prod.
order.
Material withdrawals can be posted automatically at the time of a
confirmation(backflushing).
Organise
material
Pos
stagging
t
Go
ods
Issu
e
BOM - Item
Material Master
Production Version
Batch Determination
Backflush(Confirmation)
Stock Determination(Goods
Issue Posting)
In work center, we can maintain default storage location(production supply area), when it is
related to the Warehouse management or KANBAN process. CR02-> Basic data tab -> Supply
area.
In BOM, select component, Status/Lng text tab -> Prod.storage loc.
In Material master, MM02 (give component name)-> MRP2 view -> Procurement tab ->prod.
storage location.
In production version, process industry.
In batch determination
In production order header, component overview we can add S.loc.
Picking CO27 – Input profile and prod. order no. and execute, then select all and go to mass
processing and execute or click on picking(add S.loc), save it and refresh.
Note :
Goods issue will happen once confirmation is done.(backflush)
We can issue goods individually through CO11N, provide order no. and then select operation
and save it to confirm.
PRODUCTION ORDER CONFIRMATION CO11N/CO15
GO TO CA02 -> Operation Overview -> Select work center and assign control key as
PP99(maintained milestone).
Order confirmation – CO11N -> order no., operation (select the operation which has
milestone control key assigned). It will automatically confirm the previous operations.
Note
We can also confirm the operation by using confirmation code which can be found in prod.
order operation overview. Select an individual operation, go to details and check
confirmation no. Use the no. in CO11N to confirm prod. order partially.
REQUIREMENT FOR PRODUCTION ORDER CONFIRMATION
PRODUCTION ORDER
OPERATION
CTRL CONFIRMATION
PP01 1 MILESTONE
NORMAL
NO CONFIRMATION
GOODS RECEIPT
When material has been produced, a goods receipt should be posted in the production
order. It makes no difference whether the material is a finished or semi-finished.
Goods receipt from production can be posted either manually or automatically.
Automatic goods receipt can be controlled specific to either operation(operation control
key) or material(production scheduling profile).
If we choose control specific to material, the goods receipt is posted upon confirmation of
the last operation requiring confirmation.
Order status – DLV(delivered)
PSP - Go to spro -> production -> master data -> define psp -> select plant and psp then,
check for settings -> update psp in work scheduling(master data) -> confirm prod. order ->
go to goods movement and check storage, movement type-> save.
If Backflush is active in the MRP 2 tab, then, we don’t need to issue goods through MIGO
(261). Only confirmation is required through CO11N. And then, goods receipt is required for
the movement of finished product to the stock(101).