You are on page 1of 75

task_code status_code wbs_id wbs_name

Activity ID Activity Status WBS Code (*)WBS Name


MIL-010 Not Started project-power bi.3.9 CONTRACT/OTHER MILESTONES
MIL-030 Not Started project-power bi.3.9 CONTRACT/OTHER MILESTONES
MIL-040 Not Started project-power bi.3.9 CONTRACT/OTHER MILESTONES
MIL-090 Not Started project-power bi.3.9 CONTRACT/OTHER MILESTONES
MIL-020 Not Started project-power bi.3.9 CONTRACT/OTHER MILESTONES
GEN-DOC110 Not Started project-power bi.3.1 DOCUMENTATION
GEN-DOC120 Not Started project-power bi.3.1 DOCUMENTATION
GEN-DOC130 Not Started project-power bi.3.1 DOCUMENTATION
GEN-DOC140 Not Started project-power bi.3.1 DOCUMENTATION
MOB-1000 Not Started project-power bi.5.2.1 Site Office & Facilities
MOB-1010 Not Started project-power bi.5.2.1 Site Office & Facilities
MOB-1020 Not Started project-power bi.5.2.1 Site Office & Facilities
MOB-1030 Not Started project-power bi.5.2.1 Site Office & Facilities
MOB-1060 Not Started project-power bi.5.2.3 Manpower Mobilization to Site
ENG-1030 Not Started project-power bi.4.3.2 IFC Drawing Package for Phase 1
ENG-1040 Not Started project-power bi.4.3.2 IFC Drawing Package for Phase 1
ENG-1050 Not Started project-power bi.4.3.2 IFC Drawing Package for Phase 1
ENG-1060 Not Started project-power bi.4.3.2 IFC Drawing Package for Phase 1
A1PH1-SUB-BNot Started project-power bi.5.6.1.4.1 Blinding Concrete Works
A1PH1-SUB-BNot Started project-power bi.5.6.1.4.1 Blinding Concrete Works
A1PH1-SUB-BNot Started project-power bi.5.6.1.4.1 Blinding Concrete Works
A1PH1-SUB-ICNot Started project-power bi.5.6.1.4.2 Isolated Concrete Foundation Works
A1PH1-SUB-CNot Started project-power bi.5.6.1.4.6 Concrete Retaining Walls Footing
A1PH1-CON-SNot Started project-power bi.5.6.1.4.10 Slab on Grade Works
A1PH1-MEP-1Not Started project-power bi.5.6.1.4.8 MEP Works
A1PH1-SUB-MNot Started project-power bi.5.6.1.4.9 Mechanical Backfill Works
CLOSE-10 Not Started project-power bi.5.3.1 As Built & Close Out Reprt
CLOSE-20 Not Started project-power bi.5.3.1 As Built & Close Out Reprt
CLOSE-30 Not Started project-power bi.5.3.1 As Built & Close Out Reprt
CLOSE-40 Not Started project-power bi.5.3.1 As Built & Close Out Reprt
DEM-1000 Not Started project-power bi.5.3.7 Project Completion
A1PH1-SUB-T-Not Started project-power bi.5.6.1.4.7.1 Foundation
A1PH1-SUB-T-Not Started project-power bi.5.6.1.4.7.1 Foundation
A1PH1-SUB-T-Not Started project-power bi.5.6.1.4.7.1 Foundation
A1PH1-SUB-T-Not Started project-power bi.5.6.1.4.7.1 Foundation
A1PH1-SUB-T-Not Started project-power bi.5.6.1.4.7.1 Foundation
A1PH1-SUB-T-Not Started project-power bi.5.6.1.4.7.1 Foundation
A1PH1-SUB-T-Not Started project-power bi.5.6.1.4.7.2 Post Tension Basement Floor Slab
A1PH1-SUB-T-Not Started project-power bi.5.6.1.4.7.1 Foundation
A1PH1-SUB-T-Not Started project-power bi.5.6.1.4.7.2 Post Tension Basement Floor Slab
A1PH1-SUB-T-Not Started project-power bi.5.6.1.4.7.2 Post Tension Basement Floor Slab
MOB-1040 Not Started project-power bi.5.2.1 Site Office & Facilities
PROC-PH1-10Not Started project-power bi.11.8.1.13 Supply of Precast Slab for Phase 1
PROC-PH1-10Not Started project-power bi.11.8.1.13 Supply of Precast Slab for Phase 1
PROC-PH1-10Not Started project-power bi.11.8.1.13 Supply of Precast Slab for Phase 1
PROC-PH1-10Not Started project-power bi.11.8.1.13 Supply of Precast Slab for Phase 1
PROC-C1000 Not Started project-power bi.11.8.1.1 Ready Mix Concrete
PROC-C1010 Not Started project-power bi.11.8.1.1 Ready Mix Concrete
PROC-C1020 Not Started project-power bi.11.8.1.1 Ready Mix Concrete
PROC-C1030 Not Started project-power bi.11.8.1.1 Ready Mix Concrete
PROC-C1040 Not Started project-power bi.11.8.1.1 Ready Mix Concrete
PROC-C1050 Not Started project-power bi.11.8.1.1 Ready Mix Concrete
PROC-C1060 Not Started project-power bi.11.8.1.2 Rebar
PROC-C1070 Not Started project-power bi.11.8.1.2 Rebar
PROC-C1080 Not Started project-power bi.11.8.1.2 Rebar
PROC-C1090 Not Started project-power bi.11.8.1.2 Rebar
PROC-C1100 Not Started project-power bi.11.8.1.2 Rebar
PROC-C1110 Not Started project-power bi.11.8.1.2 Rebar
PROC-C1120 Not Started project-power bi.11.8.1.3 Vapour Barrier Polyethylene Sheet
PROC-C1130 Not Started project-power bi.11.8.1.3 Vapour Barrier Polyethylene Sheet
PROC-C1140 Not Started project-power bi.11.8.1.3 Vapour Barrier Polyethylene Sheet
PROC-C1150 Not Started project-power bi.11.8.1.3 Vapour Barrier Polyethylene Sheet
PROC-C1160 Not Started project-power bi.11.8.1.3 Vapour Barrier Polyethylene Sheet
PROC-C1170 Not Started project-power bi.11.8.1.3 Vapour Barrier Polyethylene Sheet
PROC-C1180 Not Started project-power bi.11.8.1.4 Accessories for Post Tension Slab
PROC-C1190 Not Started project-power bi.11.8.1.4 Accessories for Post Tension Slab
PROC-C1200 Not Started project-power bi.11.8.1.4 Accessories for Post Tension Slab
PROC-C1210 Not Started project-power bi.11.8.1.4 Accessories for Post Tension Slab
PROC-C1220 Not Started project-power bi.11.8.1.4 Accessories for Post Tension Slab
PROC-C1230 Not Started project-power bi.11.8.1.4 Accessories for Post Tension Slab
PROC-C1240 Not Started project-power bi.11.8.1.5 Termite Control
PROC-C1250 Not Started project-power bi.11.8.1.5 Termite Control
PROC-C1260 Not Started project-power bi.11.8.1.5 Termite Control
PROC-C1270 Not Started project-power bi.11.8.1.5 Termite Control
PROC-C1280 Not Started project-power bi.11.8.1.5 Termite Control
PROC-C1290 Not Started project-power bi.11.8.1.5 Termite Control
PROC-C1300 Not Started project-power bi.11.8.1.6 Asphalt
PROC-C1310 Not Started project-power bi.11.8.1.6 Asphalt
PROC-C1320 Not Started project-power bi.11.8.1.6 Asphalt
PROC-C1330 Not Started project-power bi.11.8.1.6 Asphalt
PROC-C1340 Not Started project-power bi.11.8.1.6 Asphalt
PROC-C1350 Not Started project-power bi.11.8.1.6 Asphalt
PROC-C1360 Not Started project-power bi.11.8.1.7 Backfilling Materials
PROC-C1370 Not Started project-power bi.11.8.1.7 Backfilling Materials
PROC-C1380 Not Started project-power bi.11.8.1.7 Backfilling Materials
PROC-C1390 Not Started project-power bi.11.8.1.7 Backfilling Materials
PROC-C1400 Not Started project-power bi.11.8.1.7 Backfilling Materials
PROC-C1410 Not Started project-power bi.11.8.1.7 Backfilling Materials
PROC-C1420 Not Started project-power bi.11.8.1.8 Filler Board
PROC-C1430 Not Started project-power bi.11.8.1.8 Filler Board
PROC-C1440 Not Started project-power bi.11.8.1.8 Filler Board
PROC-C1450 Not Started project-power bi.11.8.1.8 Filler Board
PROC-C1460 Not Started project-power bi.11.8.1.8 Filler Board
PROC-C1470 Not Started project-power bi.11.8.1.8 Filler Board
PROC-E1000 Not Started project-power bi.11.8.2.1 PVC Conduit pipes Sleeves
PROC-E1010 Not Started project-power bi.11.8.2.1 PVC Conduit pipes Sleeves
PROC-E1020 Not Started project-power bi.11.8.2.1 PVC Conduit pipes Sleeves
PROC-E1030 Not Started project-power bi.11.8.2.1 PVC Conduit pipes Sleeves
PROC-E1040 Not Started project-power bi.11.8.2.1 PVC Conduit pipes Sleeves
PROC-E1050 Not Started project-power bi.11.8.2.1 PVC Conduit pipes Sleeves
PROC-P1000 Not Started project-power bi.11.8.4.1 Drainage uPVC Pipes
PROC-P1010 Not Started project-power bi.11.8.4.1 Drainage uPVC Pipes
PROC-P1020 Not Started project-power bi.11.8.4.1 Drainage uPVC Pipes
PROC-P1030 Not Started project-power bi.11.8.4.1 Drainage uPVC Pipes
PROC-P1040 Not Started project-power bi.11.8.4.1 Drainage uPVC Pipes
PROC-P1050 Not Started project-power bi.11.8.4.1 Drainage uPVC Pipes
PROC-P1060 Not Started project-power bi.11.8.4.2 Floor cleanouts , Floor Drain, Floor T
PROC-P1070 Not Started project-power bi.11.8.4.2 Floor cleanouts , Floor Drain, Floor T
PROC-P1080 Not Started project-power bi.11.8.4.2 Floor cleanouts , Floor Drain, Floor T
PROC-P1090 Not Started project-power bi.11.8.4.2 Floor cleanouts , Floor Drain, Floor T
PROC-P1100 Not Started project-power bi.11.8.4.2 Floor cleanouts , Floor Drain, Floor T
PROC-P1110 Not Started project-power bi.11.8.4.2 Floor cleanouts , Floor Drain, Floor T
PROC-E1060 Not Started project-power bi.11.8.2.2 Lightning Protection System
PROC-E1070 Not Started project-power bi.11.8.2.2 Lightning Protection System
PROC-E1080 Not Started project-power bi.11.8.2.2 Lightning Protection System
PROC-E1090 Not Started project-power bi.11.8.2.2 Lightning Protection System
PROC-E1100 Not Started project-power bi.11.8.2.2 Lightning Protection System
PROC-E1110 Not Started project-power bi.11.8.2.2 Lightning Protection System
PROC-E1120 Not Started project-power bi.11.8.2.3 Grounding System
PROC-E1130 Not Started project-power bi.11.8.2.3 Grounding System
PROC-E1140 Not Started project-power bi.11.8.2.3 Grounding System
PROC-E1150 Not Started project-power bi.11.8.2.3 Grounding System
PROC-E1160 Not Started project-power bi.11.8.2.3 Grounding System
PROC-E1170 Not Started project-power bi.11.8.2.3 Grounding System
A1PH1-SUB-T-Not Started project-power bi.5.6.1.4.7.2 Post Tension Basement Floor Slab
CONS-MH01-1Not Started project-power bi.5.13.11 Construction of Manhole
A1PH1-SUB-BNot Started project-power bi.5.6.1.4.1 Blinding Concrete Works
A1PH1-SUB-ICNot Started project-power bi.5.6.1.4.2 Isolated Concrete Foundation Works
A1PH1-SUB-ICNot Started project-power bi.5.6.1.4.2 Isolated Concrete Foundation Works
A1PH1-SUB-CNot Started project-power bi.5.6.1.4.3 Concrete Column Neck Works
A1PH1-SUB-T-Not Started project-power bi.5.6.1.4.7.1 Foundation
A1PH1-SUB-T-Not Started project-power bi.5.6.1.4.7.1 Foundation
A3PH1-SUB-T-Not Started project-power bi.5.6.4.4.7.1 Foundation
A3PH1-SUB-T2Not Started project-power bi.5.6.4.4.7.1 Foundation
A3PH1-SUB-T-Not Started project-power bi.5.6.4.4.7.1 Foundation
A3PH1-SUB-T-Not Started project-power bi.5.6.4.4.7.1 Foundation
A3PH1-SUB-T-Not Started project-power bi.5.6.4.4.7.1 Foundation
A3PH1-SUB-T-Not Started project-power bi.5.6.4.4.7.1 Foundation
A3PH1-SUB-T-Not Started project-power bi.5.6.4.4.7.2 Post Tension Basement Floor Slab
A3PH1-SUB-T-Not Started project-power bi.5.6.4.4.7.1 Foundation
A3PH1-SUB-T-Not Started project-power bi.5.6.4.4.7.2 Post Tension Basement Floor Slab
A3PH1-SUB-T-Not Started project-power bi.5.6.4.4.7.1 Foundation
A3PH1-SUB-T-Not Started project-power bi.5.6.4.4.7.1 Foundation
A1PH1-SUB-CNot Started project-power bi.5.6.1.4.4 Concrete Tie Beam Works
A1PH1-SUB-ICNot Started project-power bi.5.6.1.4.2 Isolated Concrete Foundation Works
A1PH1-SUB-ICNot Started project-power bi.5.6.1.4.2 Isolated Concrete Foundation Works
A1PH1-SUB-BNot Started project-power bi.5.6.1.4.1 Blinding Concrete Works
A1PH1-SUB-ICNot Started project-power bi.5.6.1.4.2 Isolated Concrete Foundation Works
A1PH1-SUB-ICNot Started project-power bi.5.6.1.4.2 Isolated Concrete Foundation Works
A1PH1-SUB-CNot Started project-power bi.5.6.1.4.3 Concrete Column Neck Works
A1PH1-SUB-CNot Started project-power bi.5.6.1.4.3 Concrete Column Neck Works
A1PH1-SUB-CNot Started project-power bi.5.6.1.4.3 Concrete Column Neck Works
A1PH1-SUB-CNot Started project-power bi.5.6.1.4.4 Concrete Tie Beam Works
A1PH1-SUB-CNot Started project-power bi.5.6.1.4.4 Concrete Tie Beam Works
A1PH1-SUB-CNot Started project-power bi.5.6.1.4.4 Concrete Tie Beam Works
