ITEM DOMINAN

VOLUME HARGA SATUAN JUMLAH HARGA


NO URAIAN PEKERJAAN SAT KETERANGAN
LOT A LOT B LOT A LOT B (Rp) (Rp)

I DIVISI 1. UMUM - - -
II DIVISI 2. DRAINASE
III DIVISI 3. PEKERJAAN TANAH & GEOSINTETIK
Common Excavation m3 202.399,99 474.069,43
Soft Rock Excavation m3 316.815,56 1.325.727,14
Rock Excavation m3 1.208.029,78 523.734,73
Common Embankment from Excavation m3 540.299,45 799.306,75
Grade Preparation m2 68.953,68 29.212,47
Clearing and Grubbing m2 68.953,68 4.403,85
VI DIVISI 7. STRUKTUR

Page 1 of 1