You are on page 1of 1

DI–689

DIAGNOSTICS – AUTOMATIC TRANSMISSION

INSPECTION PROCEDURE

1 Check harness and connector (O/D main switch – body ground)

Wire Harness Side: PREPARATION:


(Connector Front View): Disconnect the O/D main switch connector.
CHECK:
O3 Measure the resistance according to the value(s) in the table
below.
OK:
Tester Connection Specified Condition
1 – Body ground Below 1
D14181

NG Repair or replace the harness or connector


(See page IN–35).

OK

2 Inspect O/D main switch.

Switch Side: CHECK:


(Connector Front View): Measure the resistance according to the value(s) in the table
below.
OK:
O3
Switch Condition Tester Connection Specified Condition
O/D main switch pressed
1–3 Below 1
and held

O/D main switch released 10 k or higher


D14182

NG Replace O/D main switch (See page AT–18).

OK

2005 SEQUOIA (RM1146U)

Author : Date : 883

You might also like