A1PH1-SUB-CNot Started project-power bi.5.6.1.4.6 Concrete Retaining Walls Footing
A1PH1-SUB-CNot Started project-power bi.5.6.1.4.6 Concrete Retaining Walls Footing
A1PH1-SUB-CNot Started project-power bi.5.6.1.4.6 Concrete Retaining Walls Footing
A1PH1-SUB-CNot Started project-power bi.5.6.1.4.6 Concrete Retaining Walls Footing
A1PH1-SUB-CNot Started project-power bi.5.6.1.4.6 Concrete Retaining Walls Footing
A1PH1-SUB-CNot Started project-power bi.5.6.1.4.6 Concrete Retaining Walls Footing
A1PH1-SUB-MNot Started project-power bi.5.6.1.4.9 Mechanical Backfill Works
A1PH1-SUB-BNot Started project-power bi.5.6.1.4.1 Blinding Concrete Works
A1PH1-SUB-CNot Started project-power bi.5.6.1.4.6 Concrete Retaining Walls Footing
A1PH1-SUB-CNot Started project-power bi.5.6.1.4.6 Concrete Retaining Walls Footing
A1PH1-SUB-CNot Started project-power bi.5.6.1.4.6 Concrete Retaining Walls Footing
A1PH1-SUB-CNot Started project-power bi.5.6.1.4.6 Concrete Retaining Walls Footing
A1PH1-MEP-1Not Started project-power bi.5.6.1.4.8 MEP Works
A1PH1-CON-SNot Started project-power bi.5.6.1.4.10 Slab on Grade Works
A1PH1-CON-SNot Started project-power bi.5.6.1.4.10 Slab on Grade Works
A1PH1-CON-SNot Started project-power bi.5.6.1.4.10 Slab on Grade Works
A1PH1-CON-SNot Started project-power bi.5.6.1.4.10 Slab on Grade Works
A1PH1-CON-ANot Started project-power bi.5.6.1.4.5 Asphalt Paving Works (Work by Subco
A1PH1-CON-ANot Started project-power bi.5.6.1.4.5 Asphalt Paving Works (Work by Subco
A1PH1-CON-ANot Started project-power bi.5.6.1.4.5 Asphalt Paving Works (Work by Subco
A1PH1-CON-ANot Started project-power bi.5.6.1.4.5 Asphalt Paving Works (Work by Subco
A1PH1-SUB-S Not Started project-power bi.5.6.1.4.11 Concrete Shear Wall /Sumpit Founda
A1PH1-SUB-S Not Started project-power bi.5.6.1.4.11 Concrete Shear Wall /Sumpit Founda
A1PH1-SUB-S Not Started project-power bi.5.6.1.4.11 Concrete Shear Wall /Sumpit Founda
A1PH1-SUB-S Not Started project-power bi.5.6.1.4.11 Concrete Shear Wall /Sumpit Founda
A1PH1-SUB-S Not Started project-power bi.5.6.1.4.11 Concrete Shear Wall /Sumpit Founda
A1PH1-SUB-S Not Started project-power bi.5.6.1.4.11 Concrete Shear Wall /Sumpit Founda
A1PH1-SUB-S Not Started project-power bi.5.6.1.4.11 Concrete Shear Wall /Sumpit Founda
A1PH1-SUB-CNot Started project-power bi.5.6.1.4.3 Concrete Column Neck Works
A1PH1-SUB-ICNot Started project-power bi.5.6.1.4.2 Isolated Concrete Foundation Works
A1PH1-SUB-S Not Started project-power bi.5.6.1.4.11 Concrete Shear Wall /Sumpit Founda
A1PH1-SUB-CNot Started project-power bi.5.6.1.4.4 Concrete Tie Beam Works
A1PH1-SUB-CNot Started project-power bi.5.6.1.4.6 Concrete Retaining Walls Footing
A1PH1-CON-SNot Started project-power bi.5.6.1.4.10 Slab on Grade Works
A1PH1-MEP-1Not Started project-power bi.5.6.1.4.8 MEP Works
A2PH1-SUB-BNot Started project-power bi.5.6.13.4.1 Blinding Concrete Works
A2PH1-SUB-BNot Started project-power bi.5.6.13.4.1 Blinding Concrete Works
A2PH1-SUB-BNot Started project-power bi.5.6.13.4.1 Blinding Concrete Works
A2PH1-SUB-ICNot Started project-power bi.5.6.13.4.2 Isolated Concrete Foundation Works
A2PH1-SUB-CNot Started project-power bi.5.6.13.4.6 Concrete Retaining Walls Footing
A2PH1-CON-SNot Started project-power bi.5.6.13.4.10 Slab on Grade Works
A2PH1-MEP-1Not Started project-power bi.5.6.13.4.8 MEP Works
A2PH1-SUB-MNot Started project-power bi.5.6.13.4.9 Mechanical Backfill Works
A2PH1-SUB-BNot Started project-power bi.5.6.13.4.1 Blinding Concrete Works
A2PH1-SUB-ICNot Started project-power bi.5.6.13.4.2 Isolated Concrete Foundation Works
A2PH1-SUB-ICNot Started project-power bi.5.6.13.4.2 Isolated Concrete Foundation Works
A2PH1-SUB-CNot Started project-power bi.5.6.13.4.3 Concrete Column Neck Works
A2PH1-SUB-CNot Started project-power bi.5.6.13.4.4 Concrete Tie Beam Works
A2PH1-SUB-ICNot Started project-power bi.5.6.13.4.2 Isolated Concrete Foundation Works
A2PH1-SUB-ICNot Started project-power bi.5.6.13.4.2 Isolated Concrete Foundation Works
A2PH1-SUB-BNot Started project-power bi.5.6.13.4.1 Blinding Concrete Works
A2PH1-SUB-ICNot Started project-power bi.5.6.13.4.2 Isolated Concrete Foundation Works
A2PH1-SUB-ICNot Started project-power bi.5.6.13.4.2 Isolated Concrete Foundation Works
A2PH1-SUB-CNot Started project-power bi.5.6.13.4.3 Concrete Column Neck Works
A2PH1-SUB-CNot Started project-power bi.5.6.13.4.3 Concrete Column Neck Works
A2PH1-SUB-CNot Started project-power bi.5.6.13.4.3 Concrete Column Neck Works
A2PH1-SUB-CNot Started project-power bi.5.6.13.4.4 Concrete Tie Beam Works
A2PH1-SUB-CNot Started project-power bi.5.6.13.4.4 Concrete Tie Beam Works
A2PH1-SUB-CNot Started project-power bi.5.6.13.4.4 Concrete Tie Beam Works
A2PH1-SUB-CNot Started project-power bi.5.6.13.4.6 Concrete Retaining Walls Footing
A2PH1-SUB-CNot Started project-power bi.5.6.13.4.6 Concrete Retaining Walls Footing
A2PH1-SUB-CNot Started project-power bi.5.6.13.4.6 Concrete Retaining Walls Footing
A2PH1-SUB-CNot Started project-power bi.5.6.13.4.6 Concrete Retaining Walls Footing
A2PH1-SUB-CNot Started project-power bi.5.6.13.4.6 Concrete Retaining Walls Footing
A2PH1-SUB-CNot Started project-power bi.5.6.13.4.6 Concrete Retaining Walls Footing
A2PH1-SUB-MNot Started project-power bi.5.6.13.4.9 Mechanical Backfill Works
A2PH1-SUB-BNot Started project-power bi.5.6.13.4.1 Blinding Concrete Works
A2PH1-SUB-CNot Started project-power bi.5.6.13.4.6 Concrete Retaining Walls Footing
A2PH1-SUB-CNot Started project-power bi.5.6.13.4.6 Concrete Retaining Walls Footing
A2PH1-SUB-CNot Started project-power bi.5.6.13.4.6 Concrete Retaining Walls Footing
A2PH1-SUB-CNot Started project-power bi.5.6.13.4.6 Concrete Retaining Walls Footing
A2PH1-MEP-1Not Started project-power bi.5.6.13.4.8 MEP Works
A2PH1-CON-SNot Started project-power bi.5.6.13.4.10 Slab on Grade Works
A2PH1-CON-SNot Started project-power bi.5.6.13.4.10 Slab on Grade Works
A2PH1-CON-SNot Started project-power bi.5.6.13.4.10 Slab on Grade Works
A2PH1-CON-SNot Started project-power bi.5.6.13.4.10 Slab on Grade Works
A2PH1-CON-ANot Started project-power bi.5.6.13.4.5 Asphalt Paving Works (Work by Subco
A2PH1-CON-ANot Started project-power bi.5.6.13.4.5 Asphalt Paving Works (Work by Subco
A2PH1-CON-ANot Started project-power bi.5.6.13.4.5 Asphalt Paving Works (Work by Subco
A2PH1-CON-ANot Started project-power bi.5.6.13.4.5 Asphalt Paving Works (Work by Subco
A2PH1-SUB-S Not Started project-power bi.5.6.13.4.11 Concrete Shear Wall /Sumpit Founda
A2PH1-SUB-S Not Started project-power bi.5.6.13.4.11 Concrete Shear Wall /Sumpit Founda
A2PH1-SUB-S Not Started project-power bi.5.6.13.4.11 Concrete Shear Wall /Sumpit Founda
A2PH1-SUB-S Not Started project-power bi.5.6.13.4.11 Concrete Shear Wall /Sumpit Founda
A2PH1-SUB-S Not Started project-power bi.5.6.13.4.11 Concrete Shear Wall /Sumpit Founda
A2PH1-SUB-S Not Started project-power bi.5.6.13.4.11 Concrete Shear Wall /Sumpit Founda
A2PH1-SUB-S Not Started project-power bi.5.6.13.4.11 Concrete Shear Wall /Sumpit Founda
A2PH1-SUB-CNot Started project-power bi.5.6.13.4.3 Concrete Column Neck Works
A2PH1-SUB-ICNot Started project-power bi.5.6.13.4.2 Isolated Concrete Foundation Works
A2PH1-SUB-S Not Started project-power bi.5.6.13.4.11 Concrete Shear Wall /Sumpit Founda
A2PH1-SUB-CNot Started project-power bi.5.6.13.4.4 Concrete Tie Beam Works
A2PH1-SUB-CNot Started project-power bi.5.6.13.4.6 Concrete Retaining Walls Footing
A2PH1-CON-SNot Started project-power bi.5.6.13.4.10 Slab on Grade Works
A2PH1-MEP-1Not Started project-power bi.5.6.13.4.8 MEP Works
A3PH1-SUB-BNot Started project-power bi.5.6.4.4.1 Blinding Concrete Works
A3PH1-SUB-BNot Started project-power bi.5.6.4.4.1 Blinding Concrete Works
A3PH1-SUB-BNot Started project-power bi.5.6.4.4.1 Blinding Concrete Works
A3PH1-SUB-ICNot Started project-power bi.5.6.4.4.2 Isolated Concrete Foundation Works
A3PH1-CON-SNot Started project-power bi.5.6.4.4.10 Slab on Grade Works
A3PH1-MEP-1Not Started project-power bi.5.6.4.4.8 MEP Works
A3PH1-SUB-MNot Started project-power bi.5.6.4.4.9 Mechanical Backfill Works
A3PH1-SUB-BNot Started project-power bi.5.6.4.4.1 Blinding Concrete Works
A3PH1-SUB-ICNot Started project-power bi.5.6.4.4.2 Isolated Concrete Foundation Works
A3PH1-SUB-ICNot Started project-power bi.5.6.4.4.2 Isolated Concrete Foundation Works
A3PH1-SUB-CNot Started project-power bi.5.6.4.4.3 Concrete Column Neck Works
A3PH1-SUB-CNot Started project-power bi.5.6.4.4.4 Concrete Tie Beam Works
A3PH1-SUB-ICNot Started project-power bi.5.6.4.4.2 Isolated Concrete Foundation Works
A3PH1-SUB-ICNot Started project-power bi.5.6.4.4.2 Isolated Concrete Foundation Works
A3PH1-SUB-BNot Started project-power bi.5.6.4.4.1 Blinding Concrete Works
A3PH1-SUB-ICNot Started project-power bi.5.6.4.4.2 Isolated Concrete Foundation Works
A3PH1-SUB-ICNot Started project-power bi.5.6.4.4.2 Isolated Concrete Foundation Works
A3PH1-SUB-CNot Started project-power bi.5.6.4.4.3 Concrete Column Neck Works
A3PH1-SUB-CNot Started project-power bi.5.6.4.4.3 Concrete Column Neck Works
A3PH1-SUB-CNot Started project-power bi.5.6.4.4.3 Concrete Column Neck Works
A3PH1-SUB-CNot Started project-power bi.5.6.4.4.4 Concrete Tie Beam Works
A3PH1-SUB-CNot Started project-power bi.5.6.4.4.4 Concrete Tie Beam Works
A3PH1-SUB-CNot Started project-power bi.5.6.4.4.4 Concrete Tie Beam Works
A3PH1-SUB-MNot Started project-power bi.5.6.4.4.9 Mechanical Backfill Works
A3PH1-SUB-BNot Started project-power bi.5.6.4.4.1 Blinding Concrete Works
A3PH1-MEP-1Not Started project-power bi.5.6.4.4.8 MEP Works
A3PH1-CON-SNot Started project-power bi.5.6.4.4.10 Slab on Grade Works
A3PH1-CON-SNot Started project-power bi.5.6.4.4.10 Slab on Grade Works
A3PH1-CON-SNot Started project-power bi.5.6.4.4.10 Slab on Grade Works
A3PH1-CON-SNot Started project-power bi.5.6.4.4.10 Slab on Grade Works
A3PH1-CON-ANot Started project-power bi.5.6.4.4.5 Asphalt Paving Works (Work by Subco
A3PH1-CON-ANot Started project-power bi.5.6.4.4.5 Asphalt Paving Works (Work by Subco
A3PH1-CON-ANot Started project-power bi.5.6.4.4.5 Asphalt Paving Works (Work by Subco
A3PH1-CON-ANot Started project-power bi.5.6.4.4.5 Asphalt Paving Works (Work by Subco
A3PH1-SUB-S Not Started project-power bi.5.6.4.4.11 Concrete Shear Wall /Sumpit Founda
A3PH1-SUB-S Not Started project-power bi.5.6.4.4.11 Concrete Shear Wall /Sumpit Founda
A3PH1-SUB-S Not Started project-power bi.5.6.4.4.11 Concrete Shear Wall /Sumpit Founda
A3PH1-SUB-S Not Started project-power bi.5.6.4.4.11 Concrete Shear Wall /Sumpit Founda
A3PH1-SUB-S Not Started project-power bi.5.6.4.4.11 Concrete Shear Wall /Sumpit Founda
A3PH1-SUB-S Not Started project-power bi.5.6.4.4.11 Concrete Shear Wall /Sumpit Founda
A3PH1-SUB-S Not Started project-power bi.5.6.4.4.11 Concrete Shear Wall /Sumpit Founda
A3PH1-SUB-CNot Started project-power bi.5.6.4.4.3 Concrete Column Neck Works
A3PH1-SUB-ICNot Started project-power bi.5.6.4.4.2 Isolated Concrete Foundation Works
A3PH1-SUB-S Not Started project-power bi.5.6.4.4.11 Concrete Shear Wall /Sumpit Founda
A3PH1-SUB-CNot Started project-power bi.5.6.4.4.4 Concrete Tie Beam Works
A3PH1-CON-SNot Started project-power bi.5.6.4.4.10 Slab on Grade Works
A3PH1-MEP-1Not Started project-power bi.5.6.4.4.8 MEP Works
