You are on page 1of 7

List Equipment Pt.

BTR
BTR 设备单

Dimension
Jumlah数 Weight (T)
No 序号 Nama Mesin设备名称 Model 型号 (L*W*H)M
量 重量
长宽高

1 沥青粉碎机(气流式) AB60 4
Asphalt crusher (air flow type)
2 360分级机 360 grader DR800 1
2台除磁机 2
3 预除磁 Pre-degaussing 1
4 容量:3000L
demagnetizers
Capacity: 10
VC混合机(2)VC mixer(2)
3000L
5 容量:5000L Capacity: 2
VC混合机(2) VC mixer(2)
5000L
6 直排筛 Straight screen 24
60米6列 60 meters 6
7 辊道窑 roller kiln 2
columns
60米4列 60 meters 4
8 辊道窑 roller kiln 10
columns

9 自动出料装置 Automatic 12
discharging device
10 处理炉设备 Treatment 12
furnace equipment
11 打散机 Dispersing machine CSJ500+WDL500 12
12 产线连接 Production line 6
connection

碳化和成品车间基础用电
13 Basic electricity consumption 1
in carbonization and finished
product workshops

14 三偏心混合机 Triple 16m³ 8


eccentric mixer
15 振动筛(1)Vibrating 1000型 Type 1000 56
screen(1)
16 除磁机 Demagnetizer 56

1.0米(其中成品每条线配2个
17 振动筛(2) Vibrating screen 筛) 1.0 meters (the finished 28
(2) product is equipped with 2
screens for each line)

18 成品包装机 Finished product 14


packaging machine
19 热合机 Heat sealing machine 14

立体库+除湿机 Three-
20 dimensional library + 1
dehumidifier
21 产线连接 Production line 2
connection
22 水环真空泵 Water ring 2BV5161 50
vacuum pump
冷却水塔+循环水泵 Cooling
23 water tower + circulating 良研 8
water pump
空压机+冷干机+吸干机 Air 空压机280KW Air
24 compressor + cold dryer + 6
compressor 280KW
suction dryer

25 空压缓存罐 Air pressure 3m³ 2


buffer tank
26 氮气站 Nitrogen station 30m³ 1
27 液氮罐 liquid nitrogen tank 30m³ 1
28 Freight Elevator Atlas WT3 6
Visitor Elevator at Testing
29 Metis CR1 1
Center Building
Visitor Elevator at Office
30 Joymore 7B 1
Building
31 氮气缓冲罐 Nitrogen buffer 20m³ 1
tank
32 吊葫芦 hanging hoist 2T 4
33 二组分 Two components / 2
34 VC混合机 VC mixer VC3000L 3
35 双工位填充机 Dual station JKT-2C 1
filling machine
36 CIP冷等静压设备 CIP cold LDJ1250/4500-120S 2
isostatic pressing equipment
37 粗破 Roughly broken YP1200 1
38 振动给料机 Vibrating feeder / 2
39 中破 medium break CSJ800 2
40 360细破(无旋风)360 fine DR800 4
break (no cyclone)
产线联结(含罗茨风机)
41 Production line connection / 1
(including Roots blower)
List Equipment Pt.BTR
BTR 设备单

Pemakaian Per Mesin


动力 Total Per Bagian
Location Ampere Power
Phase 1
位置 60% Ampere( Persentase (Kw)
Ampere Persentase
A) 百分比

123.0 0.0000 80.0000

254.0 0.0000 160.0000


108.0 0.0000 120.0000
146.0 0.0000 90.0000

Phase 1 179.0 0.0000 110.0000

1.7 0.0000 26.4000

3685.0 0.0000 3360.0000

2687.0 0.0000 14000.0000

0.0 0.0000 0.0000

0.0 0.0000 0.0000

97.0 0.0000 378.0000

308.0 0.0000 180.0000

2345.0 0.0000 229.0000

Phase 1
146.0 0.0000 72.0000

6.6 0.0000 117.6000

20.0 0.0000 364.0000

4.61 0.0000 58.8000

20.0 0.0000 42.0000

24.6 0.0000 44.8000

1136.0 0.0000 481.0000


308.0 0.0000 240.0000

16.8 0.0000 275.0000

202.8 0.0000 844.8000

429.6 0.0000 840.0000

Phase 1
0.0 0.0000 0.0000

1688.0 0.0000 660.0000


0.0 0.0000 0.0000
26.0 0.0000 11.1000

22.0 0.0000 9.3000

21.0 0.0000 9.2000

0.0 0.0000 0.0000

2.3 0.0000 4.8000


9.2 0.0000 9.6000
168.0 0.0000 264.0000

184.0 0.0000 96.0000

460.0 0.0000 480.0000

33.0 0.0000 17.6000


184.0 0.0000 1.6000
460.0 0.0000 48.0000
phase 1
33.0 0.0000 313.6000

1.5 0.0000 160.0000


SS
AREA
区域

Coating Proses at
Carbonization
Product Workshop

Finished Product at
Carbonization
Product Workshop
Public Works

Isolatic Pressing at
Carbonization
Product Workshop