Name of MS
Method Statement for Tie-In (Shut Down) Activities
Method Statement for Fabrication and Erection of CRA and High Alloy steel Piping
Method Statement for Fabrication and Erection of carbon steel Piping
Method Statement for Bolt Torquing and Tensioning
Method Statement for A/G and U/G Pipeline Construction Works
Method Statement for Leak Test of Piping System
Method Statement for Wellhead Tie-in Works
Method statement for wellhead piping hydrotest
Method Statement for Demolition Works
Method Statement for Cleaning, Gauging,Hydro Testing and Drying for New Pipelines
Method Statement for UV Protection of Coated Surface for A/G Pipeline Crossing
MS for surface preparation and painting of new piping and structural works
MS for Field Joint Coating and holiday testing of new pipelines
MS for Installation of Chemical injection Package
MS for Installation of Demulsifier Package
MS for Installation of CO2 vent stack.
MS for Installation of Test Separator
hydrostatic testing procedure for pipeline
MS for Hot tapping work
MS for NDT Works
MS for steel stuctural fabrication and erection works
Referance 1
Tie in works.pdf
Piping.pdf
Hydralick bolt torking.docx
Pipe line construction activity.pdf
procudure
Referance 4 New
S no
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
Name of MS
Method Statement for Tie-In (Shut Down) Activities
Method Statement for Fabrication and Erection of CRA and High Alloy steel Piping
Method Statement for Fabrication and Erection of carbon steel Piping
Method Statement for Bolt Torquing and Tensioning
Method Statement for A/G and U/G Pipeline Construction Works
Method Statement for Leak Test of Piping System
Method Statement for Wellhead Tie-in Works
Method statement for wellhead piping hydrotest
Method Statement for Demolition Works
Method Statement for Cleaning, Gauging,Hydro Testing and Drying for New Pipelines
Method Statement for UV Protection of Coated Surface for A/G Pipeline Crossing
MS for surface preparation and painting of new piping and structural works
MS for Field Joint Coating and holiday testing of new pipelines
MS for Installation of Chemical injection Package
MS for Installation of Demulsifier Package
MS for Installation of CO2 vent stack.
MS for Installation of Test Separator
MS for Hot tapping work
MS for NDT Works
MS for steel stuctural fabrication and erection works
MS for lifting over live line
Remarks Status
Tie in list need pending
Referance doc need pending
Done
Done
Done
to be done pending
Tie in list need
Done
Done
Pankaj
Referance doc need
Done
to be done
Referance doc need
Done
to be done
Done
Referance doc need pending
Om prakash pending