A3PH1-GF-FF-Not Started project-power bi.5.6.4.13.2.5 Column - Ground Floor to First Floor
A3PH1-GF-FF-Not Started project-power bi.5.6.4.13.2.5 Column - Ground Floor to First Floor
A3PH1-GF-FF-Not Started project-power bi.5.6.4.13.2.5 Column - Ground Floor to First Floor
A3PH1-GF-FF-Not Started project-power bi.5.6.4.13.2.5 Column - Ground Floor to First Floor
A3PH1-GF-FF-Not Started project-power bi.5.6.4.13.2.5 Column - Ground Floor to First Floor
A3PH1-GF-FF-Not Started project-power bi.5.6.4.13.2.6 Beams - 1st Floor
A3PH1-GF-FF-Not Started project-power bi.5.6.4.13.2.6 Beams - 1st Floor
A3PH1-GF-FF-Not Started project-power bi.5.6.4.13.2.6 Beams - 1st Floor
A3PH1-GF-FF-Not Started project-power bi.5.6.4.13.2.6 Beams - 1st Floor
A3PH1-GF-FF-Not Started project-power bi.5.6.4.13.2.6 Beams - 1st Floor
A3PH1-GF-FF-Not Started project-power bi.5.6.4.13.2.6 Beams - 1st Floor
A3PH1-GF-FF Not Started project-power bi.5.6.4.13.2.7 Hollow Core - 1st Floor
A3PH1-GF-FF Not Started project-power bi.5.6.4.13.2.7 Hollow Core - 1st Floor
A3PH1-GF-FF Not Started project-power bi.5.6.4.13.2.7 Hollow Core - 1st Floor
A3PH1-GF-FF-Not Started project-power bi.5.6.4.13.2.8 Screed ( First Floor)
A3PH1-GF-FF-Not Started project-power bi.5.6.4.13.2.8 Screed ( First Floor)
A3PH1-GF-FF-Not Started project-power bi.5.6.4.13.2.8 Screed ( First Floor)
A3PH1-GF-FF-Not Started project-power bi.5.6.4.13.2.8 Screed ( First Floor)
A4PH1-GF-FF-Not Started project-power bi.5.6.2.13.1.5 Column - Ground Floor to First Floor
A4PH1-GF-FF-Not Started project-power bi.5.6.2.13.1.5 Column - Ground Floor to First Floor
A4PH1-GF-FF-Not Started project-power bi.5.6.2.13.1.5 Column - Ground Floor to First Floor
A4PH1-GF-FF-Not Started project-power bi.5.6.2.13.1.5 Column - Ground Floor to First Floor
A4PH1-GF-FF-Not Started project-power bi.5.6.2.13.1.5 Column - Ground Floor to First Floor
A4PH1-GF-FF-Not Started project-power bi.5.6.2.13.1.6 Beams - 1st Floor
A4PH1-GF-FF-Not Started project-power bi.5.6.2.13.1.6 Beams - 1st Floor
A4PH1-GF-FF-Not Started project-power bi.5.6.2.13.1.6 Beams - 1st Floor
A4PH1-GF-FF-Not Started project-power bi.5.6.2.13.1.6 Beams - 1st Floor
A4PH1-GF-FF-Not Started project-power bi.5.6.2.13.1.6 Beams - 1st Floor
A4PH1-GF-FF-Not Started project-power bi.5.6.2.13.1.6 Beams - 1st Floor
A4PH1-GF-FF Not Started project-power bi.5.6.2.13.1.7 Hollow Core - 1st Floor
A4PH1-GF-FF Not Started project-power bi.5.6.2.13.1.7 Hollow Core - 1st Floor
A4PH1-GF-FF Not Started project-power bi.5.6.2.13.1.7 Hollow Core - 1st Floor
A4PH1-GF-FF-Not Started project-power bi.5.6.2.13.1.8 Screed ( First Floor)
A4PH1-GF-FF-Not Started project-power bi.5.6.2.13.1.8 Screed ( First Floor)
A4PH1-GF-FF-Not Started project-power bi.5.6.2.13.1.8 Screed ( First Floor)
A4PH1-GF-FF-Not Started project-power bi.5.6.2.13.1.8 Screed ( First Floor)
A5PH1-GF-FF-Not Started project-power bi.5.6.5.13.1.5 Column - Ground Floor to First Floor
A5PH1-GF-FF-Not Started project-power bi.5.6.5.13.1.5 Column - Ground Floor to First Floor
A5PH1-GF-FF-Not Started project-power bi.5.6.5.13.1.5 Column - Ground Floor to First Floor
A5PH1-GF-FF-Not Started project-power bi.5.6.5.13.1.5 Column - Ground Floor to First Floor
A5PH1-GF-FF-Not Started project-power bi.5.6.5.13.1.5 Column - Ground Floor to First Floor
A5PH1-GF-FF-Not Started project-power bi.5.6.5.13.1.6 Beams - 1st Floor
A5PH1-GF-FF-Not Started project-power bi.5.6.5.13.1.6 Beams - 1st Floor
A5PH1-GF-FF-Not Started project-power bi.5.6.5.13.1.6 Beams - 1st Floor
A5PH1-GF-FF-Not Started project-power bi.5.6.5.13.1.6 Beams - 1st Floor
A5PH1-GF-FF-Not Started project-power bi.5.6.5.13.1.6 Beams - 1st Floor
A5PH1-GF-FF-Not Started project-power bi.5.6.5.13.1.6 Beams - 1st Floor
A5PH1-GF-FF Not Started project-power bi.5.6.5.13.1.7 Hollow Core - 1st Floor
A5PH1-GF-FF Not Started project-power bi.5.6.5.13.1.7 Hollow Core - 1st Floor
A5PH1-GF-FF Not Started project-power bi.5.6.5.13.1.7 Hollow Core - 1st Floor
A5PH1-GF-FF-Not Started project-power bi.5.6.5.13.1.8 Screed ( First Floor)
A5PH1-GF-FF-Not Started project-power bi.5.6.5.13.1.8 Screed ( First Floor)
A5PH1-GF-FF-Not Started project-power bi.5.6.5.13.1.8 Screed ( First Floor)
A5PH1-GF-FF-Not Started project-power bi.5.6.5.13.1.8 Screed ( First Floor)
A3PH1-SUB-CNot Started project-power bi.5.6.4.4.6 Concrete Retaining Walls Footing
A3PH1-SUB-CNot Started project-power bi.5.6.4.4.6 Concrete Retaining Walls Footing
A3PH1-SUB-CNot Started project-power bi.5.6.4.4.6 Concrete Retaining Walls Footing
A3PH1-SUB-CNot Started project-power bi.5.6.4.4.6 Concrete Retaining Walls Footing
A3PH1-SUB-CNot Started project-power bi.5.6.4.4.6 Concrete Retaining Walls Footing
A3PH1-SUB-CNot Started project-power bi.5.6.4.4.6 Concrete Retaining Walls Footing
A3PH1-SUB-CNot Started project-power bi.5.6.4.4.6 Concrete Retaining Walls Footing
A3PH1-SUB-CNot Started project-power bi.5.6.4.4.6 Concrete Retaining Walls Footing
A3PH1-SUB-CNot Started project-power bi.5.6.4.4.6 Concrete Retaining Walls Footing
A3PH1-SUB-CNot Started project-power bi.5.6.4.4.6 Concrete Retaining Walls Footing
A3PH1-SUB-CNot Started project-power bi.5.6.4.4.6 Concrete Retaining Walls Footing
A3PH1-SUB-CNot Started project-power bi.5.6.4.4.6 Concrete Retaining Walls Footing
A1PH1-CRW-RNot Started project-power bi.5.6.1.13.13 Retaining Wall Footing to GF
A1PH1-CRW-RNot Started project-power bi.5.6.1.13.13 Retaining Wall Footing to GF
A1PH1-CRW-RNot Started project-power bi.5.6.1.13.13 Retaining Wall Footing to GF
A1PH1-CRW-RNot Started project-power bi.5.6.1.13.13 Retaining Wall Footing to GF
A1PH1-CRW-RNot Started project-power bi.5.6.1.13.13 Retaining Wall Footing to GF
A1PH1-CRW-RNot Started project-power bi.5.6.1.13.13 Retaining Wall Footing to GF
A1PH1-CRW-RNot Started project-power bi.5.6.1.13.13 Retaining Wall Footing to GF
A1PH1-CRW-RNot Started project-power bi.5.6.1.13.13 Retaining Wall Footing to GF
A2PH1-CRW-RNot Started project-power bi.5.6.13.13.13 Retaining Wall Footing to GF
A2PH1-CRW-RNot Started project-power bi.5.6.13.13.13 Retaining Wall Footing to GF
A2PH1-CRW-RNot Started project-power bi.5.6.13.13.13 Retaining Wall Footing to GF
A2PH1-CRW-RNot Started project-power bi.5.6.13.13.13 Retaining Wall Footing to GF
A2PH1-CRW-RNot Started project-power bi.5.6.13.13.13 Retaining Wall Footing to GF
A2PH1-CRW-RNot Started project-power bi.5.6.13.13.13 Retaining Wall Footing to GF
A2PH1-CRW-RNot Started project-power bi.5.6.13.13.13 Retaining Wall Footing to GF
A2PH1-CRW-RNot Started project-power bi.5.6.13.13.13 Retaining Wall Footing to GF
A3PH1-CRW-RNot Started project-power bi.5.6.4.13.13 Retaining Wall Footing to GF
A3PH1-CRW-RNot Started project-power bi.5.6.4.13.13 Retaining Wall Footing to GF
A3PH1-CRW-RNot Started project-power bi.5.6.4.13.13 Retaining Wall Footing to GF
A3PH1-CRW-RNot Started project-power bi.5.6.4.13.13 Retaining Wall Footing to GF
A3PH1-CRW-RNot Started project-power bi.5.6.4.13.13 Retaining Wall Footing to GF
A3PH1-CRW-RNot Started project-power bi.5.6.4.13.13 Retaining Wall Footing to GF
A3PH1-CRW-RNot Started project-power bi.5.6.4.13.13 Retaining Wall Footing to GF
A3PH1-CRW-RNot Started project-power bi.5.6.4.13.13 Retaining Wall Footing to GF
A4PH1-CRW-RNot Started project-power bi.5.6.2.13.13 Retaining Wall Footing to GF
A4PH1-CRW-RNot Started project-power bi.5.6.2.13.13 Retaining Wall Footing to GF
A4PH1-CRW-RNot Started project-power bi.5.6.2.13.13 Retaining Wall Footing to GF
A4PH1-CRW-RNot Started project-power bi.5.6.2.13.13 Retaining Wall Footing to GF
A4PH1-CRW-RNot Started project-power bi.5.6.2.13.13 Retaining Wall Footing to GF
A4PH1-CRW-RNot Started project-power bi.5.6.2.13.13 Retaining Wall Footing to GF
A4PH1-CRW-RNot Started project-power bi.5.6.2.13.13 Retaining Wall Footing to GF
A4PH1-CRW-RNot Started project-power bi.5.6.2.13.13 Retaining Wall Footing to GF
CONS-MH01-1Not Started project-power bi.5.13.11 Construction of Manhole
CONS-MH01-1Not Started project-power bi.5.13.11 Construction of Manhole
ENG-1130 Not Started project-power bi.4.3.2 IFC Drawing Package for Phase 1
SHOP-DR1000Not Started project-power bi.4.10.5.1 Shop Drawing for Area 1
SHOP-DR1010Not Started project-power bi.4.10.5.1 Shop Drawing for Area 1
SHOP-DR1020Not Started project-power bi.4.10.5.2 Shop Drawing for Area 2
SHOP-DR1030Not Started project-power bi.4.10.5.2 Shop Drawing for Area 2
SHOP-DR1040Not Started project-power bi.4.10.5.3 Shop Drawing for Area 3
SHOP-DR1050Not Started project-power bi.4.10.5.3 Shop Drawing for Area 3
SHOP-DR1060Not Started project-power bi.4.10.5.4 Shop Drawing for Area 4
SHOP-DR1070Not Started project-power bi.4.10.5.4 Shop Drawing for Area 4
SHOP-DR1080Not Started project-power bi.4.10.5.5 Shop Drawing for Area 5
SHOP-DR1090Not Started project-power bi.4.10.5.5 Shop Drawing for Area 5
PROC-C1480 Not Started project-power bi.11.8.1.9 Water Proofing ( Elastroplastomeri
PROC-C1490 Not Started project-power bi.11.8.1.9 Water Proofing ( Elastroplastomeri
PROC-C1500 Not Started project-power bi.11.8.1.9 Water Proofing ( Elastroplastomeri
PROC-C1510 Not Started project-power bi.11.8.1.9 Water Proofing ( Elastroplastomeri
PROC-C1520 Not Started project-power bi.11.8.1.9 Water Proofing ( Elastroplastomeri
PROC-C1530 Not Started project-power bi.11.8.1.9 Water Proofing ( Elastroplastomeri
PROC-C1540 Not Started project-power bi.11.8.1.10 Curing Compound
PROC-C1550 Not Started project-power bi.11.8.1.10 Curing Compound
PROC-C1560 Not Started project-power bi.11.8.1.10 Curing Compound
PROC-C1570 Not Started project-power bi.11.8.1.10 Curing Compound
PROC-C1580 Not Started project-power bi.11.8.1.10 Curing Compound
PROC-C1590 Not Started project-power bi.11.8.1.10 Curing Compound
PROC-C1600 Not Started project-power bi.11.8.1.11 Concrete Repair
PROC-C1610 Not Started project-power bi.11.8.1.11 Concrete Repair
PROC-C1620 Not Started project-power bi.11.8.1.11 Concrete Repair
PROC-C1630 Not Started project-power bi.11.8.1.11 Concrete Repair
PROC-C1640 Not Started project-power bi.11.8.1.11 Concrete Repair
PROC-C1650 Not Started project-power bi.11.8.1.11 Concrete Repair
A4PH1-GF-FF-Not Started project-power bi.5.6.2.13.1.1 Post Tension - 1st Floor
A4PH1-GF-FF-Not Started project-power bi.5.6.2.13.1.1 Post Tension - 1st Floor
A4PH1-GF-FF-Not Started project-power bi.5.6.2.13.1.1 Post Tension - 1st Floor
A4PH1-GF-FF-Not Started project-power bi.5.6.2.13.1.1 Post Tension - 1st Floor
A3PH1-GF-FF Not Started project-power bi.5.6.4.13.2.1 Shear Wall -Ground Floor to First Flo
A3PH1-GF-FF Not Started project-power bi.5.6.4.13.2.1 Shear Wall -Ground Floor to First Flo
A3PH1-GF-FF Not Started project-power bi.5.6.4.13.2.1 Shear Wall -Ground Floor to First Flo
A4PH1-GF-FF Not Started project-power bi.5.6.2.13.1.2 Shear Wall -Ground Floor to First Flo
A4PH1-GF-FF Not Started project-power bi.5.6.2.13.1.2 Shear Wall -Ground Floor to First Flo
A4PH1-GF-FF Not Started project-power bi.5.6.2.13.1.2 Shear Wall -Ground Floor to First Flo
SCPH1-LB-TF- Not Started project-power bi.5.13.13.4 Stair Case
SCPH1-LB-TF- Not Started project-power bi.5.13.13.4 Stair Case
SCPH1-LB-TF- Not Started project-power bi.5.13.13.4 Stair Case
SCPH1-LB-TF- Not Started project-power bi.5.13.13.4 Stair Case
