You are on page 1of 6

TEST REPORT FOR H.T.METERING SERVICE M&P: MLG MF is 0.

5 for all
SOUTHERN POWER DISTRIBUTION COMPANY OF TELANGANA LIMITED
Operation Division: Devarakonda Date & Time of testing: 20.07.2020
Operation Sub-Division: Devarakonda Section: Devarakonda Distribution: Mynampally
Name of the M&P Sub-Division: Miryalaguda
Purpose of testing: Periodical, New Service/Perioidcal/CTPT change/Meter Change
Purpose: Replacement of defective CTPT set as per the instructions of ADE/DPE/HT.
General:
SC NO: 4226400413 Actual Supply Voltage: 11KV
Category: LTIII CMD: 99 HP Specified Supply Voltage: 11KV
Purpose of Supply: Connected Load: -
Name & Address of the consumer: Nature of premises:
M/s. Sai Krishna Industries Continuous/Non Continuous: Continuous
Devarakonda Meter Location: Inside/Outside the Premises: Inside
Dedicated or Not: Not
Whether all metering equipment as per the department guidelines or not: Yes
Metering: Indoor/Outdoor: Outdoor Seasonal or not: Not seasonal
Date of last periodical testing by M&P: - Govt/Private: Private
(A) Meter Particulars:
OLD/ Existing Particalurs New
Secure Make
TSS02346 Sl.No.
E3MO24 Type
Integraion Period
0.2s Class of Accuracy
20/5A CT Ratio
11KV/110V PT Ratio
KWH KWH/MWH
(B) CTPT Details:
OLD/ Existing Particalurs New
vidyuth control system Make NIK-SAN
8421 Sl.No. NEC-369-492
Semi-Open Type Semi-Open
CT/PT Burden 5VA-10VA
11KV/110V PT Ratio 11KV/110V
10/5A Available CT Ratio 10/5A
3Ph-4W 3P3W/3P4W 3Ph-4W
10/5A Connected CT Ratio 10/5A
0.2s Class of Accuracy 0.2s
C. Transformer Details:
Make:- Sl.No: - Capacity:- KVA
MFG:- Voltage Ratio:
d Ratio Test: CT Ratio
R-Ph Y-Ph B-Ph
Primary Current - - -
Secondary current - - -
e Polarity Test: CTs
R-Ph Y-Ph B-Ph
In F.D In R.D In F.D In R.D In F.D In R.D
rn - - - - - -
yn - - - - - -
bn - - - - - -
f PTs:
ry yb br
Ry - - -
Yb - - -
Br - - -

(F) Volatages:
In Meter At TTB At T/F LT Side
Vrn 6.11 IR 3.2 VRY 10.6 VRN 6.3 IR 3.1 VRN - IR -
Vyn 6.18 IY 3.3 VYB 10.7 VYN 6.2 IY 3.2 VYN - IY -
Vbn 6.16 IB 3.6 VBR 10.5 VBN 6.1 IB 3.5 VBN - IB -
(G): Testing:
Standard Kit used: Make: ZERA Sl.No: 050039192
Date of Calibration testing at NABL Lab:
Class of accuracy of testing kit: 0.02
1 ERS test (on consumer load) 2. ERS Display Parameters:
Meter Constant: R R
Number of Pulses: Y Y
KWH KVARH B B
-0.06 0.02 Total KW: Avg PF:
% Error 0.11 -0.20 Total KVAR: Freq:
-0.14 0.06 Total KVA:
(H) Readings:
Initial readings Parameters Final readings
(before TTB opened) (After screws loose and TTB sealed
KWH 167054
KVAH 167399
KVARH(lg) 1016
KVARH(ld) 1226562
KVA(MD) 0
Bills / Resets 74
CMD 3378.8
KVAH C1 --
KVAH C2 --
KVAH C3 --
KVAH C4 --
KVAH C5 --
KVAH C6 --
TOD KVA R1 --
TOD KVA R2 --
TOD KVA R3 --
TOD KVA R4 --
TOD KVA R5 --
TOD KVA R6 --
MF 0.5
(I). Seals Placed:-
Impression on seals before Condition of seal and Location of seals Impression on seal and
the inspection sealing wire seals nos after inspection
CT PT Set inspection cover AG506320,21 BPS
CT PT Set tank cover AG506322,23 BPS
AG506351,52,
X55333,34,35,36 BPS CT PT set secondary terminal cover
53,54 BPS

X553337,38 CT PT set incoming cables AG506324,25 BPS


Meter Board fixing
MC
MTC
MD
MRI
AJ548846,47 RPS TTB AG506355,56 BPS
AJ548848 RPS Box AG506357 BPS
AB Switch
Remarks:-
1. The Defective CTPT replaced with new of same ratio.
2. Meter tested in series with consumer load, its performance found satisfactory
3. No change in MF, MF is 0.5 for all

