PPM CHECKLIST: Potential Doc No:

Transformer/Capacitive Voltage Rev No:


Transformer/ Inductive Voltage Date:
Transformer Page 1 of 1

Plant Name : 250 MW MRPL ISTS-1, BAP, RJ


Equipment ID :
Date :
Equipment Name : Potential Transformer (PT) &
(Capacitive Voltage Transformer)
Location :
Frequency :

Sr.
Maintenance Checklist points Frequency
No Status
1 Oil Level Daily
2 Visual Inspection Daily
3 Connection Tightening Quarterly
4 Terminal Cover Sealing Yearly
Cleaning of Bushing of PT (Bushing cleaning cycle will be yearly Yearly / Half
5
for 220 KV side and Half yearly for 33 KV side) Yearly
6 Capacitance and Tan Delta Testing (220 KV side) Yearly
7 Winding resistance Testing Yearly
8 Secondary core Continuity Test Yearly
9 Measurement of Insulation Resistance Value Yearly
10 Measurement of PT / CVT/ IVT Ratio Yearly
11 Measurement of CT Knee Point Voltage (220 KV side) Yearly
12 Capacitance and Tan Delta Testing (220 KV side) Yearly
Cleaning and tightness of PT/CVT/IVT secondary terminals and
Yearly / Half
14 checking healthiness of sec terminal bushing. (Yearly for 220 KV
Yearly
side and Half yearly for 33 KV side)
Check for any oil leakage from Secondary Terminal Box in case
Yearly / Half
15 of oil filled PT/CVT/IVT (Yearly for 220 KV side and Half yearly
Yearly
for 33 KV side)
Observations/Suggestions:

Spares Replaced / Required Quantity

PPM Carried Out By : Supervisor Site Eng.


MTPL O&M MTPL O&M MTPL