I. SUMMARY

II. PRODUCT DESCRIPTION & APPLICATION


III. MARKET STUDY AND PLANT CAPACITY
A. MARKET STUDY
B. PLANT CAPACITY & PRODUCTION PROGRAMME
IV. RAW MATERIALS AND INPUTS
A. RAW MATERIALS
B. UTILITIES
V. TECHNOLOGY & ENGINEERING
A. TECHNOLOGY
B. ENGINEERING
VI. MANPOWER & TRAINING REQUIREMENT
A. MANPOWER REQUIREMENT
B. TRAINING REQUIREMENT
VII. FINANCIAL ANLYSIS

SIMPLE RATE OF RETURN (SRR)


PAY-BACK PERIOD
INTERNAL RATE OF RETURN (IRR)
VIII. ANNEX
I. SUMMARY

This study envisions the establishment of a plant for the manufacturing, fabrication and
production of industrial spare parts and equipments with a capacity of 132,300 and 252 pieces
per annum respectively.

The major raw materials required to make such designed products are metals, non-metals,
consumables and other on shelf standard parts, which are available locally and in global market.

At the startup product output of the line will increase as follow in the next three consecutive
years. Estimated products are 151200, 163800 and 176400 pieces per annum respectively.

The total investment requirement is estimated at about Birr 116,834,912.20 out of which Birr
50,047,949.70 is required for building work and the remaining 66,786,962.50 birr is required for
equipment and others (Note: 3,600,000 birr is expected to utility which is excluded). The plant
will create employment opportunities for 250 persons.

The project is financially viable with a Simple Rate of Return (SRR) of 18.0% and Pay-back
Period is 4.65 years

The project will create a forward linkage effect with other industrial sub-sector.

II. PRODUCT DESCRIPTION AND APPLICATION

One of the modern flexible manufacturing equipments and technology comprise improved
products and efficiency. The manufacturing and availing of this item/output will have a profound
impact on the manufacturing industry sub-sector development in the country. some of the outputs
of the factory are listed in annex 1.

This designed flexible manufacturing plant will engaged on manufacturing/fabrication of


different high and low value spare parts and industrial machine tools as well. Expected
Customers for this plant outputs are Textile Industry, Leather Industry, Sugar Industry,
Construction Machinery, Automotive Industry, Cement Industry, agro processing industry and
other private sector. To realize its ultimate objective the factory is deployed as manufacturing,
fabrication and production discipline lines align with the necessary technology.
PRICING AND DISTRIBUTION

Projected sales

Table 1.1 Daily Sales of Spare Parts

Yearly 252Days/Year x 137,000.00 Birr 34,524,000.00 Birr

Table 2 Daily Sales of Fabrication and Production Work shop

Yearly 252Days/Year x 101,750.00 = 25,641,000.00 Birr

Total Sales = 34,524,000.00 Birr + 25,641,000.00 Birr = 60,165,000.00 Birr

III. PLANT CAMPACITY AND PRODUCTION PROGRAMME

Table 3 Projected capacity of the plant (tones)

year Projected capacity(ton)


2016 218.3
2017 249.5
2018 270.3
2019 291.1
2020 311.85
IV. MATERIALS AND INPUTS
A. RAW MATERIALS

Main raw materials of the project are indicated in table 4. The necessary consumable
materials/inputs required are cutting tools and chemicals which are available from the local and
global market.

Table 4 Raw materials requirement

Sr. no. Raw material Unit of measurement Qty. Remark


1 Sheet metals Ton 25 Considering
2 Plates Ton 50 ferrous and
3 Round, square, rectangular Ton 120 non-ferrous
and flat bars materials in
4 RHS, angle iron, steel Ton 35 different size
structure. ranges.
5 Bakelite and composites Ton 10
Total Ton 240

B. UTILITIES

Electricity and water are the principal utilities of the project. Mainly water required for coolant
mixture, garden watering, workers cleaning, janitor works, showers, garage and heavy
machineries required high electricity amount, lighting. The annual utilities requirement and cost
are indicated in Table 5. The unit price of utilities is shown in financial analysis section.

Table 5 Utilities requirement and cost


TECHNOLOGY AND ENGINEERING

A. TECHNOLOGY

Production of the plant is environmental friendly. The by-products that are left over during
designed production are cheeps and scraps of metals that can be used as recycled raw materials
and consumables goods.
B. ENGINEERING

1. Machinery and Equipment


The list of machinery and equipment is indicated in table 6 the total cost of necessary
Equipments and other related issues is estimated at Birr 66,786,962.5 birr.

Table 6 Machinery and equipment requirement.

Sr. No. name Code Qty.

