Project : Palawan Pawnshop - Davao

Location : Pichon St., Davao City

INVESTIGATION REPORT

OBSERVATION AND METHODOLOGY AND DETAILS


FLOOR LEVEL PARTICULAR PHOTOS RECOMMENDATION NOTE
FINDINGS PROCESSING (SHOP DRAWINGS & SPECS)
• Application of
• Re-application of Waterproofing
• Visible traces of leaks (under Waterproofing to prevent the • Direct topping of concrete;
Please see Photo - 1 Please see Section Details
slab) water to percolate or penetrate 2in THK •
into any concrete members Leak test for 48hrs
• Tile installation • Removing and
chipping of existing
UPPER DECK
tiles are not
• QTY of FD base on plan is
Please see Photo - 2 • Replace the floor drain cover necessary
adequate • Provide new sets of FD
cover ; Engr Eduard and Engr
• Floor drain covers are not Please see Section Details
Randy suggested to use the
suitable because of narrow • Conduct maintenance; De-
ROOF DECK Please see Photo - 2 "dome-type" floor drain
passageway the water can't clogging atleast once a week
flow effectively

• Overflow of water • Replace the floor drain • Provide new sets of FD


• The water level rise could be cover • Application of
due to excessive rain • Removing and
• Conduct maintenance; De- Waterproofing
• Insufficient fall - large amount chipping of
LOWER DECK Please see Photo - 2 clogging atleast once a week • Direct topping of concrete; Please see Section Details
of water cannot flow effectively existing tiles are
through the the floor drains
• Proposed re-application of 2in THK •
not necessary
because of its narrow waterproofing and tile Leak test for 48hrs
passageway installation • Tile installation

• Visible traces of leaks • Re-application of


GIRL'S DORMITORY (
(under slab) due to seepage Please see Photo - 5 Waterproofing
COMFORT ROOM )
• Insufficient waterproofing • Tile installation

• Chipping works and


removal of tiles
• Application of
waterproofing
• Leak test for 48hrs
• Conduct maintenance; De-
• Topping of concrete; use
GIRL'S COMFORT clogging atleast once a week
Tile Adhesive (Master Heavy
THIRD FLOOR ROOM NEAR • Slab leaks Please see Photo - 3 • Re-application of
Duty) • Tile
AUDITORIUM Waterproofing
installation
• Tile installation

• Insufficient waterproofing • Re-application of


HALLWAY especially on the termination Please see Photo - 4 Waterproofing
of Auditorium and Hallway • Tile installation

• Re-open the ceiling at


• Repair and Sealed.
auditorium atleast three (3)
AUDITORIUM • Roof leak Determine first the location
access ways to trace up the
of leak source
leak source from the roof
Photo - 1 Photo - 2 SECTION DETAIL

Photo - 3

photo - 5

Photo - 4