INITIAL MEETING TO DEFINE SYSTEM REQUIREMENTS 18/09/2023 CREATE PROJECT SCOPE DOCUMENTATION 18/09/2023 VISUAL IDENTITY DEVELOPMENT 21/09/2023 PRESENTATION AND INTIAL REVIEW 26/09/2023 REFINEMENT AND DELIVERY 26/09/2023 IDENTIFY THE SYSTEM’S MAIN RESOURCES 29/09/2023 CREATE PROCESS FLOW DIAGRAMS 29/09/2023 PRIORITIZE REQUIREMENTS BASED ON IMPORTANCE 29/09/2023 FINALIZE REQUIREMENTS DOCUMENTATION 02/10/2023 PREPARE A DETAILED PROJECT PLAN 02/10/2023 BEGIN USER INTERFACE (UI) DESIGN. 04/10/2023 DRAFT DATABASE DESIGN 04/10/2023 IDENTIFY THE TECHNOLOGIES TO BE USED (PROGRAMMING LANGUAGE, DATABASE, ETC.). 04/10/2023 SET UP THE DEVELOPMENT ENVIRONMENT 09/01/2023 DEVELOP THE BASIC STRUCTURE OF THE SYSTEM. 09/10/2023 IMPLEMENT THE DATABASE. 09/10/2023 DEVELOP THE TICKETING FUNCTIONALITY. 23/10/2023 IMPLEMENT THE ABILITY TO CONFIRM RESERVATIONS. 23/10/2023 START WORKING ON THE MANAGEMENT FUNCTIONALITY. 23/10/2023 PERFORM UNIT TESTS 30/10/2023 TEST THE GENERAL FUNCTIONALITY OF THE SYSTEM. 30/10/2023 FIX BUGS AND PROBLEMS IDENTIFIED. 30/10/2023 IMPROVE USER INTERFACE 05/11/2023 ADD SECURITY FEATURES 05/11/2023 PREPARE USER DOCUMENTATION 05/11/2023 PERFORM FINAL QUALITY TESTS 11/11/2023 TRAIN THE SUPPORT AND OPERATIONS TEAM 11/11/2023 IMPLEMENT THE SYSTEM IN A PRODUCTION ENVIRONMENT 11/11/2023 LAUNCH THE SYSTEM FOR PUBLIC USE 17/11/2023 MONITOR SYSTEM PERFORMANCE AND STABILITY 17/11/2023 MAKE ADJUSTMENTS AS NECESSARY 17/11/2023 COLLECT USER FEEDBACK 23/11/2023 MAKE IMPROVEMENTS BASED ON FEEDBACK 23/11/2023 PLAN FOR FUTURE UPDATES AND FEATURES 23/11/2023 DAYS TERMINATION 19/05/2022
PLAN FOR FUTURE UPDATES AND FEATURES
2 20/09/2023 MAKE IMPROVEMENTS BASED ON FEEDBACK 2 20/09/2023 COLLECT USER FEEDBACK 2 20/09/2023 MAKE ADJUSTMENTS AS NECESSARY 4 25/09/2023 MONITOR SYSTEM PERFORMANCE AND STABILITY 1 27/09/2023 LAUNCH THE SYSTEM FOR PUBLIC USE 2 28/09/2023 IMPLEMENT THE SYSTEM IN A PRODUCTION ENVIRONMENT 1 30/09/2023 TRAIN THE SUPPORT AND OPERATIONS TEAM 1 30/09/2023 PERFORM FINAL QUALITY TESTS 1 30/09/2023 PREPARE USER DOCUMENTATION 1 03/10/2023 ADD SECURITY FEATURES 1 03/10/2023 IMPROVE USER INTERFACE 3 07/10/2023 FIX BUGS AND PROBLEMS IDENTIFIED. 3 07/10/2023 TEST THE GENERAL FUNCTIONALITY OF THE SYSTEM. 3 07/10/2023 PERFORM UNIT TESTS 5 14/01/2023 START WORKING ON THE MANAGEMENT FUNCTIONALITY. 5 14/10/2023 IMPLEMENT THE ABILITY TO CONFIRM RESERVATIONS. 5 14/10/2023 DEVELOP THE TICKETING FUNCTIONALITY. 5 28/10/2023 IMPLEMENT THE DATABASE. 5 28/10/2023 DEVELOP THE BASIC STRUCTURE OF THE SYSTEM. 5 28/10/2023 SET UP THE DEVELOPMENT ENVIRONMENT 5 04/11/2023 IDENTIFY THE TECHNOLOGIES TO BE USED (PROGRAMMING LANGUAGE, DATABASE, ETC.). DRAFT DATABASE DESIGN 5 04/11/2023 BEGIN USER INTERFACE (UI) DESIGN. 5 04/11/2023 PREPARE A DETAILED PROJECT PLAN 5 10/11/2023 FINALIZE REQUIREMENTS DOCUMENTATION 5 10/11/2023 PRIORITIZE REQUIREMENTS BASED ON IMPORTANCE 5 10/11/2023 CREATE PROCESS FLOW DIAGRAMS 5 16/11/2023 IDENTIFY THE SYSTEM’S MAIN RESOURCES 5 16/11/2023 REFINEMENT AND DELIVERY 5 16/11/2023 PRESENTATION AND INTIAL REVIEW 5 22/11/2023 VISUAL IDENTITY DEVELOPMENT 5 22/11/2023 CREATE PROJECT SCOPE DOCUMENTATION 5 22/11/2023 INITIAL MEETING TO DEFINE SYSTEM REQUIREMENTS 5 28/11/2023 RESEARCH AND STRATEGY 5 28/11/2023 0 5 28/11/2023 19/05/2022 27/08/2022 05/12/2022 15/03/2023 23/06/2023