FLOOR LEVEL PARTICULAR PHOTOS RECOMMENDATION NOTE FINDINGS PROCESSING (SHOP DRAWINGS & SPECS) • Application of • Re-application of Waterproofing • Visible traces of leaks (under Waterproofing to prevent the • Direct topping of concrete; Please see Photo - 1 Please see Section Details slab) water to percolate or penetrate 2in THK • into any concrete members Leak test for 48hrs • Tile installation • Removing and chipping of existing UPPER DECK tiles are not • QTY of FD base on plan is Please see Photo - 2 • Replace the floor drain cover necessary adequate • Provide new sets of FD cover ; Engr Eduard and Engr • Floor drain covers are not Please see Section Details Randy suggested to use the suitable because of narrow • Conduct maintenance; De- ROOF DECK Please see Photo - 2 "dome-type" floor drain passageway the water can't clogging atleast once a week flow effectively
• Overflow of water • Replace the floor drain • Provide new sets of FD
• The water level rise could be cover • Application of due to excessive rain • Removing and • Conduct maintenance; De- Waterproofing • Insufficient fall - large amount chipping of LOWER DECK Please see Photo - 2 clogging atleast once a week • Direct topping of concrete; Please see Section Details of water cannot flow effectively existing tiles are through the the floor drains • Proposed re-application of 2in THK • not necessary because of its narrow waterproofing and tile Leak test for 48hrs passageway installation • Tile installation
• Visible traces of leaks • Re-application of
GIRL'S DORMITORY ( (under slab) due to seepage Please see Photo - 5 Waterproofing COMFORT ROOM ) • Insufficient waterproofing • Tile installation
• Chipping works and
removal of tiles • Application of waterproofing • Leak test for 48hrs • Conduct maintenance; De- • Topping of concrete; use GIRL'S COMFORT clogging atleast once a week Tile Adhesive (Master Heavy THIRD FLOOR ROOM NEAR • Slab leaks Please see Photo - 3 • Re-application of Duty) • Tile AUDITORIUM Waterproofing installation • Tile installation
• Insufficient waterproofing • Re-application of
HALLWAY especially on the termination Please see Photo - 4 Waterproofing of Auditorium and Hallway • Tile installation
• Re-open the ceiling at
• Repair and Sealed. auditorium atleast three (3) AUDITORIUM • Roof leak Determine first the location access ways to trace up the of leak source leak source from the roof Photo - 1 Photo - 2 SECTION DETAIL