1 Conventional Lathe CA6140×1000 02


2 Conventional Lathe CA6140×1000 05
3 Conventional Lathe CA6140×1000 02
4 Conventional Lathe CA6140×1000 02
5 Conventional Lathe CA6140×1000 02
6 CNC Lathe CAK6140×1000 01
7 CNC Lathe CAK6140×1000 02
8 CNC Lathe CAK6140×1000 01
9 Horizontal milling machine X6132 01
10 X6132 01
11 Universal Milling Machine X6132 02
12 Vertical Milling Machine X6132 01
13 vertical Milling Machine X6132 01
14 Pity Furnace with Quenching medium 01
15 CNC Milling Machine XK713 01
16 CNC Milling Machine XK7136 01
17 Slotting Machine B5020 01
18 Slotting Machine B5020 01
19 Slotting Machine B5020 02
20 CNC Vertical Machine Center MLV1060 02
21 universal cylindrical grinding machine M13 series 02
22 surface grinding machine 02
23 radial drilling machine Z3063X20 02
24 vertical drilling machine Z3063X20 03
25 pedestal grinding machine 03
26 power hack saw 03
27 shearing machine QC12Y-4X2000 01
28 QC12Y-6X3000 01
29 QC12Y-16X3000 01
30 combination shearing machine Q35Y-16 01
31 Q35Y-20 01
32 ROLLING MACHINE 01
33 W11-4X2000 01
34 W11-4X2000 01
35 W11-4X2000 01
36 hydraulic press brake machine WC67Y-160X3200 01
37 hydraulic pipe bending machine DW38NC 01
38 DW38NC 01
39 Hydraulic Press 03
40 Rivet Gun -
41 Electric Flat Truck 6T -
42 Fork Lift –5T 01
43 Electrical Chamber Furnace RJ2-30-12 01
44 Electrical Chamber Furnace RJ2-30-12 01

2. LAND, BUILDING AND CIVIL WORKS


The plant requires a total of 10,000m2 area of land out which 4000 m2 is built – up area which
includes manufacturing/fabrication/production area, and finished product stock area , the
remaining 6000 square meters for general purpose building, raw material , stock and space for
future expansion. The total cost of construction is estimated to be Birr 50,047,949.7.

According to the Federal Legislation on the Lease Holding of Urban Land (Proclamation No
272/2002) in principle, urban land permit by lease is on auction or negotiation basis, however,
the time and condition of applying the proclamation shall be determined by the concerned
regional or city government depending on the level of development.

The legislation has also set the maximum on lease period and the payment of lease prices. The
lease period ranges from 99 years for education, cultural research health, sport, NGO , religious
and residential area to 80 years for industry and 70 years for trade while the lease payment
period ranges from 10 years to 60 years based on the towns grade and type of investment.

Moreover, advance payment of lease based on the type of investment ranges from 5% to
10%.The lease price is payable after the grace period annually. For those that pay the entire
amount of the lease will receive 0.5% discount from the total lease value and those that pay in
installments will be charged interest based on the prevailing interest rate of banks. Moreover,
based on the type of investment, two to seven years grace period shall also be provided.

However, the Federal Legislation on the Lease Holding of Urban Land apart from setting the
maximum has conferred on regional and city governments the power to issue regulations on the
exact terms based on the development level of each region
V. MANPOWER AND TRAINING REQUIREMENT
A. MANPOWER REQUIREMENT

The manpower requirement of the envisaged project is 250 persons. The list of manpower is
indicated in the Table 7.

Table 7 Manpower requirement

Market Potential

Installed capacity of the plant may have market destinations like sugar factories, fertilizer factories,
mega projects, machine building industries, automotive industries, textile industries, food processing and
machine manufacturers industries and etc..
VI. Opportunities and Threats Analysis
A. Opportunity
 Limited options in locally produced real heavy duty industrial spare parts. High import
reduction potential.
 With good pre-feasibility study and business plan, which is around 100% of the total
production, could be turned into potential business opportunity.
 Reduction in excise and import duties on processing machinery.
B. Threat
 Unavailability of adequate industry statistics.
 Simple Product Company.
 Frequent power interruption.
 High cost of backward integration (availability of raw material).
 Threat from other machine tools exporting countries (such as china which is already in
foreign market).
 Heavy advertising from existing giant players.
 High cost to meet international quality standards.
VII. Socio-economic impact of the project

Over a long time horizon and setting up of a number of similar units would result into following
socio-economic benefits for the country.

