Architectural Structures – Mini Project | Week No.

1 and 2

Architecture Structures
Submitted To- Er. Neha Singh
Team Members- 1. Abhishek Tripathi

2. Shuja Ahmed

3. Srishtika Pal (Group Leader)

4. Shalini Singh

5. Nidhi Singh

6. Tara Bharti

7. Kaustubh

8. Gaurangi

9. Arnav

Instructions-
Week 1 :-
1. Select a site on Map (using aerial photogrammetric concept taught in
First year survey). Elaborating its surroundings and explaining
Architectural, geographical or any other feature of the selected site.
Site can be chosen anywhere on the globe.
2. Take any dimension of plot.
3. Draw a 1BHK house layout for it on AutoCAD.
4. Draw a 3D diagram of house using any architectural software.
Week 2 :-
Drawing 3D Diagrams of-
1. Showing beams
2. Slabs
3. Column
4. Type of foundation
5. Dimensions not necessary but understanding where to put beams, slabs etc
is required.
6. You can show it in one diagram or different diagrams.
7. Nomenclature of each structural element like beam 1, beam 2, slab 1
,column 1, Footing 1 etc.

Team No. 6 |1
Architectural Structures – Mini Project | Week No.1 and 2

INDEX
Week 1
1. Details of site location…………………………………………………………………………………………….…………….3

2. Geographical features…………………………………………………………………………………………………………..4

3. Plan Layout……………………………………………………………….………………………………………………………..…6

4. Elevation………………………………………………………………...…………………………………………………………….8

5. Placement of Columns………………………………………………..………………………………………………………..9

6. 3 D – diagram of house ……………………………………………….……………………………………………..………11

Week 2
1. Placement of walls, W1,W2,W3 …………………………..…………………………………………….……………13

2. Placement of slabs, S1,S2,S3… ……………………….…………………………………………………………………..15

3. Placement of beams, B1,B2,B3... ……………………………………………………………………….……….………17

4. Excavation Plan ……………………………………………………………………………....19

5. Placement of Footing …………………………………………….…………………………………………………….…….20

6. Placement of Plinth Beam …. ………………..……………………………………………………………………………21

7. Placement of Major Beams………………………………………………………………………………………..……….22

8. Dimensions of Columns, Beams, Footings and Slabs…..……………………………………………………….23

9. 3D-View …………………………………………………………………………………………………………………………….27

Team No. 6 |2
Architectural Structures – Mini Project | Week No.1 and 2

1. Details of Site Location – :-


Location :- Elm St, Dunbar, West Virginia 25064, USA.

Coordinates :- 32022’42.O”N 81045’51.7”W

Type :- Residential House

Team No. 6 |3
Architectural Structures – Mini Project | Week No.1 and 2

Geographical specifications-

Dunbar is located at 38021’52.O”N 81044’22”W (38.364319,


-81.739539). Dunbar is served by Interstate 64 and WV 25.
According to the United States Census Bureau, the city has total area of

2.81 sq. miles (7.28 km2), of which 2.80 sq. miles(7.25 km2) is land and

0.01 sq. miles (0.03 km2) is water.

1. Plot size :- 30x70 m2

2. Mean sea Level :-


The mean sea level of the state of West Virginia is about
1500 feet.

3. Type of Climate :-

 West Virginia has a humid subtropical climate with warm summers and cold
winters.

 Summers are hot and humid, but the temperatures rarely go above 95°F (35°C).

 Winter is the worst time to visit West Virginia as the weather is cold,
and temperatures are below freezing.

4. Earthquake Zone :-

The Virginia Seismic Zone in the U.S. state of Virginia covers about
8,000 square kilometers (3,100 sq mi) in the Piedmont province.
Earthquakes in the state are irregular and rarely reach over 4.5 in
magnitude.

5. Average wind speed :-

The average wind speeds in this region is between 6 and 12 miles per hour.

6. Average precipitation :-

The precipitation in this region is about 144.5 to 106.2 days.

7. Average snowfall :-

The snowfall in this region is about 32.8 in. to 27.8 in. .


