STRUCTURAL STORAGE SHED ABOVE IRON ORE & PELLET STOCKYARD

PROJECT NAME :
BAHRAIN STEEL PROJECT
TO : THE ENGINEER : Kind attention : Mr. Rami Sawaya
FROM : THE CONTRACTOR : AL NAMAL CONTRACTING & TRADING Co. W.L.L.

INSPECTION REQUEST IR
IR No. IR-CW-0112 Revision No R0 Date 04/12/2023 Discipline civil
REQUEST FOR INSPECTION OF PILECAP STEEL REINFORCEMENT ,ANCHOR BOLT AND
Description SHUTTERING AND CONCRETE FOR PILE CAP AT GRID
LOCATION - 101-100’/E & D ,DRAWING : ST-101 REV C ,ST-107 REV A ,ST-105 REV C
Inspection Date 05/12/2023 Time 3.30 P.M
We have the pleasure to request inspection for the work stated hereunder and confirm that all necessary works have been
satisfactorily completed under the terms of the contract and provided as required in the Drawings and specifications.
Sub contractor : Quality Engineering EPC contractor: EPC contractor:
Name : Name : Devamalya De Name : Anwar Sadath
Designation: Designation: PM Designation: Head QA/QC
Signature: Signature: Signature:
A CLASS CRPEP CONSULTANT- ISMAIL KHONJI ASSOCIATES (IKA)
Comments Approval status
___________________________________________________ A Approved ,no comments
___________________________________________________ B Approved with comments
___________________________________________________ C Revise and resubmit
___________________________________________________ D Rejected

Name:______________________ Position________________ Signature:___________________ Date :_____________


KIRBY PEB CONTRACTOR & SYME MECHANICAL THIRD PARTY TESTING AND INSPECTION
CONTRACTING W.L.L ORGANISATION- BUREAU VERITAS (BV)
comments Comments Approval status
___________________________________ __________________________ Approved ,no
___________________________________ __________________________
A comments
___________________________________ __________________________ B
Approved with
comments
___________________________________ __________________________ Revise and
___________________________________ C
resubmit
___________________________________ Name:______________________ D Rejected
Position______________
Name:______________________ Date:____________
Signature:_____________ Date__________
Position______________ Signature:_____________

CLIENT BAHRAIN STEEL BSC (C) (EC) ANSARI ENGINEERING SERVICES W.L.L
Comments:

NAME NAME
POSITION POSITION
DATE DATE
SIGNATURE SIGNATURE
DG JONES AND PARTNERS MIDDLE EAST W.L.L
Comments:
A Approved ,No comments
_______________________________________________________ B Approved with Comments
_______________________________________________________ C Revise and resubmit
_______________________________________________________ D Rejected
_______________________________________________________

NAME POSITION DATE SIGNATURE


Mr. Rami Sawaya Head Of Department-Project Management

Note : This review/approval does not relieve the contractor from his obligation to verify and execute the work according to the
requirements of the contract terms and conditions