Professional Documents
Culture Documents
NEW Fencing Type 1 and Tpe 2
NEW Fencing Type 1 and Tpe 2
150
SWIVEL CLAMP ARC2
1325
FIXED CLAMP ARC1 Ø48.6 x 2.4 x 1.65m
Ø48.6 x 2.4 x 2.0m
3000
TARPULIN SHEET SWIVEL CLAMP ARC2 H-400 x 400 x 13 x 21
75
950
4-Ø10mm x 100mm ANCHOR BOLT
650
150
500
425
435
2000
500
500
1500
VERSION: DATE: DESCRIPTION: DRAWN: EMPLOYER / OWNER: ENGINEER: CONTRACTOR: POSITION: NAME: SIGNATURE: PROJECT TITLE: DATE: 21 MAR 2024
METRO MANILA SUBWAY PROJECT PHASE 1
- 04/01/2024 Issued for Approval RCA PREPARED BY: CADD OPTR. R. CAJAYON SCALE: 1:40 @ A3 SIZE
PACKAGE CP104
A 19/02/2024 Revised As Per the Engineer's Comments RCA
REPUBLIC OF THE PHILIPPINES CHECKED BY: ENG MANAGER Y. TANAKA STATUS: SHOP DRAWING SHEET NO.: 16 OF 16
DEPARTMENT OF TRANSPORTATION
B 21/03/2024 Revised As Per the Engineer's Comments RCA (DOTr) RAILWAY SECTION
DRAWING TITLE:
NOTED BY: CNS MANAGER Y. IWATO DWG. NO.: MMSP-TTMJV-104-SBS-SDG-TP-200465