SCPH1-LB-TF- Not Started project-power bi.5.13.13.4 Stair Case
SCPH1-LB-TF- Not Started project-power bi.5.13.13.4 Stair Case
SCPH1-LB-TF- Not Started project-power bi.5.13.13.4 Stair Case
SCPH1-LB-TF- Not Started project-power bi.5.13.13.4 Stair Case
SCPH1-LB-TF- Not Started project-power bi.5.13.13.4 Stair Case
SCPH1-LB-TF- Not Started project-power bi.5.13.13.4 Stair Case
SCPH1-LB-TF- Not Started project-power bi.5.13.13.4 Stair Case
SCPH1-LB-TF- Not Started project-power bi.5.13.13.4 Stair Case
SCPH1-LB-TF- Not Started project-power bi.5.13.13.4 Stair Case
SCPH1-LB-TF- Not Started project-power bi.5.13.13.4 Stair Case
SCPH1-LB-TF- Not Started project-power bi.5.13.13.4 Stair Case
SCPH1-LB-TF- Not Started project-power bi.5.13.13.4 Stair Case
SCPH1-LB-TF- Not Started project-power bi.5.13.13.4 Stair Case
SCPH1-LB-TF- Not Started project-power bi.5.13.13.4 Stair Case
A1PH1-SUB-CNot Started project-power bi.5.6.1.4.4 Concrete Tie Beam Works
A2PH1-SUB-CNot Started project-power bi.5.6.13.4.4 Concrete Tie Beam Works
A3PH1-SUB-CNot Started project-power bi.5.6.4.4.4 Concrete Tie Beam Works
A1PH1-SUB-MNot Started project-power bi.5.6.1.4.9 Mechanical Backfill Works
A1PH1-SUB-MNot Started project-power bi.5.6.1.4.9 Mechanical Backfill Works
A2PH1-SUB-MNot Started project-power bi.5.6.13.4.9 Mechanical Backfill Works
A2PH1-SUB-MNot Started project-power bi.5.6.13.4.9 Mechanical Backfill Works
A3PH1-SUB-MNot Started project-power bi.5.6.4.4.9 Mechanical Backfill Works
A3PH1-SUB-MNot Started project-power bi.5.6.4.4.9 Mechanical Backfill Works
A1PH1-SUB-T-Not Started project-power bi.5.6.1.4.7.2 Post Tension Basement Floor Slab
PH1-SUB-RA- Not Started project-power bi.5.13.13.1 Ramp
PH1-SUB-RA- Not Started project-power bi.5.13.13.1 Ramp
PH1-SUB-RA- Not Started project-power bi.5.13.13.1 Ramp
PH1-SUB-RA- Not Started project-power bi.5.13.13.1 Ramp
MOB-1050 Not Started project-power bi.5.2.2 Laydown Area
A4PH1-SUB-BNot Started project-power bi.5.6.2.4.1 Blinding Concrete Works
A4PH1-SUB-BNot Started project-power bi.5.6.2.4.1 Blinding Concrete Works
A4PH1-SUB-BNot Started project-power bi.5.6.2.4.1 Blinding Concrete Works
A4PH1-SUB-ICNot Started project-power bi.5.6.2.4.2 Isolated Concrete Foundation Works
A4PH1-CON-SNot Started project-power bi.5.6.2.4.10 Slab on Grade Works
A4PH1-MEP-1Not Started project-power bi.5.6.2.4.8 MEP Works
A4PH1-SUB-MNot Started project-power bi.5.6.2.4.9 Mechanical Backfill Works
A4PH1-SUB-BNot Started project-power bi.5.6.2.4.1 Blinding Concrete Works
A4PH1-SUB-ICNot Started project-power bi.5.6.2.4.2 Isolated Concrete Foundation Works
A4PH1-SUB-ICNot Started project-power bi.5.6.2.4.2 Isolated Concrete Foundation Works
A4PH1-SUB-CNot Started project-power bi.5.6.2.4.3 Concrete Column Neck Works
A4PH1-SUB-CNot Started project-power bi.5.6.2.4.4 Concrete Tie Beam Works
A4PH1-SUB-ICNot Started project-power bi.5.6.2.4.2 Isolated Concrete Foundation Works
A4PH1-SUB-ICNot Started project-power bi.5.6.2.4.2 Isolated Concrete Foundation Works
A4PH1-SUB-BNot Started project-power bi.5.6.2.4.1 Blinding Concrete Works
A4PH1-SUB-ICNot Started project-power bi.5.6.2.4.2 Isolated Concrete Foundation Works
A4PH1-SUB-ICNot Started project-power bi.5.6.2.4.2 Isolated Concrete Foundation Works
A4PH1-SUB-CNot Started project-power bi.5.6.2.4.3 Concrete Column Neck Works
A4PH1-SUB-CNot Started project-power bi.5.6.2.4.3 Concrete Column Neck Works
A4PH1-SUB-CNot Started project-power bi.5.6.2.4.3 Concrete Column Neck Works
A4PH1-SUB-CNot Started project-power bi.5.6.2.4.4 Concrete Tie Beam Works
A4PH1-SUB-CNot Started project-power bi.5.6.2.4.4 Concrete Tie Beam Works
A4PH1-SUB-CNot Started project-power bi.5.6.2.4.4 Concrete Tie Beam Works
A4PH1-SUB-MNot Started project-power bi.5.6.2.4.9 Mechanical Backfill Works
A4PH1-SUB-BNot Started project-power bi.5.6.2.4.1 Blinding Concrete Works
A4PH1-MEP-1Not Started project-power bi.5.6.2.4.8 MEP Works
A4PH1-CON-SNot Started project-power bi.5.6.2.4.10 Slab on Grade Works
A4PH1-CON-SNot Started project-power bi.5.6.2.4.10 Slab on Grade Works
A4PH1-CON-SNot Started project-power bi.5.6.2.4.10 Slab on Grade Works
A4PH1-CON-SNot Started project-power bi.5.6.2.4.10 Slab on Grade Works
A4PH1-CON-ANot Started project-power bi.5.6.2.4.5 Asphalt Paving Works (Work by Subco
A4PH1-CON-ANot Started project-power bi.5.6.2.4.5 Asphalt Paving Works (Work by Subco
A4PH1-CON-ANot Started project-power bi.5.6.2.4.5 Asphalt Paving Works (Work by Subco
A4PH1-CON-ANot Started project-power bi.5.6.2.4.5 Asphalt Paving Works (Work by Subco
A4PH1-SUB-S Not Started project-power bi.5.6.2.4.11 Concrete Shear Wall /Sumpit Founda
A4PH1-SUB-S Not Started project-power bi.5.6.2.4.11 Concrete Shear Wall /Sumpit Founda
A4PH1-SUB-S Not Started project-power bi.5.6.2.4.11 Concrete Shear Wall /Sumpit Founda
A4PH1-SUB-S Not Started project-power bi.5.6.2.4.11 Concrete Shear Wall /Sumpit Founda
A4PH1-SUB-S Not Started project-power bi.5.6.2.4.11 Concrete Shear Wall /Sumpit Founda
A4PH1-SUB-S Not Started project-power bi.5.6.2.4.11 Concrete Shear Wall /Sumpit Founda
A4PH1-SUB-S Not Started project-power bi.5.6.2.4.11 Concrete Shear Wall /Sumpit Founda
A4PH1-SUB-CNot Started project-power bi.5.6.2.4.3 Concrete Column Neck Works
A4PH1-SUB-ICNot Started project-power bi.5.6.2.4.2 Isolated Concrete Foundation Works
A4PH1-SUB-S Not Started project-power bi.5.6.2.4.11 Concrete Shear Wall /Sumpit Founda
A4PH1-SUB-CNot Started project-power bi.5.6.2.4.4 Concrete Tie Beam Works
A4PH1-CON-SNot Started project-power bi.5.6.2.4.10 Slab on Grade Works
A4PH1-MEP-1Not Started project-power bi.5.6.2.4.8 MEP Works
A5PH1-SUB-BNot Started project-power bi.5.6.5.4.1 Blinding Concrete Works
A5PH1-SUB-BNot Started project-power bi.5.6.5.4.1 Blinding Concrete Works
A5PH1-SUB-BNot Started project-power bi.5.6.5.4.1 Blinding Concrete Works
A5PH1-SUB-ICNot Started project-power bi.5.6.5.4.2 Isolated Concrete Foundation Works
A5PH1-CON-SNot Started project-power bi.5.6.5.4.10 Slab on Grade Works
A5PH1-MEP-1Not Started project-power bi.5.6.5.4.8 MEP Works
A5PH1-SUB-MNot Started project-power bi.5.6.5.4.9 Mechanical Backfill Works
A5PH1-SUB-BNot Started project-power bi.5.6.5.4.1 Blinding Concrete Works
A5PH1-SUB-ICNot Started project-power bi.5.6.5.4.2 Isolated Concrete Foundation Works
A5PH1-SUB-ICNot Started project-power bi.5.6.5.4.2 Isolated Concrete Foundation Works
A5PH1-SUB-CNot Started project-power bi.5.6.5.4.3 Concrete Column Neck Works
A5PH1-SUB-CNot Started project-power bi.5.6.5.4.4 Concrete Tie Beam Works
A5PH1-SUB-ICNot Started project-power bi.5.6.5.4.2 Isolated Concrete Foundation Works
A5PH1-SUB-ICNot Started project-power bi.5.6.5.4.2 Isolated Concrete Foundation Works
A5PH1-SUB-BNot Started project-power bi.5.6.5.4.1 Blinding Concrete Works
A5PH1-SUB-ICNot Started project-power bi.5.6.5.4.2 Isolated Concrete Foundation Works
A5PH1-SUB-ICNot Started project-power bi.5.6.5.4.2 Isolated Concrete Foundation Works
A5PH1-SUB-CNot Started project-power bi.5.6.5.4.3 Concrete Column Neck Works
A5PH1-SUB-CNot Started project-power bi.5.6.5.4.3 Concrete Column Neck Works
A5PH1-SUB-CNot Started project-power bi.5.6.5.4.3 Concrete Column Neck Works
A5PH1-SUB-CNot Started project-power bi.5.6.5.4.4 Concrete Tie Beam Works
A5PH1-SUB-CNot Started project-power bi.5.6.5.4.4 Concrete Tie Beam Works
A5PH1-SUB-CNot Started project-power bi.5.6.5.4.4 Concrete Tie Beam Works
A5PH1-SUB-MNot Started project-power bi.5.6.5.4.9 Mechanical Backfill Works
A5PH1-SUB-BNot Started project-power bi.5.6.5.4.1 Blinding Concrete Works
A5PH1-SUB-UNot Started project-power bi.5.6.5.4.12 subsoil Perforated Pipes
A5PH1-SUB-UNot Started project-power bi.5.6.5.4.12 subsoil Perforated Pipes
A5PH1-MEP-1Not Started project-power bi.5.6.5.4.8 MEP Works
A5PH1-SUB-UNot Started project-power bi.5.6.5.4.12 subsoil Perforated Pipes
A5PH1-CON-SNot Started project-power bi.5.6.5.4.10 Slab on Grade Works
A5PH1-CON-SNot Started project-power bi.5.6.5.4.10 Slab on Grade Works
A5PH1-CON-SNot Started project-power bi.5.6.5.4.10 Slab on Grade Works
A5PH1-CON-SNot Started project-power bi.5.6.5.4.10 Slab on Grade Works
A5PH1-CON-ANot Started project-power bi.5.6.5.4.5 Asphalt Paving Works (Work by Subco
A5PH1-CON-ANot Started project-power bi.5.6.5.4.5 Asphalt Paving Works (Work by Subco
A5PH1-CON-ANot Started project-power bi.5.6.5.4.5 Asphalt Paving Works (Work by Subco
A5PH1-CON-ANot Started project-power bi.5.6.5.4.5 Asphalt Paving Works (Work by Subco
A5PH1-SUB-UNot Started project-power bi.5.6.5.4.12 subsoil Perforated Pipes
A5PH1-SUB-S Not Started project-power bi.5.6.5.4.11 Concrete Shear Wall /Sumpit Founda
A5PH1-SUB-S Not Started project-power bi.5.6.5.4.11 Concrete Shear Wall /Sumpit Founda
A5PH1-SUB-S Not Started project-power bi.5.6.5.4.11 Concrete Shear Wall /Sumpit Founda
A5PH1-SUB-S Not Started project-power bi.5.6.5.4.11 Concrete Shear Wall /Sumpit Founda
A5PH1-SUB-S Not Started project-power bi.5.6.5.4.11 Concrete Shear Wall /Sumpit Founda
A5PH1-SUB-S Not Started project-power bi.5.6.5.4.11 Concrete Shear Wall /Sumpit Founda
A5PH1-SUB-S Not Started project-power bi.5.6.5.4.11 Concrete Shear Wall /Sumpit Founda
A5PH1-SUB-CNot Started project-power bi.5.6.5.4.3 Concrete Column Neck Works
A5PH1-SUB-ICNot Started project-power bi.5.6.5.4.2 Isolated Concrete Foundation Works
A5PH1-SUB-S Not Started project-power bi.5.6.5.4.11 Concrete Shear Wall /Sumpit Founda
A5PH1-SUB-CNot Started project-power bi.5.6.5.4.4 Concrete Tie Beam Works
A5PH1-CON-SNot Started project-power bi.5.6.5.4.10 Slab on Grade Works
A5PH1-MEP-1Not Started project-power bi.5.6.5.4.8 MEP Works
A1PH1-LB-GF-Not Started project-power bi.5.6.1.13.14.1 Column -Basement to Ground Floor
A1PH1-LB-GF-Not Started project-power bi.5.6.1.13.14.1 Column -Basement to Ground Floor
A1PH1-LB-GF-Not Started project-power bi.5.6.1.13.14.1 Column -Basement to Ground Floor
A1PH1-LB-GF-Not Started project-power bi.5.6.1.13.14.1 Column -Basement to Ground Floor
A1PH1-LB-GF-Not Started project-power bi.5.6.1.13.14.1 Column -Basement to Ground Floor
A1PH1-LB-GF-Not Started project-power bi.5.6.1.13.14.2 Beams - Ground Floor
A1PH1-LB-GF-Not Started project-power bi.5.6.1.13.14.2 Beams - Ground Floor
A1PH1-LB-GF-Not Started project-power bi.5.6.1.13.14.2 Beams - Ground Floor
A1PH1-LB-GF-Not Started project-power bi.5.6.1.13.14.2 Beams - Ground Floor
A1PH1-LB-GF-Not Started project-power bi.5.6.1.13.14.2 Beams - Ground Floor
A1PH1-LB-GF-Not Started project-power bi.5.6.1.13.14.2 Beams - Ground Floor
A1PH1-LB-GF Not Started project-power bi.5.6.1.13.14.3 Hollow Core - Ground Floor
A1PH1-LB-GF Not Started project-power bi.5.6.1.13.14.3 Hollow Core - Ground Floor
A1PH1-LB-GF Not Started project-power bi.5.6.1.13.14.3 Hollow Core - Ground Floor
A1PH1-LB-GF-Not Started project-power bi.5.6.1.13.14.4 Screed ( Ground Floor)
A1PH1-LB-GF-Not Started project-power bi.5.6.1.13.14.4 Screed ( Ground Floor)
A1PH1-LB-GF-Not Started project-power bi.5.6.1.13.14.4 Screed ( Ground Floor)
A1PH1-LB-GF-Not Started project-power bi.5.6.1.13.14.4 Screed ( Ground Floor)
A2PH1-LB-GF-Not Started project-power bi.5.6.13.13.14.1 Column -Basement to Ground Floor
A2PH1-LB-GF-Not Started project-power bi.5.6.13.13.14.1 Column -Basement to Ground Floor
