Field Operator:
Area 1 Merox compressors, Vessels, Columns, Date:
Shift:
Reactors and Tanks
Day / Night

Activity Frequency Action Guideline Remark


ECP (V-8308)
Normal level is expected at 3rd skimming
Yes No
nozzle. The skimming should be conducted
Skimming Operation 1/Shift
for few seconds until all the emulsions are
f
Side Glass Level removed

ECP Voltage 1/Shift Maintain 32-36 kV

Check Amps reading 1/Shift Amps should be less than < 3mAmp
Visual Check of Kerose at the
1/Shift Should be bright and clear
outlet of ECP (V-8308)
Analyze %spent in caustic 1/Shift, maintain <
Adjust Caustic injection rate 1/Shift 20-30%. For 1% drop in tank T-8301 level,
caustic injection rate is ~2.5 TPD

Caustic Concentration 1/Shift Maintain 2-3Be


Reactor (R-8301/02)
Check top vent for air 1/Shift Rector 1 Rector 2 Release any air from top vent of each rector
To avoid plugging of drain. Open for drain for
Drain Rx bottom 1/Shift Rector 1 Rector 2
few seconds and close it back.
Conduct caustic saturation one reactor at a
time. Change out water wash before reactor
Caustic Circulation 2/Week Rector 1 Rector 2 caustic alkalinization and maintain water
effluent pH < 12. Caustic injection rate for
one reactor is 50 TPD for 1 hour duration

Air Injection 1/Shift T/D Adjust based on feed rate and feed RSH

Start with 15-20wppm of Merox plus


Merox Plus Injection 1/Shift Pump Strok injection wrt feed rate. Towards catalyst end
of life, increase to 35-40wppm
Drain and flush PDT tubing of both reactors.
1/(Mondy Due to long instrument tubing, some heavy
PDT flushing Rector 1 Rector 2
Morning) material can get accumulated and lead to
incorrect instrument reading
Water Wash (C-8302)

Done Not Done Operate Water level at 2nd skimming nozzle


i.e. 50% LT-2068 reading. Open skimming
Skimming Operation 1/Shift
Emulation Presence: nozzles for few seconds until emulsions are
Yes No removed and close it back

Check pH in field on water


1/Shift pH Maintain pH< 12
effluent
Maintain slow draining and slow injection
rate to minimize unit fluctuations. Target ~45-
60 minutes for water injection from 0% to
Water Wash water change out 1/Shift Yes No
50% level. During water injection time, open
PCV-2302 bypass to control the opening to
~50-60% to minimize the unit fluctuations.
Salt Drier (V-8310)
Brine Draining 1/Shift Yes No Report Color of Drain
Visual Check of Kerosene at
1/Shift Should be bright and clear
the Salt Drier outlet
Clay Filter (V-8311)
Visual Check of Kerosene at
1/Shift Should be bright and clear
the Clay outlet

Name of Shift Team Leader Name of Field Operator


Signature Signature