Sd/- Sd/- Sd/- Sd/-


Consumer AE/Opn/ DE/ADE/Opn/ ADE/M&P/MLG
Copy Submitted to:
The Divisional Engineer/DPE/HT-I/TSSPDCL/Hyderabad.
The Divisional Engineer/M&P/TSSPDCL/Nalgonda.
The Divisional Engineer/Operation/TSSPDCL/ Devarakonda
The Senior Accounts Officer/Circle Office/TSSPDCL/Nalgonda.
The Asst.Divisional Engineer/Operation/TSSPDCL/ Nampally
ASST. DIVISIONAL ENGINEER
M&P:TSSPDCL : Miryalaguda
TEST REPORT FOR H.T.METERING SERVICE M&P: MLG MF is 1(One) for all
SOUTHERN POWER DISTRIBUTION COMPANY OF TELANGANA LIMITED
Operation Division: Devarakonda Date & Time of testing: 21.07.2020
Operation Sub-Division: Devarakonda Section: DINDI Distribution: DINDI
Name of the M&P Sub-Division: Miryalaguda
Purpose of testing: Periodical, New Service/Perioidcal/CTPT change/Meter Change
Purpose: Replacement of defective CTPT set as per the instructions of ADE/DPE/HT.
General:
SC NO: 4903400097 Actual Supply Voltage: 11KV
Category: CMD: 72 HP Specified Supply Voltage: 11KV
Purpose of Supply: Connected Load: -
Name & Address of the consumer: Nature of premises:
P.Sridevi Continuous/Non Continuous: Continuous
DINDI Meter Location: Inside/Outside the Premises: Inside
Dedicated or Not: Not
Whether all metering equipment as per the department guidelines or not: Yes
Metering: Indoor/Outdoor: Outdoor Seasonal or not: Not seasonal
Date of last periodical testing by M&P: - Govt/Private: Private
(A) Meter Particulars:
OLD/ Existing Particalurs New
L&T Make
12556367 Sl.No.
ER300P Type
Integraion Period
0.5s Class of Accuracy
10/5A CT Ratio
11KV/110V PT Ratio
KWH KWH/MWH
(B) CTPT Details:
OLD/ Existing Particalurs New
Vidyuth Make NIK-SAN
8408 Sl.No. NEC-369-443
Semi-Open Type Semi-Open
CT/PT Burden 5VA-10VA
11KV/110V PT Ratio 11KV/110V
10/5A Available CT Ratio 10/5A
3Ph-4W 3P3W/3P4W 3Ph-4W
10/5A Connected CT Ratio 10/5A
0.2s Class of Accuracy 0.2s
C. Transformer Details:
Make:- Sl.No: - Capacity:- KVA
MFG:- Voltage Ratio:
d Ratio Test: CT Ratio
R-Ph Y-Ph B-Ph
Primary Current - - -
Secondary current - - -
e Polarity Test: CTs
R-Ph Y-Ph B-Ph
In F.D In R.D In F.D In R.D In F.D In R.D
rn - - - - - -
yn - - - - - -
bn - - - - - -
f PTs:
ry yb br
Ry - - -
Yb - - -
Br - - -

(F) Volatages:
In Meter At TTB At T/F LT Side
Vrn 6371 IR 0.79 VRY 10.9 VRN 6.3 IR 0.7 VRN - IR -
Vyn 6360 IY 1.22 VYB 11.1 VYN 6.3 IY 1.1 VYN - IY -
Vbn 6449 IB 1.10 VBR 11.1 VBN 6.4 IB 1.1 VBN - IB -
(G): Testing:
Standard Kit used: Make: ZERA Sl.No: 050039192
Date of Calibration testing at NABL Lab:
Class of accuracy of testing kit: 0.02
1 ERS test (on consumer load) 2. ERS Display Parameters:
Meter Constant: R R
Number of Pulses: Y Y
KWH KVARH B B
0.07 0.00 Total KW: Avg PF:
% Error 0.14 0.35 Total KVAR: Freq:
0.05 0.00 Total KVA:
(H) Readings:
Initial readings Parameters Final readings
(before TTB opened) (After screws loose and TTB sealed
KWH 102871
KVAH 111628
KVARH(lg) 23485
KVARH(ld) 322293
KVA(MD) 49.413
Bills / Resets 42
CMD 3206
KVAH C1 --
KVAH C2 --
KVAH C3 --
KVAH C4 --
KVAH C5 --
KVAH C6 --
TOD KVA R1 --
TOD KVA R2 --
TOD KVA R3 --
TOD KVA R4 --
TOD KVA R5 --
TOD KVA R6 --
MF 1
(I). Seals Placed:-
Impression on seals before Condition of seal and Location of seals Impression on seal and
the inspection sealing wire seals nos after inspection
CT PT Set inspection cover AG506358,59 BPS
CT PT Set tank cover AG506360,61 BPS
AG506362,63,
S720985,86,87,88 BPS CT PT set secondary terminal cover
64,65
BPS
CT PT set incoming cables AG506366,67 BPS
Meter Board fixing
MC
MTC
MD
MRI
Y200596,97 BPS TTB AG506368,69 BPS
No seal YPS Box AG506370 BPS
AB Switch
Remarks:-
1. The Defective CTPT replaced with new of same ratio.
2. Meter tested in series with consumer load, its performance found satisfactory
2. No change in MF, MF is 1(One) for all

Sd/- Sd/- Sd/- Sd/-


Consumer AE/Opn/ DE/ADE/Opn/ ADE/M&P/MLG
Copy Submitted to:
The Divisional Engineer/DPE/HT-I/TSSPDCL/Hyderabad.
The Divisional Engineer/M&P/TSSPDCL/Nalgonda.
The Divisional Engineer/Operation/TSSPDCL/ Devarakonda
The Senior Accounts Officer/Circle Office/TSSPDCL/Nalgonda.
The Asst.Divisional Engineer/Operation/TSSPDCL/ Nampally
ASST. DIVISIONAL ENGINEER
M&P:TSSPDCL : Miryalaguda