Team No. 6 |4
Architectural Structures – Mini Project | Week No.1 and 2

8. Type of soil :-

Monongahela Silt Loam Soil –


The Monongahela series was first established in Greene County,
Pennsylvania in 1921 but occurs in West Virginia, Painting honoring the
Virginia, Tennessee, Pennsylvania, Ohio, Maryland, Ken- state soil designation.
Credit, tucky, and Alabama. The series was names for the Moron- Pediamrgi
gahela River, which drains Green county and much of north-central West
Virginia. The name "Monongahela" is derived from a Native American word
meaning "high banks or bluffs, breaking off and falling down in places" in
reference to the instability of the river's banks. These very deep, moderately well
drained soils are found on alluvial stream terraces in river valleys that are not
flooded.

9. Presence of architectural building :-

1. West Virginia ‘penitentiary’ distance from our site is 112 miles.


_Ar. Richard Snowden Andrew.

2. ‘The greenbrier’ distance from our site is 157 miles.


_Ar. John , H.B. Latrobe.

Team No. 6 |5
Architectural Structures – Mini Project | Week No.1 and 2

 Layout Plan –

Team No. 6 |6
Architectural Structures – Mini Project | Week No.1 and 2

 Layout Plan (Terrace) :-

Team No. 6 |7
Architectural Structures – Mini Project | Week No.1 and 2

 Elevation :-
Architectural Structures – Mini Project | Week No.1 and 2

 Placement of columns :-

Team No. 6 |9
Architectural Structures – Mini Project | Week No.1 and 2

 Placement of columns (Terrace):-

Team No. 6 |10


Architectural Structures – Mini Project | Week No.1 and 2

 3D – diagram of house :-

Team No. 6 |11


Architectural Structures – Mini Project | Week No.1 and 2

Team No. 6 |12


Architectural Structures – Mini Project | Week No.1 and 2

 Placement of walls, W1,W2,W3….