A2PH1-LB-GF-Not Started project-power bi.5.6.13.13.14.1 Column -Basement to Ground Floor
A2PH1-LB-GF-Not Started project-power bi.5.6.13.13.14.1 Column -Basement to Ground Floor
A2PH1-LB-GF-Not Started project-power bi.5.6.13.13.14.1 Column -Basement to Ground Floor
A2PH1-LB-GF-Not Started project-power bi.5.6.13.13.14.2 Beams - Ground Floor
A2PH1-LB-GF-Not Started project-power bi.5.6.13.13.14.2 Beams - Ground Floor
A2PH1-LB-GF-Not Started project-power bi.5.6.13.13.14.2 Beams - Ground Floor
A2PH1-LB-GF-Not Started project-power bi.5.6.13.13.14.2 Beams - Ground Floor
A2PH1-LB-GF-Not Started project-power bi.5.6.13.13.14.2 Beams - Ground Floor
A2PH1-LB-GF-Not Started project-power bi.5.6.13.13.14.2 Beams - Ground Floor
A2PH1-LB-GF Not Started project-power bi.5.6.13.13.14.3 Hollow Core - Ground Floor
A2PH1-LB-GF Not Started project-power bi.5.6.13.13.14.3 Hollow Core - Ground Floor
A2PH1-LB-GF Not Started project-power bi.5.6.13.13.14.3 Hollow Core - Ground Floor
A2PH1-LB-GF-Not Started project-power bi.5.6.13.13.14.4 Screed ( Ground Floor)
A2PH1-LB-GF-Not Started project-power bi.5.6.13.13.14.4 Screed ( Ground Floor)
A2PH1-LB-GF-Not Started project-power bi.5.6.13.13.14.4 Screed ( Ground Floor)
A2PH1-LB-GF-Not Started project-power bi.5.6.13.13.14.4 Screed ( Ground Floor)
A3PH1-LB-GF-Not Started project-power bi.5.6.4.13.14.1 Column -Basement to Ground Floor
A3PH1-LB-GF-Not Started project-power bi.5.6.4.13.14.1 Column -Basement to Ground Floor
A3PH1-LB-GF-Not Started project-power bi.5.6.4.13.14.1 Column -Basement to Ground Floor
A3PH1-LB-GF-Not Started project-power bi.5.6.4.13.14.1 Column -Basement to Ground Floor
A3PH1-LB-GF-Not Started project-power bi.5.6.4.13.14.1 Column -Basement to Ground Floor
A3PH1-LB-GF-Not Started project-power bi.5.6.4.13.14.2 Beams - Ground Floor
A3PH1-LB-GF-Not Started project-power bi.5.6.4.13.14.2 Beams - Ground Floor
A3PH1-LB-GF-Not Started project-power bi.5.6.4.13.14.2 Beams - Ground Floor
A3PH1-LB-GF-Not Started project-power bi.5.6.4.13.14.2 Beams - Ground Floor
A3PH1-LB-GF-Not Started project-power bi.5.6.4.13.14.2 Beams - Ground Floor
A3PH1-LB-GF-Not Started project-power bi.5.6.4.13.14.2 Beams - Ground Floor
A3PH1-LB-GF Not Started project-power bi.5.6.4.13.14.3 Hollow Core - Ground Floor
A3PH1-LB-GF Not Started project-power bi.5.6.4.13.14.3 Hollow Core - Ground Floor
A3PH1-LB-GF Not Started project-power bi.5.6.4.13.14.3 Hollow Core - Ground Floor
A3PH1-LB-GF-Not Started project-power bi.5.6.4.13.14.4 Screed ( Ground Floor)
A3PH1-LB-GF-Not Started project-power bi.5.6.4.13.14.4 Screed ( Ground Floor)
A3PH1-LB-GF-Not Started project-power bi.5.6.4.13.14.4 Screed ( Ground Floor)
A3PH1-LB-GF-Not Started project-power bi.5.6.4.13.14.4 Screed ( Ground Floor)
A4PH1-LB-GF-Not Started project-power bi.5.6.2.13.14.1 Column -Basement to Ground Floor
A4PH1-LB-GF-Not Started project-power bi.5.6.2.13.14.1 Column -Basement to Ground Floor
A4PH1-LB-GF-Not Started project-power bi.5.6.2.13.14.1 Column -Basement to Ground Floor
A4PH1-LB-GF-Not Started project-power bi.5.6.2.13.14.1 Column -Basement to Ground Floor
A4PH1-LB-GF-Not Started project-power bi.5.6.2.13.14.1 Column -Basement to Ground Floor
A4PH1-LB-GF-Not Started project-power bi.5.6.2.13.14.2 Beams - Ground Floor
A4PH1-LB-GF-Not Started project-power bi.5.6.2.13.14.2 Beams - Ground Floor
A4PH1-LB-GF-Not Started project-power bi.5.6.2.13.14.2 Beams - Ground Floor
A4PH1-LB-GF-Not Started project-power bi.5.6.2.13.14.2 Beams - Ground Floor
A4PH1-LB-GF-Not Started project-power bi.5.6.2.13.14.2 Beams - Ground Floor
A4PH1-LB-GF-Not Started project-power bi.5.6.2.13.14.2 Beams - Ground Floor
A4PH1-LB-GF Not Started project-power bi.5.6.2.13.14.3 Hollow Core - Ground Floor
A4PH1-LB-GF Not Started project-power bi.5.6.2.13.14.3 Hollow Core - Ground Floor
A4PH1-LB-GF Not Started project-power bi.5.6.2.13.14.3 Hollow Core - Ground Floor
A4PH1-LB-GF-Not Started project-power bi.5.6.2.13.14.4 Screed ( Ground Floor)
A4PH1-LB-GF-Not Started project-power bi.5.6.2.13.14.4 Screed ( Ground Floor)
A4PH1-LB-GF-Not Started project-power bi.5.6.2.13.14.4 Screed ( Ground Floor)
A4PH1-LB-GF-Not Started project-power bi.5.6.2.13.14.4 Screed ( Ground Floor)
A5PH1-LB-GF-Not Started project-power bi.5.6.5.13.15.1 Column -Basement to Ground Floor
A5PH1-LB-GF-Not Started project-power bi.5.6.5.13.15.1 Column -Basement to Ground Floor
A5PH1-LB-GF-Not Started project-power bi.5.6.5.13.15.1 Column -Basement to Ground Floor
A5PH1-LB-GF-Not Started project-power bi.5.6.5.13.15.1 Column -Basement to Ground Floor
A5PH1-LB-GF-Not Started project-power bi.5.6.5.13.15.1 Column -Basement to Ground Floor
A5PH1-LB-GF-Not Started project-power bi.5.6.5.13.15.2 Beams - Ground Floor
A5PH1-LB-GF-Not Started project-power bi.5.6.5.13.15.2 Beams - Ground Floor
A5PH1-LB-GF-Not Started project-power bi.5.6.5.13.15.2 Beams - Ground Floor
A5PH1-LB-GF-Not Started project-power bi.5.6.5.13.15.2 Beams - Ground Floor
A5PH1-LB-GF-Not Started project-power bi.5.6.5.13.15.2 Beams - Ground Floor
A5PH1-LB-GF-Not Started project-power bi.5.6.5.13.15.2 Beams - Ground Floor
A5PH1-LB-GF Not Started project-power bi.5.6.5.13.15.3 Hollow Core - Ground Floor
A5PH1-LB-GF Not Started project-power bi.5.6.5.13.15.3 Hollow Core - Ground Floor
A5PH1-LB-GF Not Started project-power bi.5.6.5.13.15.3 Hollow Core - Ground Floor
A5PH1-LB-GF-Not Started project-power bi.5.6.5.13.15.4 Screed (Ground Floor)
A5PH1-LB-GF-Not Started project-power bi.5.6.5.13.15.4 Screed (Ground Floor)
A5PH1-LB-GF-Not Started project-power bi.5.6.5.13.15.4 Screed (Ground Floor)
A5PH1-LB-GF-Not Started project-power bi.5.6.5.13.15.4 Screed (Ground Floor)
A4PH1-SUB-CNot Started project-power bi.5.6.2.4.6 Concrete Retaining Walls Footing
A4PH1-SUB-CNot Started project-power bi.5.6.2.4.6 Concrete Retaining Walls Footing
A4PH1-SUB-CNot Started project-power bi.5.6.2.4.6 Concrete Retaining Walls Footing
A4PH1-SUB-CNot Started project-power bi.5.6.2.4.6 Concrete Retaining Walls Footing
A4PH1-SUB-CNot Started project-power bi.5.6.2.4.6 Concrete Retaining Walls Footing
A4PH1-SUB-CNot Started project-power bi.5.6.2.4.6 Concrete Retaining Walls Footing
A4PH1-SUB-CNot Started project-power bi.5.6.2.4.6 Concrete Retaining Walls Footing
A4PH1-SUB-CNot Started project-power bi.5.6.2.4.6 Concrete Retaining Walls Footing
A4PH1-SUB-CNot Started project-power bi.5.6.2.4.6 Concrete Retaining Walls Footing
A4PH1-SUB-CNot Started project-power bi.5.6.2.4.6 Concrete Retaining Walls Footing
A4PH1-SUB-CNot Started project-power bi.5.6.2.4.6 Concrete Retaining Walls Footing
A4PH1-SUB-CNot Started project-power bi.5.6.2.4.6 Concrete Retaining Walls Footing
A4PH1-RF-HBNot Started project-power bi.5.6.2.4.13 Raft Foundation for Hotel Building
A4PH1-RF-HBNot Started project-power bi.5.6.2.4.13 Raft Foundation for Hotel Building
A4PH1-RF-HBNot Started project-power bi.5.6.2.4.13 Raft Foundation for Hotel Building
A4PH1-RF-HBNot Started project-power bi.5.6.2.4.13 Raft Foundation for Hotel Building
A4PH1-RF-HBNot Started project-power bi.5.6.2.4.13 Raft Foundation for Hotel Building
A4PH1-RF-HBNot Started project-power bi.5.6.2.4.13 Raft Foundation for Hotel Building
A4PH1-RF-HBNot Started project-power bi.5.6.2.4.13 Raft Foundation for Hotel Building
A4PH1-RF-HBNot Started project-power bi.5.6.2.4.13 Raft Foundation for Hotel Building
A4PH1-RF-HBNot Started project-power bi.5.6.2.4.13 Raft Foundation for Hotel Building
A4PH1-RF-HBNot Started project-power bi.5.6.2.4.13 Raft Foundation for Hotel Building
A4PH1-RF-HBNot Started project-power bi.5.6.2.4.13 Raft Foundation for Hotel Building
A4PH1-RF-HBNot Started project-power bi.5.6.2.4.13 Raft Foundation for Hotel Building
A4PH1-RF-HBNot Started project-power bi.5.6.2.4.13 Raft Foundation for Hotel Building
A4PH1-RF-HBNot Started project-power bi.5.6.2.4.13 Raft Foundation for Hotel Building
A4PH1-RF-HBNot Started project-power bi.5.6.2.4.13 Raft Foundation for Hotel Building
A4PH1-RF-HBNot Started project-power bi.5.6.2.4.13 Raft Foundation for Hotel Building
A4PH1-RF-HBNot Started project-power bi.5.6.2.4.13 Raft Foundation for Hotel Building
A4PH1-RF-HBNot Started project-power bi.5.6.2.4.13 Raft Foundation for Hotel Building
A5PH1-SUB-UNot Started project-power bi.5.6.5.4.12 subsoil Perforated Pipes
A3PH1-LB-GF Not Started project-power bi.5.6.4.13.14.5 Shear Wall -Basement to Ground Flo
A3PH1-LB-GF Not Started project-power bi.5.6.4.13.14.5 Shear Wall -Basement to Ground Flo
A3PH1-LB-GF Not Started project-power bi.5.6.4.13.14.5 Shear Wall -Basement to Ground Flo
A4PH1-LB-GF-Not Started project-power bi.5.6.2.13.14.5 Post Tension - Ground Floor
A4PH1-LB-GF-Not Started project-power bi.5.6.2.13.14.5 Post Tension - Ground Floor
A4PH1-LB-GF-Not Started project-power bi.5.6.2.13.14.5 Post Tension - Ground Floor
A4PH1-LB-GF-Not Started project-power bi.5.6.2.13.14.5 Post Tension - Ground Floor
A4PH1-LB-GF Not Started project-power bi.5.6.2.13.14.6 Shear Wall -Basement to Ground Flo
A4PH1-LB-GF Not Started project-power bi.5.6.2.13.14.6 Shear Wall -Basement to Ground Flo
A4PH1-LB-GF Not Started project-power bi.5.6.2.13.14.6 Shear Wall -Basement to Ground Flo
A4PH1-SUB-CNot Started project-power bi.5.6.2.4.4 Concrete Tie Beam Works
A5PH1-SUB-CNot Started project-power bi.5.6.5.4.4 Concrete Tie Beam Works
A4PH1-SUB-MNot Started project-power bi.5.6.2.4.9 Mechanical Backfill Works
A4PH1-SUB-MNot Started project-power bi.5.6.2.4.9 Mechanical Backfill Works
A5PH1-SUB-MNot Started project-power bi.5.6.5.4.9 Mechanical Backfill Works
A5PH1-SUB-MNot Started project-power bi.5.6.5.4.9 Mechanical Backfill Works
task_name start_date end_date target_drtn_hr_cnt
Activity Name (*)Start (*)Finish Original Duration(h)
Notice to Proceed 12/1/2020 12/30/1899 0:00
Completion of Site Mobilization & Facilities 12/30/2020 12/30/1899 0:00
Completion of IFC Drawing 12/30/2020 12/30/1899 0:00
Project Completion 10/30/2021 12/30/1899 0:00
Kick of Meeting 12/10/2020 12/30/1899 0:00
Submittal of Project Sch 12/1/2020 12/1/2020 12/30/1899 0:00
Soil Stability Report 12/1/2020 12/1/2020 12/30/1899 0:00
HSE Training & Safety 12/1/2020 12/1/2020 12/30/1899 0:00
Submission of Quality Co 12/1/2020 12/1/2020 12/30/1899 0:00
Mobilization of Key Pers 12/1/2020 12/1/2020 12/30/1899 0:00
Construction of Temporar 12/8/2020 12/8/2020 12/30/1899 0:00
Construction of Site Facili 12/17/2020 12/17/2020 12/30/1899 0:00
Arrangement for Tempora 12/24/2020 12/24/2020 12/30/1899 0:00
Complete Manpower Mobi 12/30/2020 12/30/2020 12/30/1899 0:00
Area 1 12/12/2020 12/12/2020 12/30/1899 0:00
Area 2 12/12/2020 12/12/2020 12/30/1899 0:00
Area 3 12/12/2020 12/12/2020 12/30/1899 0:00
Area 4 12/21/2020 12/21/2020 12/30/1899 0:00
Survey, Layout & Survey 12/12/2020 12/12/2020 12/30/1899 0:00
Leveling, Compaction & f 12/12/2020 12/14/2020 1/2/1900 0:00
Blinding concrete works 1/7/2021 1/7/2021 12/30/1899 0:00
Formworks & Support for 1/9/2021 1/9/2021 12/30/1899 0:00
Concreting Works for Ret 1/16/2021 1/18/2021 1/2/1900 0:00
Pouring Concrete Works f 6/6/2021 6/7/2021 1/1/1900 0:00
Installation of Undergro 4/15/2021 4/21/2021 1/5/1900 0:00
1st Stage mechanical Back 3/7/2021 3/15/2021 1/7/1900 0:00
Complete As-Built Drawi 8/29/2021 10/19/2021 2/13/1900 0:00
