You are on page 1of 2

Ship’s Name :

Main Engine Failure Drill


Port / Location :
SMS Checklist 8.3.6
Date / Time :

Check the following as applicable, if NO, suitable remarks are to be made in the observation section

Did all personnel muster correctly YES NO


Did the responsible persons report to the bridge YES NO
Was mustering completed in satisfactory time (2-3 min) YES NO
Were all personnel properly dressed YES NO
Were communication between parties satisfactory YES NO
Participants
Participant Name Rank Evaluation Signature Participant Name Rank Evaluation Signature
# #
1 17
2 18
3 19
4 20
5 21
6 22
7 23
8 24
9 25
10 Absence List
11 Name Rank Reason of Absence
#
12
13 1
14 2
15 3
16 4

Time used for the drill (Duration) – Minutes


5–7 7 – 10 10 – 15 15 – 20 20 – 25 25 – 30 30 – 35 35 – 40

Observations

Master Name & Signature : Date :

Main Engine Failure Drill Page 1 of 2


8.3.6 EMERGENCY CHECKLIST - MAIN ENGINE FAILURE

ACTION PERSON CHECK


CALL BRIDGE ENGINEER
CALL CHIEF ENGINEER ENGINEER
CALL MASTER OOW
INSPECT AND EVALUATE PROBLEM C/ENG
CHECK POSITION OOW
EVALUATE VESSELS DANGER MASTER
SEND DISTRESS MASTER
REPORT TO MASTER - IS REPAIR POSSIBLE C/ENG
DISPLAY CORRECT LIGHTS/SHAPES OOW
CAN VESSEL ANCHOR? MASTER
INFORM LOCAL AUTHORITIES MASTER
WARN PASSING TRAFFIC MASTER
INFORM COMPANY MASTER
ARE SPARES ON BOARD - REQUIRED? C/ENG
ARE TUGS AVAILABLE? MASTER
PREPARE FOR EMERGENCY TOWING CH.OFF
IF TIME ALLOWS - CAN COMPANY ARRANGE TOWAGE MASTER
OBTAIN WEATHER FORECAST 0/0/W
CALCULATE LOCAL CURRENT/TIDE/RATE OF DRIFT OOW
MONITOR VESSELS POSITION OOW

Main Engine Failure Drill Page 2 of 2

You might also like