MINUTES OF MEETING- ( Tower-1 )

Project- Manbhum AGBTL


Attendance:
Manbhum - Mr. Joydeep Sir ( MD ) ; Mr . Vekata Subba Raju Sir ( GM ) ; Mr. Srinivas ( PM ) ; Mr . Ambadas ( PM )
RTS - Mr. Vijay ( PM )
S.no
1
2
3
4
5
6
7
8
MINUTES OF MEETING- ( Tower-1 )

Project- Manbhum AGBTL


Attendance:
Manbhum - Mr. Joydeep Sir ( MD ) ; Mr . Vekata Subba Raju Sir ( GM ) ; Mr. Srinivas ( PM ) ; Mr . Ambadas ( PM )
RTS - Mr. Vijay ( PM )
Description
Pour-4 ( beside pour-1 / podium ) first slab concrete casting.
Pou-3 ( besidde pour-2 / podium) first slab concrete casting.
Pour-1 & 4 second slab concrete casting. ( 4.5 mtr height )
Pour-2 & 3 second slab concrete casting.( 4.5 mtr height )
Stilt & basement lvl block work starting from 03.04.24.
Tower crane will be repaired before 03.04.24
Pour-1 second slab concrete casting. ( flat no. 7 & 8 )
Removal of tower crane.
Note : Please prepare & send micro schedule for above commited works on 02.04.24.
er-1 )

Date : 01.04.2024

Instructed BY Action By Target date Remarks


Manbhum RTS 06.04.24
Manbhum RTS 13.04.24
Manbhum RTS 20.04.24
Mabhum RTS 30.04.24
Manbhum RTS 30.04.24
Manbhum RTS 03.04.24
Manbhum RTS 30.04.24
Manbhum RTS 30.04.24
mmited works on 02.04.24.