Adani TotalEnergies E-Mobility (ATEEL) is seeking Expression of Interest (EoI) from qualified and
experienced contractors for the Installation and Commissioning works for Electric Vehicle Charging
Stations(EVCS) across India.
Project Overview:
The project involves the installation of EV charging stations on Pan India basis. The successful
contractor will be responsible for civil and electrical work required for installing and commissioning
of EV Charging Stations (EVCS). The Charger and Distribution Panel shall be Free Issue Material
(FIM).
cope of Work:
-Examining site conditions, accessibility, electrical infrastructure, and required permits &
approvals in order to determine the viability of constructing EV Charging Stations.
2. Civil Works:
- Installation of concrete foundations for charging stations and associated equipment as per
engineering drawing.
- Coordination with utility providers for trenching, conduit installation, and cable routing.
- Ensuring compliance with local building codes, safety regulations and other requirements.
3. Electrical Works:
- Wiring and cable routing from the main power source to the charging stations.
-Connecting charging stations to the electrical grid and local power supply.
4. Project Management:
- Efficient project planning, scheduling, and coordination with ATEEL Engineer in charge to ensure
timely completion.
1
Submission Requirements:
Interested contractors are requested to submit an Expression of Interest (EOI) in response to this
notice. The EOI should include the following information:
1. Company Profile:
- Brief description of the company's background, expertise, and experience in executing similar
projects along with past experience in EV Sector.
1. Name of Organization:
2. Number of Employees on role:
3. Number of contractual employees:
4. Turnover in 2022-23:
5. Past Experience in EV:
6. Number of EV stations Setup:
7. Other works with CPO Name (Charge point operators):
8. Locations at which EVCS are setup:
9. Experience in EV bus Station setup:
10. Previous work with ADANI (if any):
11. Dedicated Team for EV (yes/no):
12. Services across (Name of the city/ Pan India):
2
Subject line as: EOI for Site works for installation of EVCS
Note:
This Expression of Interest is not a formal solicitation or tender document. It is intended solely for
the purpose of identifying qualified contractors interested in participating in the site works for EV
charging station installations. The information provided will be used for evaluation and shortlisting
purposes.
We look forward to receiving your Expression of Interest and the opportunity to collaborate on this
project. For any clarifications or inquiries, please contact Mr. Shiv Shankar Kumar at +91
6358914109 or shivshankar.kumar@adani.com or Mr. Kumar Mehta at +91 7043386187 or
mehta.kumar@adani.com .