1 Every damper shall have an indicating device clearly showing the damper position at all times.
EPC to ensure that total air flow rate, sound level, required pressure loss & maximum permitted velocity should be as per
2
approved design and as per site conditions.
As per list of approved makes for the MEP works Proposed make Caryaire is approved for the Intake louver under category_3
- EPC should submit required documents as per following at the time of delivery and joint inspection
3
1. OEM routine test certificate.
2. Visual check report.
1of1
Technical Data Sheet
For
Intake Louver
A General
B Construction