 Indigenous production of such industrial products would lead to self-reliance for these
items in the field of heavy processing supplies. This would also insulate the financial
flows from vagaries of external economies.
 Local production of such spare parts would lead to import substitution which would
result in saving of foreign exchange. Setting up of more units to meet the requirement of
industrial supplies would have a multiplier effect on foreign exchange saving.
 There are possibilities of export of these products to other neighboring markets. This
would lead to earning to foreign exchange for the country.
 There are not many medium and small scale units manufacturing units in Ethiopia.
Setting up of this unit would have a catalytic effect on growth of entrepreneurship in
medium and small scale sector.
 The setting up of the project would lead to generation of direct and indirect employment,
both for skilled and unskilled workers which would result into economic upliftment of
local population. This would also lead to up gradation of skills.
 There are employment opportunities in the project for persons with managerial, technical,
financial and marketing capabilities. The employment of such people in the local industry
would provide them an option to have an employment in private sector in the country and
also reduce the migration of qualified manpower.
 There would be revenue generation for the local government by way of excise, sales
tax/VAT and income tax from the unit as well as from its promoters.
 Finally, the project would lead to enhancement of economic activities in the field of
construction, transport of raw materials and finished goods, marketing and trade, repairs
and maintenance, etc.
VIII. FINANCIAL ANALYSIS.

The financial analysis of the heavy duty flexible manufacturing project is based on the data
presented in the previous chapters and the following assumptions:-

Basic assumptions

Source of finance 100% Loan


Tax holidays 2years
Bank interest 12.5%
Constriction period 1year
Depreciation
Building 5%
Machinery 20%
Vehicle 20%
Office equipment 20%
Computers and 25%
accessory
Total Initial Investment Cost

The total initial investment cost of the project including working capital is estimated at Birr
110,417,712. The breakdown of the total initial investment cost is shown in Tables below.
Table 8 Fixed Investment Cost

Initial working capital

The major raw materials required to make such designed products are metals, non-metals,
consumables and other on shelf standard parts, which are available locally and in global market.
Raw materials requirement of the plant at the startup operation and the estimated costs are shown
in Table below.
Table 9 Raw material cost

No . description Unit of Qty. Estimated cost


measurement
1 Raw material ton 218.3 3,649,999,95
2 Cutters and consumables Pcs 236 2,150,000
Total 5,799,999.95

Utilities

The utilities required for the plant comprise electric power and water. The total annual
requirement for utilities at 100% capacity utilization rate and the estimated costs are given in
table below

Initial investment cost

Total investment cost of the project is thus estimated for the year at 120,434,912.6
Birr and is the sum of the fixed investment cost and the initial working capital as shows in the
table below
Loan Repayment Schedule

Repayment of principles is assumed to be equal instilment of the outstanding amount of each


year ending & interest rate would be assumed 12.5%. Therefore, the loan repayment schedule &
interest payable is calculated below

Average interest = 9,032,618.45


Project Revenue
Pay-back Period

The pay-back period, also called pay – off period is defined as the period required for recovering
the original investment outlay through the accumulated net cash flows earned by the project.
Accordingly, based on the projected cash flow it is estimated that the project’s initial investment
will be fully recovered within 4.65 years.

Pay-back period = total investment cost


Net profit + total depreciation

= 120,434,912.6
(12,634,650+13, 269789.9)

= 4.65 years

Simple Rate of Return

The internal rate of return (SRR) is the annualized effective compounded return rate that can be
earned on the invested capital, i.e., the yield on the investment. Put another way, the internal rate
of return for an investment is the discount rate that makes the net present value of the
investment's income stream total to zero. It is an indicator of the efficiency or quality of an
investment. As we seen from SRR analysis the result bank interest rate.

SRR = Net-profit + Av. Bank interest x 100%


Total investment

SRR= 12,634,650+9,032,618.45
120,434,912.6

= 17.99 ≈ 18 %

Internal Rate of Return (IRR) = Total investment Costs x 100


Total Annual Profit Sales

= 120,434,912.6 X 100

18,049,500

= 66.7%
IX. Annex:- Some of the products of the factory when it comes in to its full production.

Low value items High value items Equipments


Shafts different sizes sheave Trolleys
Sleeves Connecting shaft Assembled chains
Rings Proof shaft Cylinders boiler
Drums End shaft Automotive Body
Sprockets Middle shaft Plate blocks (jig and fixtures)
Gears Drive side shaft Frame (machine or building)
Pulleys machining of tail end Gang tree crane
sprocket for cane feeder
table
Sealing head end shaft for main
cane carrier
Gear housing tail end shaft for main cane
carrier
Chains Tail/take up
Keys Drive shaft with sprocket
Shafts Equalizer shaft
Pins
Flanges
Axle
Bushings
Threads (internal &external)
Bolt and nuts
Attritions works
Washers
Studs
Plates
Levers
Wheel
Knob
Seal
Toggle
Cotter
Disc
Screw
Rack and pinion

You might also like