Complete submission of 9/30/2021 10/23/2021 1/19/1900 0:00
Mechanical Reports comp 10/6/2021 10/23/2021 1/14/1900 0:00
Close all YES items for fi 10/16/2021 10/26/2021 1/9/1900 0:00
Project Completion 10/26/2021 10/30/2021 1/3/1900 0:00
Structure Backfill under 1/28/2021 1/28/2021 12/30/1899 0:00
Blinding concrete 1/28/2021 1/28/2021 12/30/1899 0:00
Laying of Polyethelene V 1/28/2021 1/28/2021 12/30/1899 0:00
Raft Concrete Foundatio 1/28/2021 1/28/2021 12/30/1899 0:00
Concrete Column to Low 2/18/2021 2/18/2021 12/30/1899 0:00
Retaining Wall to Lower 2/20/2021 2/20/2021 12/30/1899 0:00
Concrete Lower Floor PT 3/1/2021 3/1/2021 12/30/1899 0:00
Mechanical Backfilling W 2/20/2021 2/28/2021 1/7/1900 0:00
Formworks for PT baseme 3/1/2021 3/1/2021 12/30/1899 0:00
Rebar for PT basement Fl 3/1/2021 3/1/2021 12/30/1899 0:00
Temporary Potable Wate 12/30/2020 12/30/2020 12/30/1899 0:00
Delivery of Precast Slab 3/31/2021 6/12/2021 3/3/1900 0:00
Delivery of Precast Slab 3/14/2021 5/27/2021 3/5/1900 0:00
Delivery of Precast Slab 4/5/2021 6/3/2021 2/20/1900 0:00
Delivery of Precast Slab 3/15/2021 6/12/2021 3/17/1900 0:00
Request for Quotation a 12/12/2020 12/15/2020 1/3/1900 0:00
Submission of Material Te 12/16/2020 12/20/2020 1/3/1900 0:00
Approval of Technical Su 12/21/2020 12/28/2020 1/6/1900 0:00
Issue of Purchase Order 12/29/2020 12/31/2020 1/2/1900 0:00
Followup With Material S 1/2/2021 9/14/2021 8/7/1900 0:00
Delivery of Material at Si 1/7/2021 9/20/2021 8/7/1900 0:00
Request for Quotation a 12/12/2020 12/15/2020 1/3/1900 0:00
Submission of Material Te 12/16/2020 12/20/2020 1/3/1900 0:00
Approval of Technical Su 12/21/2020 12/28/2020 1/6/1900 0:00
Issue of Purchase Order 12/29/2020 12/31/2020 1/2/1900 0:00
Followup With Material S 1/2/2021 9/14/2021 8/7/1900 0:00
Delivery of Material at Si 1/7/2021 9/20/2021 8/7/1900 0:00
Request for Quotation a 1/2/2021 1/5/2021 1/3/1900 0:00
Submission of Material Te 1/6/2021 1/10/2021 1/3/1900 0:00
Approval of Technical Su 1/11/2021 1/18/2021 1/6/1900 0:00
Issue of Purchase Order 1/19/2021 1/21/2021 1/2/1900 0:00
Followup With Material S 1/23/2021 3/9/2021 2/8/1900 0:00
Delivery of Material at Si 2/9/2021 3/27/2021 2/8/1900 0:00
Request for Quotation a 1/2/2021 1/5/2021 1/3/1900 0:00
Submission of Material Te 1/6/2021 1/10/2021 1/3/1900 0:00
Approval of Technical Su 1/11/2021 1/18/2021 1/6/1900 0:00
Issue of Purchase Order 1/19/2021 1/21/2021 1/2/1900 0:00
Followup With Material S 1/23/2021 3/21/2021 2/18/1900 0:00
Delivery of Material at Si 2/13/2021 4/11/2021 2/18/1900 0:00
Request for Quotation a 1/23/2021 1/26/2021 1/3/1900 0:00
Submission of Material Te 1/27/2021 1/31/2021 1/3/1900 0:00
Approval of Technical Su 2/1/2021 2/8/2021 1/6/1900 0:00
Issue of Purchase Order 2/9/2021 2/11/2021 1/2/1900 0:00
Followup With Material S 2/13/2021 2/23/2021 1/9/1900 0:00
Delivery of Material at Si 2/18/2021 4/5/2021 2/8/1900 0:00
Request for Quotation a 2/20/2021 2/23/2021 1/3/1900 0:00
Submission of Material Te 2/24/2021 2/28/2021 1/3/1900 0:00
Approval of Technical Su 3/1/2021 3/8/2021 1/6/1900 0:00
Issue of Purchase Order 3/9/2021 3/11/2021 1/2/1900 0:00
Followup With Material S 3/13/2021 6/24/2021 3/30/1900 0:00
Delivery of Material at Si 3/25/2021 7/7/2021 3/30/1900 0:00
Request for Quotation a 12/12/2020 12/15/2020 1/3/1900 0:00
Submission of Material Te 12/16/2020 12/20/2020 1/3/1900 0:00
Approval of Technical Su 12/21/2020 12/28/2020 1/6/1900 0:00
Issue of Purchase Order 12/29/2020 12/31/2020 1/2/1900 0:00
Followup With Material S 1/2/2021 2/28/2021 2/18/1900 0:00
Delivery of Material at Si 1/19/2021 3/21/2021 2/21/1900 0:00
Request for Quotation a 2/20/2021 2/23/2021 1/3/1900 0:00
Submission of Material Te 2/24/2021 2/28/2021 1/3/1900 0:00
Approval of Technical Su 3/1/2021 3/8/2021 1/6/1900 0:00
Issue of Purchase Order 3/9/2021 3/11/2021 1/2/1900 0:00
Followup With Material S 3/13/2021 4/27/2021 2/8/1900 0:00
Delivery of Material at Si 4/11/2021 5/20/2021 2/3/1900 0:00
Request for Quotation a 2/3/2021 2/7/2021 1/3/1900 0:00
Submission of Material Te 2/3/2021 2/7/2021 1/3/1900 0:00
Approval of Technical Su 2/8/2021 2/15/2021 1/6/1900 0:00
Issue of Purchase Order 2/16/2021 2/18/2021 1/2/1900 0:00
Followup With Material S 2/20/2021 4/6/2021 2/8/1900 0:00
Delivery of Material at Si 3/15/2021 4/29/2021 2/8/1900 0:00
Request for Quotation a 12/1/2020 12/5/2020 1/3/1900 0:00
Submission of Material Te 12/6/2020 12/9/2020 1/3/1900 0:00
Approval of Technical Su 12/10/2020 12/17/2020 1/6/1900 0:00
Issue of Purchase Order 12/19/2020 12/21/2020 1/2/1900 0:00
Followup With Material S 12/22/2020 2/6/2021 2/8/1900 0:00
Delivery of Material at Si 2/7/2021 3/24/2021 2/8/1900 0:00
Request for Quotation a 12/22/2020 12/26/2020 1/3/1900 0:00
Submission of Material Te 12/27/2020 12/30/2020 1/3/1900 0:00
Approval of Technical Su 12/31/2020 1/7/2021 1/6/1900 0:00
Issue of Purchase Order 1/9/2021 1/11/2021 1/2/1900 0:00
Followup With Material S 1/12/2021 5/8/2021 4/9/1900 0:00
Delivery of Material at Si 2/4/2021 5/31/2021 4/9/1900 0:00
Request for Quotation a 2/8/2021 2/11/2021 1/3/1900 0:00
Submission of Material Te 2/13/2021 2/16/2021 1/3/1900 0:00
Approval of Technical Su 2/17/2021 2/24/2021 1/6/1900 0:00
Issue of Purchase Order 2/25/2021 2/25/2021 12/31/1899 0:00
Followup With Material S 2/27/2021 4/13/2021 2/8/1900 0:00
Delivery of Material at Si 2/28/2021 4/14/2021 2/8/1900 0:00
Request for Quotation a 1/30/2021 2/2/2021 1/3/1900 0:00
Submission of Material Te 2/3/2021 2/7/2021 1/3/1900 0:00
Approval of Technical Su 2/8/2021 2/15/2021 1/6/1900 0:00
Issue of Purchase Order 2/16/2021 2/18/2021 1/2/1900 0:00
Followup With Material S 2/20/2021 4/6/2021 2/8/1900 0:00
Delivery of Material at Si 3/3/2021 4/18/2021 2/8/1900 0:00
Concrete Lower beams 3/1/2021 3/1/2021 12/30/1899 0:00
Survey & Layout 12/5/2020 12/5/2020 12/30/1899 0:00
Laying of Polyethylene S 12/15/2020 12/15/2020 12/30/1899 0:00
Laying of 1st layer 4mm 1/9/2021 1/9/2021 12/30/1899 0:00
Laying of 5mm thk Protec 1/9/2021 1/9/2021 12/30/1899 0:00
Pouring Concrete for Co 1/12/2021 1/13/2021 1/1/1900 0:00
Laying of 1st layer 4mm 1/28/2021 1/28/2021 12/30/1899 0:00
Laying of 5mm thk Protec 1/28/2021 1/28/2021 12/30/1899 0:00
Structure Backfill under 3/1/2021 3/1/2021 12/30/1899 0:00
Blinding concrete 3/1/2021 3/1/2021 12/30/1899 0:00
Laying of Polyethelene V 3/1/2021 3/1/2021 12/30/1899 0:00
Raft Concrete Foundatio 3/1/2021 3/1/2021 12/30/1899 0:00
Concrete Column to Low 3/1/2021 3/1/2021 12/30/1899 0:00
Retaining Wall to Lower 3/1/2021 3/1/2021 12/30/1899 0:00
Concrete Lower Floor PT 3/6/2021 3/16/2021 1/9/1900 0:00
Mechanical Backfilling W 3/1/2021 3/4/2021 1/3/1900 0:00
Concrete Lower beams 3/6/2021 3/6/2021 12/30/1899 0:00
Laying of 1st layer 4mm 3/1/2021 3/1/2021 12/30/1899 0:00
Laying of 5mm thk Prote 3/1/2021 3/1/2021 12/30/1899 0:00
Pouring Concrete for Tie 1/12/2021 1/18/2021 1/5/1900 0:00
Steel Fixing for Footing 1/9/2021 1/9/2021 12/30/1899 0:00
Pouring Concrete For Fo 1/9/2021 1/10/2021 1/1/1900 0:00
Applying Termite Control 12/15/2020 12/15/2020 12/30/1899 0:00
Removal of Formworks & 1/12/2021 1/12/2021 12/30/1899 0:00
Installation of Electrica 1/9/2021 1/9/2021 12/30/1899 0:00
Steel Fixing with Electri 1/12/2021 1/12/2021 12/30/1899 0:00
Formworks & Support fo 1/12/2021 1/12/2021 12/30/1899 0:00
Removal of Formworks & 1/20/2021 1/20/2021 12/30/1899 0:00
Steel Fixing for Tie Beam 1/12/2021 1/12/2021 12/30/1899 0:00
Formworks & Support & S 1/12/2021 1/12/2021 12/30/1899 0:00
Removal of Formworks & 1/25/2021 1/25/2021 12/30/1899 0:00
Formworks and Water sto 1/16/2021 1/16/2021 12/30/1899 0:00
Survey & Layout 1/16/2021 1/16/2021 12/30/1899 0:00
Laying of Polyethylene Sh 1/16/2021 1/16/2021 12/30/1899 0:00
Steel Fixing, dowels & w 1/16/2021 1/16/2021 12/30/1899 0:00
Formworks for lean Concr 1/16/2021 1/16/2021 12/30/1899 0:00
Removal of Formworks & 2/4/2021 2/4/2021 12/30/1899 0:00
Levelling & Compaction fo 3/16/2021 3/24/2021 1/7/1900 0:00
Apply 2 coat Bitumen Pai 1/7/2021 1/7/2021 12/30/1899 0:00
Blinding concrete works 1/16/2021 1/16/2021 12/30/1899 0:00
Apply 2 coat Bitumen Pai 1/16/2021 1/16/2021 12/30/1899 0:00
Laying of 1st layer 4mm 1/16/2021 1/16/2021 12/30/1899 0:00
Laying of 5mm thk Protec 1/16/2021 1/16/2021 12/30/1899 0:00
Installation of Electrica 4/11/2021 4/14/2021 1/3/1900 0:00
Apply Termite Control 5/30/2021 5/30/2021 12/31/1899 0:00
Laying of Polyethylene S 5/31/2021 5/31/2021 12/31/1899 0:00
Steel Fixing for Slab On 6/1/2021 6/6/2021 1/4/1900 0:00
Installation of Floor Dra 6/3/2021 6/6/2021 1/2/1900 0:00
Subbase Course & Compa 7/8/2021 7/11/2021 1/2/1900 0:00
Apply Primer Coat / MC2 7/12/2021 7/13/2021 1/1/1900 0:00
Asphalting Works 7/14/2021 7/17/2021 1/2/1900 0:00
Topcoat Asphalt 7/18/2021 7/20/2021 1/2/1900 0:00
Formworks & Support for 2/4/2021 2/4/2021 12/30/1899 0:00
Laying of 1st layer 4mm 2/4/2021 2/4/2021 12/30/1899 0:00
Laying of 5mm thk Protec 2/4/2021 2/4/2021 12/30/1899 0:00
Steel Fixing, dowels & w 2/4/2021 2/4/2021 12/30/1899 0:00
Pouring Concrete Shear 2/28/2021 2/28/2021 12/31/1899 0:00
Removal of Formworks & 3/7/2021 3/7/2021 12/30/1899 0:00
Installation of Electrica 2/28/2021 2/28/2021 12/30/1899 0:00
Curing Works for Column 1/14/2021 1/19/2021 1/4/1900 0:00
Curing Works For Footin 1/11/2021 1/14/2021 1/3/1900 0:00
Curing Works For Shear 3/1/2021 3/6/2021 1/4/1900 0:00
Curing Works for Tie Be 1/19/2021 1/30/2021 1/9/1900 0:00
Curing Concrete for Reta 1/19/2021 2/3/2021 1/13/1900 0:00
Curing Works for Slab on 6/8/2021 6/9/2021 1/1/1900 0:00
Installation of Groundin 4/4/2021 4/10/2021 1/5/1900 0:00
Survey, Layout & Survey 1/7/2021 1/7/2021 12/30/1899 0:00
Leveling, Compaction & f 1/7/2021 1/10/2021 1/2/1900 0:00
Blinding concrete works 1/11/2021 1/11/2021 12/30/1899 0:00
Formworks & Support for 1/14/2021 1/23/2021 1/7/1900 0:00
Concreting Works for Ret 1/30/2021 1/30/2021 12/31/1899 0:00
Pouring Concrete Works f 6/12/2021 6/13/2021 1/1/1900 0:00
Installation of Undergro 5/18/2021 5/24/2021 1/5/1900 0:00
1st Stage mechanical Back 3/15/2021 3/25/2021 1/9/1900 0:00
Laying of Polyethylene S 1/11/2021 1/11/2021 12/30/1899 0:00
Laying of 1st layer 4mm 1/11/2021 1/11/2021 12/30/1899 0:00
Laying of 5mm thk Protec 1/12/2021 1/12/2021 12/30/1899 0:00
Pouring Concrete for Co 1/30/2021 1/31/2021 1/1/1900 0:00
Pouring Concrete for Tie 1/28/2021 2/1/2021 1/3/1900 0:00
Steel Fixing for Footing 1/16/2021 1/16/2021 12/30/1899 0:00
Pouring Concrete For Fo 1/24/2021 1/26/2021 1/2/1900 0:00
Applying Termite Control 1/11/2021 1/11/2021 12/30/1899 0:00
Removal of Formworks & 1/28/2021 1/28/2021 12/30/1899 0:00
Installation of Electrica 1/16/2021 1/16/2021 12/30/1899 0:00
Steel Fixing with Electri 1/28/2021 1/28/2021 12/30/1899 0:00
Formworks & Support fo 1/30/2021 1/30/2021 12/30/1899 0:00
Removal of Formworks & 2/9/2021 2/9/2021 12/30/1899 0:00
Steel Fixing for Tie Beam 1/28/2021 1/28/2021 12/30/1899 0:00
Formworks & Support for 1/28/2021 1/28/2021 12/30/1899 0:00
Removal of Formworks & 2/7/2021 2/7/2021 12/30/1899 0:00
Formworks and Water sto 1/30/2021 1/30/2021 12/30/1899 0:00
Survey & Layout 1/28/2021 1/28/2021 12/30/1899 0:00
Laying of Polyethylene Sh 1/28/2021 1/28/2021 12/30/1899 0:00
Steel Fixing, dowels & w 1/28/2021 1/28/2021 12/30/1899 0:00