Team No. 6 |13


Architectural Structures – Mini Project | Week No.1 and 2

 Placement of walls (Terrace) :-

Team No. 6 |14


Architectural Structures – Mini Project | Week No.1 and 2

 Placement of slabs, S1,S2,S3…:-

Team No. 6 |15


Architectural Structures – Mini Project | Week No.1 and 2

 Placement of slabs (Terrace) :-

Team No. 6 |16


Architectural Structures – Mini Project | Week No.1 and 2

 Placement of beams, B1,B2,B3 :-

Team No. 6 |17


Architectural Structures – Mini Project | Week No.1 and 2

 Placement of beams (Terrace) :-

Team No. 6 |18


Architectural Structures – Mini Project | Week No.1 and 2

 Excavation Plan :-

Team No. 6 |19


Architectural Structures – Mini Project | Week No.1 and 2

 Placement of footing, F1, F2,F3,F4 :-

Team No. 6 |20


Architectural Structures – Mini Project | Week No.1 and 2

 Placement of Plinth Beam :-

Team No. 6 |21


Architectural Structures – Mini Project | Week No.1 and 2

 Placement of Major Beams :-

Team No. 6 |22


Architectural Structures – Mini Project | Week No.1 and 2

 Dimensions of Columns, Beams and Footing :-

 Columns :-

COLUMNS BREADTH DEPTH

C1 230mm 300mm

C2 230mm 300mm

C3 230mm 300mm

C4 230mm 300mm

C5 230mm 300mm
C6 230mm 300mm

C7 230mm 300mm
C8 230mm 300mm
C9 230mm 300mm

C10 230mm 300mm


C11 230mm 300mm

C12 230mm 300mm

C13 230mm 300mm


C14 230mm 300mm

C15 230mm 300mm

C16 230mm 300mm

C17 230mm 300mm

C18 230mm 300mm

C19 230mm 300mm


C20 230mm 300mm

C21 230mm 300mm

Team No. 6 |23


Architectural Structures – Mini Project | Week No.1 and 2

 Beams :-

MAJOR BEAMS MAJOR BREADT DEPTH LENGT LENGTH BEAM


NO. BEAMS H (mm) H (mm) TYPE
CONTAIN (mm) (mm)
S NO.
MB1 B7 230mm 300mm 15875mm 1220mm Continuous
B9 230mm 300mm 3480mm Continuous
B13 230mm 300mm 3430mm Continuous
B20 230mm 300mm 3930mm Continuous
B25 230mm 300mm 3815mm Continuous
MB2 B11 230mm 300mm 16568mm 3250mm Continuous
B16 230mm 300mm 3660mm Continuous
B22 230mm 300mm 3930mm Continuous
B27 230mm 300mm 3815mmm Continuous
B33 230mm 300mm 1913mm Continuous
MB3 B28 230mm 300mm 8684mm 4273mm Continuous
B29 230mm 300mm 2042mm Continuous
B30 230mm 300mm 2833mm Continuous
MB4 B23 230mm 300mm 8684mm 4573mm Continuous
B24 230mm 300mm 4674mm Continuous
MB5 B17 230mm 300mm 8684mm 3661mm Continuous
B18 230mm 300mm 2769mm Continuous
B19 230mm 300mm 2717mm Continuous
MB6 B4 230mm 300mm 8684mm 3661mm Continuous
B5 230mm 300mm 2769mm Continuous
B6 230mm 300mm 2715mm Continuous
MB7 B2 230mm 300mm 3660mm Continuous
B3 230mm 300mm 8684mm 5484mm Continuous
MB8 B8 230mm 300mm 7900mm 1450mm Continuous
B10 230mm 300mm 3250mm Continuous
B14 230mm 300mm 3731mm Continuous
MB9 B15 230mm 300mm 7130mm 3660mm Continuous
B21 4000mm Continuous
MB10 B26 230mm 300mm 3585mm 4045mm Continuous
MB11 B31 230mm 300mm 2600mm 3133mm Continuous
MB12 B32 230mm 300mm 1682mm 1913mm Continuous
MB13 B12 230mm 300mm 2485mm 2485mm Continuous

Team No. 6 |24


Architectural Structures – Mini Project | Week No.1 and 2

 Footings :-

FOOTING LENGTH BREADTH TYPE

F1 900mm 900mm Eccentric

F2 900mm 900mm Eccentric

F3 1370mm 1000mm Eccentric

F4 1200mm 1200mm Isolated

F5 1370mm 1000mm Eccentric

F6 1370mm 1000mm Eccentric

F7 1200mm 1200mm Isolated

F8 1200mm 1200mm Isolated

F9 1370mm 1000mm Eccentric

F10 1370mm 1000mm Eccentric

F11 1200mm 1200mm Isolated

F12 1200mm 1200mm Isolated

F13 1370mm 1000mm Eccentric

F14 1370mm 1000mm Eccentric

F15 1200mm 1200mm Isolated

F16 1370mm 1000mm Eccentric


F17 1370mm 1000mm Eccentric
F18 1200mm 1200mm Isolated

F19 1370mmm 1000mm Eccentric


F20 1370mm 1000mm Eccentric

F21 1370mm 1000mm Eccentric

Team No. 6 |25


Architectural Structures – Mini Project | Week No.1 and 2

 Slabs :-

SLABS NO. LENGTH(mm) BREADTH(mm) DEPTH(mm) TYPE(mm)

S1 3200mm 900mm 150mm Two was Slab

S2 9000mm 3500mm 150mm One way slab

S3 5139mm 3200mm 150mm Two way slab

S4 9000mm 3700mm 150mm One way slab

S5 9000mm 3700mm 150mm One way slab

S6 2600mm 1700mm 150mm Two way slab

S7 3200mm 3200mm 150mm Two way slab

Team No. 6 |26


Architectural Structures – Mini Project | Week No.1 and 2

 3D – View :-

Team No. 6 |27


Architectural Structures – Mini Project | Week No.1 and 2

Team No. 6 |28


Architectural Structures – Mini Project | Week No.1 and 2

Team No. 6 |29