Formworks for lean Concr 1/28/2021 1/28/2021 12/30/1899 0:00
Removal of Formworks & 2/1/2021 2/1/2021 12/30/1899 0:00
Levelling & Compaction fo 3/20/2021 3/30/2021 1/9/1900 0:00
Apply 2 coat Bitumen Pai 1/11/2021 1/11/2021 12/30/1899 0:00
Blinding concrete works 1/28/2021 1/28/2021 12/30/1899 0:00
Apply 2 coat Bitumen Pai 1/28/2021 1/28/2021 12/30/1899 0:00
Laying of 1st layer 4mm 1/28/2021 1/28/2021 12/30/1899 0:00
Laying of 5mm thk Prote 1/28/2021 1/28/2021 12/30/1899 0:00
Installation of Electrica 5/13/2021 5/17/2021 1/3/1900 0:00
Apply Termite Control 5/31/2021 5/31/2021 12/31/1899 0:00
Laying of Polyethylene S 6/1/2021 6/1/2021 12/31/1899 0:00
Steel Fixing for Slab On 6/2/2021 6/7/2021 1/4/1900 0:00
Installation of Floor Dra 6/8/2021 6/10/2021 1/2/1900 0:00
Subbase Course & Compa 7/8/2021 7/11/2021 1/2/1900 0:00
Apply Primer Coat / MC2 7/12/2021 7/13/2021 1/1/1900 0:00
Asphalting Works 7/14/2021 7/17/2021 1/2/1900 0:00
Topcoat Asphalt 7/21/2021 7/24/2021 1/2/1900 0:00
Formworks & Support for 3/7/2021 3/7/2021 12/30/1899 0:00
Laying of 1st layer 4mm 3/7/2021 3/7/2021 12/30/1899 0:00
Laying of 5mm thk Protec 3/7/2021 3/7/2021 12/30/1899 0:00
Steel Fixing, dowels & w 3/7/2021 3/7/2021 12/30/1899 0:00
Pouring Concrete Shear 3/7/2021 3/8/2021 1/1/1900 0:00
Removal of Formworks & 3/15/2021 3/15/2021 12/30/1899 0:00
Installation of Electrica 3/7/2021 3/7/2021 12/30/1899 0:00
Curing Works for Column 2/1/2021 2/8/2021 1/6/1900 0:00
Curing Works For Footin 1/25/2021 2/4/2021 1/9/1900 0:00
Curing Works For Shear 3/9/2021 3/14/2021 1/4/1900 0:00
Curing Works for Tie Be 2/3/2021 2/9/2021 1/5/1900 0:00
Curing Concrete for Reta 1/31/2021 2/4/2021 1/4/1900 0:00
Curing Works for Slab on 6/14/2021 6/15/2021 1/1/1900 0:00
Installation of Groundin 5/6/2021 5/12/2021 1/5/1900 0:00
Survey, Layout & Survey 12/12/2020 12/12/2020 12/30/1899 0:00
Leveling, Compaction & f 12/12/2020 12/14/2020 1/2/1900 0:00
Blinding concrete works 12/15/2020 12/15/2020 12/30/1899 0:00
Formworks & Support for 12/15/2020 12/24/2020 1/8/1900 0:00
Pouring Concrete Works f 6/13/2021 6/13/2021 12/31/1899 0:00
Installation of Undergro 5/1/2021 5/5/2021 1/4/1900 0:00
1st Stage mechanical Back 2/28/2021 3/10/2021 1/9/1900 0:00
Laying of Polyethylene S 12/15/2020 12/15/2020 12/30/1899 0:00
Laying of 1st layer 4mm 12/15/2020 12/15/2020 12/30/1899 0:00
Laying of 5mm thk Protec 12/15/2020 12/15/2020 12/30/1899 0:00
Pouring Concrete for Co 2/9/2021 2/10/2021 1/1/1900 0:00
Pouring Concrete for Tie 1/28/2021 1/31/2021 1/2/1900 0:00
Steel Fixing for Footing 12/19/2020 12/19/2020 12/30/1899 0:00
Pouring Concrete For Fo 12/26/2020 12/28/2020 1/2/1900 0:00
Applying Termite Control 12/15/2020 12/15/2020 12/30/1899 0:00
Removal of Formworks & 1/2/2021 1/2/2021 12/30/1899 0:00
Installation of Electrica 12/19/2020 12/19/2020 12/30/1899 0:00
Steel Fixing with Electri 1/2/2021 1/2/2021 12/30/1899 0:00
Formworks & Support fo 2/9/2021 2/9/2021 12/30/1899 0:00
Removal of Formworks & 2/28/2021 2/28/2021 12/30/1899 0:00
Steel Fixing for Tie Beam 1/28/2021 1/28/2021 12/30/1899 0:00
Formworks & Support for 1/28/2021 1/28/2021 12/30/1899 0:00
Removal of Formworks & 2/4/2021 2/4/2021 12/30/1899 0:00
Levelling & Compaction fo 3/11/2021 3/22/2021 1/9/1900 0:00
Apply 2 coat Bitumen Pai 12/15/2020 12/15/2020 12/30/1899 0:00
Installation of Electrica 4/28/2021 4/29/2021 1/1/1900 0:00
Apply Termite Control 6/1/2021 6/1/2021 12/31/1899 0:00
Laying of Polyethylene S 6/2/2021 6/3/2021 1/1/1900 0:00
Steel Fixing for Slab On 6/5/2021 6/9/2021 1/4/1900 0:00
Installation of Floor Dra 6/10/2021 6/12/2021 1/1/1900 0:00
Subbase Course & Compa 7/8/2021 7/11/2021 1/2/1900 0:00
Apply Primer Coat / MC2 7/12/2021 7/13/2021 1/1/1900 0:00
Asphalting Works 7/14/2021 7/17/2021 1/2/1900 0:00
Topcoat Asphalt 7/25/2021 7/26/2021 1/1/1900 0:00
Formworks & Support fo 2/15/2021 2/15/2021 12/30/1899 0:00
Laying of 1st layer 4mm 2/15/2021 2/15/2021 12/30/1899 0:00
Laying of 5mm thk Protec 2/15/2021 2/15/2021 12/30/1899 0:00
Steel Fixing, dowels & w 2/15/2021 2/15/2021 12/30/1899 0:00
Pouring Concrete Shear 2/15/2021 2/16/2021 1/1/1900 0:00
Removal of Formworks & 2/25/2021 2/25/2021 12/30/1899 0:00
Installation of Electrica 2/15/2021 2/15/2021 12/30/1899 0:00
Curing Works for Column 2/11/2021 2/27/2021 1/13/1900 0:00
Curing Works For Footin 12/29/2020 1/4/2021 1/5/1900 0:00
Curing Works For Shear 2/17/2021 2/24/2021 1/6/1900 0:00
Curing Works for Tie Be 1/31/2021 2/6/2021 1/5/1900 0:00
Curing Works for Slab on 6/14/2021 6/15/2021 1/1/1900 0:00
Installation of Groundin 4/22/2021 4/27/2021 1/4/1900 0:00
Steel Fixing & Dowels fo 5/3/2021 5/9/2021 1/5/1900 0:00
Formworks & support for 5/4/2021 5/10/2021 1/5/1900 0:00
Pouring Concrete for Col 5/10/2021 5/11/2021 1/1/1900 0:00
Curing Works for Column 5/10/2021 5/12/2021 1/2/1900 0:00
Removal of Formworks & 5/11/2021 5/13/2021 1/2/1900 0:00
Set-up scaffolding & flat 5/11/2021 5/12/2021 1/1/1900 0:00
Steel Fixing & Dowels fo 5/12/2021 5/18/2021 1/5/1900 0:00
Formworks & support for 5/13/2021 5/19/2021 1/5/1900 0:00
Pouring Concrete for 1st 5/20/2021 5/22/2021 1/1/1900 0:00
Curing Works for 1st Flo 5/23/2021 5/24/2021 1/1/1900 0:00
Dismantle of Scaffoldin 5/23/2021 5/24/2021 1/1/1900 0:00
Installation of Filler Boar 5/24/2021 5/25/2021 1/1/1900 0:00
Erection of Hollow Core S 5/26/2021 6/1/2021 1/5/1900 0:00
Grouting from Joint to Jo 5/27/2021 6/2/2021 1/5/1900 0:00
Steel Fixing & Dowels for 6/1/2021 6/2/2021 1/1/1900 0:00
Installation of Floor drai 6/1/2021 6/2/2021 1/1/1900 0:00
Pouring Concrete for Sce 6/3/2021 6/3/2021 12/31/1899 0:00
Curing Concrete for Scre 6/3/2021 6/3/2021 12/31/1899 0:00
Steel Fixing & Dowels fo 3/24/2021 4/4/2021 1/9/1900 0:00
Formworks & support for 3/25/2021 4/5/2021 1/9/1900 0:00
Pouring Concrete for Col 4/5/2021 4/6/2021 1/1/1900 0:00
Curing Works for Column 4/7/2021 4/8/2021 1/1/1900 0:00
Removal of Formworks & 4/8/2021 4/10/2021 1/1/1900 0:00
Set-up scaffolding & flat 4/8/2021 4/10/2021 1/1/1900 0:00
Steel Fixing & Dowels fo 4/10/2021 4/15/2021 1/5/1900 0:00
Formworks & support for 4/11/2021 4/17/2021 1/5/1900 0:00
Pouring Concrete for 1st 4/17/2021 4/18/2021 1/1/1900 0:00
Curing Works for 1st Flo 4/18/2021 4/19/2021 1/1/1900 0:00
Dismantle of Scaffoldin 4/18/2021 4/19/2021 1/1/1900 0:00
Installation of Filler Boar 4/19/2021 4/20/2021 1/1/1900 0:00
Erection of Hollow Core S 4/20/2021 4/26/2021 1/5/1900 0:00
Grouting from Joint to Jo 4/21/2021 4/27/2021 1/5/1900 0:00
Steel Fixing & Dowels for 4/28/2021 4/29/2021 1/1/1900 0:00
Installation of Floor drai 4/28/2021 4/29/2021 1/1/1900 0:00
Pouring Concrete for Sce 5/1/2021 5/1/2021 12/31/1899 0:00
Curing Concrete for Scre 5/1/2021 5/1/2021 12/31/1899 0:00
Steel Fixing & Dowels fo 4/19/2021 4/25/2021 1/5/1900 0:00
Formworks & support for 4/20/2021 4/26/2021 1/5/1900 0:00
Pouring Concrete for Col 4/26/2021 4/27/2021 1/1/1900 0:00
Curing Works for Column 4/27/2021 4/28/2021 1/1/1900 0:00
Removal of Formworks & 4/28/2021 4/29/2021 1/1/1900 0:00
Set-up scaffolding & flat 4/28/2021 4/29/2021 1/1/1900 0:00
Steel Fixing & Dowels fo 4/28/2021 5/2/2021 1/3/1900 0:00
Formworks & support for 4/29/2021 5/3/2021 1/3/1900 0:00
Pouring Concrete for 1st 5/4/2021 5/4/2021 12/31/1899 0:00
Curing Works for 1st Flo 5/4/2021 5/5/2021 1/1/1900 0:00
Dismantle of Scaffoldin 5/5/2021 5/6/2021 1/1/1900 0:00
Installation of Filler Boar 5/6/2021 5/8/2021 1/1/1900 0:00
Erection of Hollow Core S 5/9/2021 5/12/2021 1/3/1900 0:00
Grouting from Joint to Jo 5/10/2021 5/13/2021 1/3/1900 0:00
Steel Fixing & Dowels for 5/12/2021 5/13/2021 1/1/1900 0:00
Installation of Floor drai 5/13/2021 5/15/2021 1/1/1900 0:00
Pouring Concrete for Sce 5/13/2021 5/13/2021 12/31/1899 0:00
Curing Concrete for Scre 5/15/2021 5/15/2021 12/31/1899 0:00
Concreting Works for Ret 2/11/2021 2/11/2021 12/31/1899 0:00
Formworks and Water sto 2/11/2021 2/11/2021 12/30/1899 0:00
Survey & Layout 1/2/2021 1/2/2021 12/30/1899 0:00
Laying of Polyethylene Sh 2/9/2021 2/9/2021 12/30/1899 0:00
Steel Fixing, dowel, wate 2/9/2021 2/9/2021 12/30/1899 0:00
Formworks for lean Concr 1/2/2021 1/2/2021 12/30/1899 0:00
Removal of Formworks & 2/15/2021 2/15/2021 12/30/1899 0:00
Blinding concrete works 2/9/2021 2/9/2021 12/30/1899 0:00
Apply 2 coat Bitumen Pai 2/9/2021 2/9/2021 12/30/1899 0:00
Laying of 1st layer 4mm 2/9/2021 2/9/2021 12/30/1899 0:00
Laying of 5mm thk Prote 2/9/2021 2/9/2021 12/30/1899 0:00
Curing Concrete for Reta 2/13/2021 2/16/2021 1/3/1900 0:00
Steel Fixing, dowels & sle 1/25/2021 2/4/2021 1/9/1900 0:00
Formwork, Support & flat 2/6/2021 2/16/2021 1/9/1900 0:00
Pouring Concrete for Reta 2/17/2021 2/21/2021 1/3/1900 0:00
Curing Concrete Works 2/22/2021 3/1/2021 1/6/1900 0:00
Removal of Formworks a 3/2/2021 3/2/2021 12/30/1899 0:00
Repair Mortar and Apply 3/4/2021 3/4/2021 12/30/1899 0:00
Backfilling works layer by 3/7/2021 3/13/2021 1/5/1900 0:00
Installation of grounding 3/14/2021 3/15/2021 1/1/1900 0:00
Steel Fixing, dowels & sle 2/1/2021 2/9/2021 1/7/1900 0:00
Formwork, Support & flat 2/3/2021 2/11/2021 1/7/1900 0:00
Pouring Concrete for Reta 2/11/2021 2/15/2021 1/3/1900 0:00
Curing Concrete Works 2/13/2021 2/18/2021 1/5/1900 0:00
Removal of Formworks a 2/15/2021 2/15/2021 12/30/1899 0:00
Repair Mortar and Apply 2 2/17/2021 2/17/2021 12/30/1899 0:00
Backfilling works layer by 2/18/2021 2/24/2021 1/5/1900 0:00
Installation of grounding 2/25/2021 2/25/2021 12/30/1899 0:00
Steel Fixing, dowels & sle 2/15/2021 2/25/2021 1/9/1900 0:00
Formwork, Support & flat 2/17/2021 2/28/2021 1/9/1900 0:00
Pouring Concrete for Reta 3/1/2021 3/4/2021 1/3/1900 0:00
Curing Concrete Works 3/2/2021 3/25/2021 1/20/1900 0:00
Removal of Formworks a 3/23/2021 3/28/2021 1/4/1900 0:00
Repair Mortar and Apply 2 3/27/2021 3/30/2021 1/3/1900 0:00
Backfilling works layer by 3/27/2021 4/1/2021 1/5/1900 0:00
Installation of grounding 4/3/2021 4/4/2021 1/1/1900 0:00
Steel Fixing, dowels & sle 1/20/2021 1/26/2021 1/5/1900 0:00
Formwork, Support & flat 1/21/2021 1/27/2021 1/5/1900 0:00
Pouring Concrete for Reta 1/28/2021 1/30/2021 1/1/1900 0:00
Curing Concrete Works 1/30/2021 2/4/2021 1/5/1900 0:00
Removal of Formworks a 2/1/2021 2/1/2021 12/30/1899 0:00
Repair Mortar and Apply 2 2/3/2021 2/3/2021 12/30/1899 0:00
Backfilling works layer by 2/6/2021 2/11/2021 1/5/1900 0:00
Installation of grounding 2/13/2021 2/13/2021 12/30/1899 0:00
Excavation Works of 12 M 12/5/2020 12/5/2020 12/30/1899 0:00
Installation of Manhole c 12/5/2020 12/5/2020 12/30/1899 0:00
Area 5 12/30/2020 12/30/2020 12/30/1899 0:00
Shop Drawing Submittal 12/12/2020 12/12/2020 12/30/1899 0:00
Shop Drawing Review & 12/12/2020 12/12/2020 12/30/1899 0:00
Shop Drawing Submittal 12/12/2020 12/12/2020 12/30/1899 0:00
Shop Drawing Review & 12/12/2020 12/12/2020 12/30/1899 0:00
Shop Drawing Submittal 12/12/2020 12/12/2020 12/30/1899 0:00
Shop Drawing Review & 12/12/2020 12/12/2020 12/30/1899 0:00
Shop Drawing Submittal 12/21/2020 12/21/2020 12/30/1899 0:00
Shop Drawing Review & 12/21/2020 12/21/2020 12/30/1899 0:00
Shop Drawing Submittal 12/30/2020 12/30/2020 12/30/1899 0:00
Shop Drawing Review & 12/30/2020 12/30/2020 12/30/1899 0:00
Request for Quotation a 1/27/2021 1/31/2021 1/3/1900 0:00
Submission of Material Te 2/1/2021 2/4/2021 1/3/1900 0:00
Approval of Technical Su 2/6/2021 2/13/2021 1/6/1900 0:00
Issue of Purchase Order 2/14/2021 2/16/2021 1/2/1900 0:00
Followup With Material S 2/17/2021 2/28/2021 1/9/1900 0:00
Delivery of Material at Si 2/22/2021 3/28/2021 1/29/1900 0:00
Request for Quotation a 1/2/2021 1/5/2021 1/3/1900 0:00
Submission of Material Te 1/6/2021 1/10/2021 1/3/1900 0:00
Approval of Technical Su 1/11/2021 1/18/2021 1/6/1900 0:00
Issue of Purchase Order 1/19/2021 1/21/2021 1/2/1900 0:00
Followup With Material S 1/23/2021 4/25/2021 3/20/1900 0:00
Delivery of Material at Si 1/28/2021 5/1/2021 3/20/1900 0:00
Request for Quotation a 1/23/2021 1/26/2021 1/3/1900 0:00
Submission of Material Te 1/27/2021 1/31/2021 1/3/1900 0:00
Approval of Technical Su 2/1/2021 2/8/2021 1/6/1900 0:00
Issue of Purchase Order 2/9/2021 2/11/2021 1/2/1900 0:00
Followup With Material S 2/13/2021 2/23/2021 1/9/1900 0:00
Delivery of Material at Si 2/18/2021 3/24/2021 1/29/1900 0:00
Installation of Scaffold 4/18/2021 4/22/2021 1/4/1900 0:00
Installation of reinforc 4/24/2021 4/27/2021 1/3/1900 0:00
Pouring Concrete for PT 4/28/2021 4/28/2021 12/31/1899 0:00
Curing Works for PT Slab 4/28/2021 4/29/2021 1/1/1900 0:00
Steel Fixing for Shear Wal 5/15/2021 5/17/2021 1/2/1900 0:00
Formworks & support for 5/16/2021 5/18/2021 1/2/1900 0:00
Pouring Concrete for Shea 5/19/2021 5/19/2021 12/31/1899 0:00
Steel Fixing for Shear Wa 4/8/2021 4/11/2021 1/2/1900 0:00
Formworks & support for 4/10/2021 4/12/2021 1/2/1900 0:00
Pouring Concrete for She 4/13/2021 4/13/2021 12/31/1899 0:00
Formworks & support for 5/27/2021 5/30/2021 1/2/1900 0:00
Rebar for Stair case from 5/31/2021 6/1/2021 1/1/1900 0:00
Pouring Concrete for stai 6/2/2021 6/2/2021 12/31/1899 0:00
Formworks & support for S 6/3/2021 6/7/2021 1/3/1900 0:00
Rebar for Stair case from 6/8/2021 6/10/2021 1/2/1900 0:00
Pouring Concrete for stai 6/12/2021 6/13/2021 1/1/1900 0:00
Formworks & support for 6/14/2021 6/16/2021 1/2/1900 0:00
Rebar for Stair case from 6/17/2021 6/19/2021 1/1/1900 0:00
Pouring Concrete for stai 6/20/2021 6/20/2021 12/31/1899 0:00
Formworks & support for 6/21/2021 6/24/2021 1/3/1900 0:00
Rebar for Stair case from 6/26/2021 6/28/2021 1/2/1900 0:00
Pouring Concrete for stai 6/29/2021 6/30/2021 1/1/1900 0:00
Formworks & support for 7/1/2021 7/4/2021 1/2/1900 0:00
Rebar for Stair case from 7/5/2021 7/6/2021 1/1/1900 0:00
Pouring Concrete for stai 7/7/2021 7/7/2021 12/31/1899 0:00
Formworks & support for 7/8/2021 7/12/2021 1/3/1900 0:00
Rebar for Stair case from 7/13/2021 7/15/2021 1/2/1900 0:00
Pouring Concrete for stai 7/17/2021 7/18/2021 1/1/1900 0:00
Backfilling & Blinding co 1/12/2021 1/12/2021 12/30/1899 0:00
Backfilling & Blinding co 1/28/2021 1/28/2021 12/30/1899 0:00
Backfilling & Blinding co 1/2/2021 1/2/2021 12/30/1899 0:00
2nd Stage mechanical Bac 3/25/2021 4/7/2021 1/11/1900 0:00
Leveling & Compaction for 3/30/2021 4/3/2021 1/3/1900 0:00
2nd Stage mechanical Bac 4/11/2021 4/21/2021 1/9/1900 0:00
Leveling & Compaction for 4/25/2021 5/5/2021 1/9/1900 0:00
2nd Stage mechanical Bac 3/30/2021 4/10/2021 1/9/1900 0:00
Leveling & Compaction for 4/11/2021 4/21/2021 1/9/1900 0:00
Concrete For Ground Fl 3/1/2021 3/1/2021 12/30/1899 0:00
Pouring Concrete For Ra 8/3/2021 8/7/2021 1/3/1900 0:00
Pouring Concrete for Ram 8/8/2021 8/16/2021 1/7/1900 0:00
Slab Concrete Pouring fo 8/24/2021 8/28/2021 1/3/1900 0:00
Backfilling and compacti 8/17/2021 8/23/2021 1/5/1900 0:00
Construction of Laydown 12/30/2020 12/30/2020 12/30/1899 0:00
Survey, Layout & Survey 12/21/2020 12/21/2020 12/30/1899 0:00
Leveling, Compaction & f 12/21/2020 12/23/2020 1/2/1900 0:00
Blinding concrete works 12/24/2020 12/24/2020 12/30/1899 0:00
Formworks & Support for 12/28/2020 1/7/2021 1/9/1900 0:00
Pouring Concrete Works f 6/14/2021 6/15/2021 1/1/1900 0:00
Installation of Undergro 4/13/2021 4/18/2021 1/4/1900 0:00
1st Stage mechanical Back 2/17/2021 2/28/2021 1/9/1900 0:00
Laying of Polyethylene S 12/24/2020 12/24/2020 12/30/1899 0:00
Laying of 1st layer 4mm 12/24/2020 12/24/2020 12/30/1899 0:00
Laying of 5mm thk Protec 12/26/2020 12/26/2020 12/30/1899 0:00
Pouring Concrete for Co 1/16/2021 1/17/2021 1/1/1900 0:00
Pouring Concrete for Tie 1/16/2021 1/18/2021 1/2/1900 0:00
Steel Fixing for Footing 12/29/2020 12/29/2020 12/30/1899 0:00
Pouring Concrete For Fo 1/10/2021 1/12/2021 1/2/1900 0:00
Applying Termite Control 12/24/2020 12/24/2020 12/30/1899 0:00
Removal of Formworks & 1/14/2021 1/14/2021 12/30/1899 0:00
Installation of Electrica 12/29/2020 12/29/2020 12/30/1899 0:00
Steel Fixing with Electri 1/14/2021 1/14/2021 12/30/1899 0:00
Formworks & Support fo 1/16/2021 1/16/2021 12/30/1899 0:00
Removal of Formworks & 1/20/2021 1/20/2021 12/30/1899 0:00
Steel Fixing for Tie Beam 1/14/2021 1/14/2021 12/30/1899 0:00
Formworks & Support for 1/16/2021 1/16/2021 12/30/1899 0:00
Removal of Formworks & 1/18/2021 1/18/2021 12/30/1899 0:00
Levelling & Compaction fo 3/1/2021 3/11/2021 1/9/1900 0:00
Apply 2 coat Bitumen Pai 12/24/2020 12/24/2020 12/30/1899 0:00
Installation of Electrica 4/11/2021 4/12/2021 1/1/1900 0:00
Apply Termite Control 6/2/2021 6/2/2021 12/31/1899 0:00
Laying of Polyethylene S 6/3/2021 6/3/2021 12/31/1899 0:00
Steel Fixing for Slab On 6/5/2021 6/10/2021 1/5/1900 0:00
Installation of Floor Dra 6/12/2021 6/14/2021 1/2/1900 0:00
Subbase Course & Compa 7/8/2021 7/11/2021 1/2/1900 0:00
Apply Primer Coat / MC2 7/12/2021 7/13/2021 1/1/1900 0:00
Asphalting Works 7/14/2021 7/17/2021 1/2/1900 0:00
Topcoat Asphalt 7/27/2021 7/29/2021 1/2/1900 0:00
Formworks & Support for 1/23/2021 1/23/2021 12/30/1899 0:00
LayiLaying of 1st layer 1/23/2021 1/23/2021 12/30/1899 0:00
Laying of 5mm thk Protec 1/23/2021 1/23/2021 12/30/1899 0:00
Steel Fixing, dowels & w 1/26/2021 1/26/2021 12/30/1899 0:00
Pouring Concrete Shear 1/26/2021 1/26/2021 12/31/1899 0:00
Removal of Formworks & 2/4/2021 2/4/2021 12/30/1899 0:00
Installation of Electrica 1/26/2021 1/26/2021 12/30/1899 0:00
Curing Works for Column 1/17/2021 1/18/2021 1/1/1900 0:00
Curing Works For Footin 1/13/2021 1/18/2021 1/4/1900 0:00
Curing Works For Shear 1/27/2021 2/3/2021 1/6/1900 0:00
Curing Works for Tie Be 1/17/2021 1/19/2021 1/2/1900 0:00
Curing Works for Slab on 6/16/2021 6/17/2021 1/1/1900 0:00
Installation of Groundin 4/5/2021 4/10/2021 1/4/1900 0:00
Survey, Layout & Survey 12/30/2020 12/30/2020 12/30/1899 0:00
Leveling, Compaction & f 12/30/2020 1/2/2021 1/2/1900 0:00
Blinding concrete works 1/3/2021 1/3/2021 12/30/1899 0:00
Formworks & Support for 1/6/2021 1/14/2021 1/7/1900 0:00
Pouring Concrete Works f 6/12/2021 6/13/2021 1/1/1900 0:00
Installation of Undergro 4/6/2021 4/12/2021 1/5/1900 0:00
1st Stage mechanical Back 2/24/2021 3/7/2021 1/9/1900 0:00
Laying of Polyethylene S 1/3/2021 1/3/2021 12/30/1899 0:00
Laying of 1st layer 4mm 1/3/2021 1/3/2021 12/30/1899 0:00
Laying of 5mm thk Protec 1/4/2021 1/4/2021 12/30/1899 0:00
Pouring Concrete for Co 1/24/2021 1/25/2021 1/1/1900 0:00
Pouring Concrete for Tie 1/24/2021 1/26/2021 1/2/1900 0:00
Steel Fixing for Footing 1/7/2021 1/7/2021 12/30/1899 0:00
Pouring Concrete For Fo 1/16/2021 1/18/2021 1/2/1900 0:00
Applying Termite Control 1/3/2021 1/3/2021 12/30/1899 0:00
Removal of Formworks & 1/23/2021 1/23/2021 12/30/1899 0:00
Installation of Electrica 1/7/2021 1/7/2021 12/30/1899 0:00
Steel Fixing with Electri 1/23/2021 1/23/2021 12/30/1899 0:00
Formworks & Support fo 1/24/2021 1/24/2021 12/30/1899 0:00
Removal of Formworks & 1/28/2021 1/28/2021 12/30/1899 0:00
Steel Fixing for Tie Beam 1/25/2021 1/25/2021 12/30/1899 0:00
Formworks & Support for 1/26/2021 1/26/2021 12/30/1899 0:00
Removal of Formworks & 1/30/2021 1/30/2021 12/30/1899 0:00
Levelling & Compaction fo 3/1/2021 3/11/2021 1/9/1900 0:00
Apply 2 coat Bitumen Pai 1/3/2021 1/3/2021 12/30/1899 0:00
Excavation Works for be 12/1/2020 12/1/2020 12/30/1899 0:00
Laying of Propertied Pip 12/2/2020 12/2/2020 12/30/1899 0:00
Installation of Electrica 4/1/2021 4/5/2021 1/3/1900 0:00
Sand bedding with aggre 12/5/2020 12/5/2020 12/30/1899 0:00
Apply Termite Control 6/3/2021 6/3/2021 12/31/1899 0:00
Laying of Polyethylene S 6/5/2021 6/5/2021 12/31/1899 0:00
Steel Fixing for Slab On 6/6/2021 6/10/2021 1/4/1900 0:00
Installation of Floor Dra 6/9/2021 6/12/2021 1/2/1900 0:00
Subbase Course & Compa 7/8/2021 7/11/2021 1/2/1900 0:00
Apply Primer Coat / MC2 7/12/2021 7/13/2021 1/1/1900 0:00
Asphalting Works 7/14/2021 7/17/2021 1/2/1900 0:00
Topcoat Asphalt 7/31/2021 8/2/2021 1/2/1900 0:00
Layout for Populated Pip 12/1/2020 12/1/2020 12/30/1899 0:00
Formworks & Support for 2/4/2021 2/4/2021 12/30/1899 0:00
Laying of 1st layer 4mm 2/4/2021 2/4/2021 12/30/1899 0:00
Laying of 5mm thk Protec 2/4/2021 2/4/2021 12/30/1899 0:00
Steel Fixing, dowels & w 2/4/2021 2/4/2021 12/30/1899 0:00
Pouring Concrete Shear 2/7/2021 2/8/2021 1/1/1900 0:00
Removal of Formworks & 2/21/2021 2/23/2021 1/2/1900 0:00
Installation of Electrica 2/4/2021 2/6/2021 1/1/1900 0:00
Curing Works for Column 1/26/2021 1/27/2021 1/1/1900 0:00
Curing Works For Footin 1/19/2021 1/30/2021 1/9/1900 0:00
Curing Works For Shear 2/9/2021 2/20/2021 1/9/1900 0:00
Curing Works for Tie Be 1/26/2021 1/28/2021 1/2/1900 0:00
Curing Works for Slab on 6/14/2021 6/15/2021 1/1/1900 0:00
Installation of Groundin 3/25/2021 3/31/2021 1/5/1900 0:00
Steel Fixing & Dowels fo 1/25/2021 1/31/2021 1/5/1900 0:00
Formworks & support for 2/1/2021 2/6/2021 1/4/1900 0:00
Pouring Concrete for Col 2/7/2021 2/8/2021 1/1/1900 0:00
Curing Works for Column 2/9/2021 2/10/2021 1/1/1900 0:00
Removal of Formworks & 2/10/2021 2/10/2021 12/30/1899 0:00
Set-up scaffolding & fla 2/21/2021 2/21/2021 12/30/1899 0:00
Steel Fixing & Dowels fo 2/22/2021 3/3/2021 1/8/1900 0:00
Formworks & support fo 2/23/2021 3/4/2021 1/8/1900 0:00
Pouring Concrete for GF 3/4/2021 3/6/2021 1/1/1900 0:00
Curing Works for GF-Be 3/6/2021 3/7/2021 1/1/1900 0:00
Dismantle of Scaffoldin 3/6/2021 3/7/2021 1/1/1900 0:00
Installation of Filler Boar 4/11/2021 4/12/2021 1/1/1900 0:00
Erection of Hollow Core S 4/12/2021 4/21/2021 1/8/1900 0:00
Grouting from Joint to Jo 4/14/2021 4/24/2021 1/8/1900 0:00
Steel Fixing & Dowels fo 4/25/2021 4/27/2021 1/2/1900 0:00
Installation of Floor drai 4/25/2021 4/27/2021 1/2/1900 0:00
Pouring Concrete for Scr 4/28/2021 4/28/2021 12/31/1899 0:00
Curing Concrete for Scre 4/28/2021 4/28/2021 12/31/1899 0:00
Steel Fixing & Dowels fo 2/9/2021 2/14/2021 1/4/1900 0:00
Formworks & support for 2/10/2021 2/14/2021 1/3/1900 0:00
Pouring Concrete for Col 2/15/2021 2/16/2021 1/1/1900 0:00
Curing Works for Column 2/17/2021 2/18/2021 1/1/1900 0:00
Removal of Formworks & 2/18/2021 2/18/2021 12/30/1899 0:00
Set-up scaffolding & fla 2/18/2021 2/21/2021 1/2/1900 0:00
Steel Fixing & Dowels fo 2/20/2021 2/20/2021 12/30/1899 0:00
Formworks & support fo 2/21/2021 2/21/2021 12/30/1899 0:00
Pouring Concrete for GF 2/20/2021 2/21/2021 1/1/1900 0:00
Curing Works for GF-Be 2/21/2021 2/22/2021 1/1/1900 0:00
Dismantle of Scaffoldin 2/21/2021 2/21/2021 12/30/1899 0:00
Installation of Filler Boar 2/25/2021 2/27/2021 1/1/1900 0:00
Erection of Hollow Core S 3/24/2021 3/30/2021 1/5/1900 0:00
Grouting from Joint to Jo 3/29/2021 4/4/2021 1/5/1900 0:00
Steel Fixing & Dowels fo 4/5/2021 4/6/2021 1/1/1900 0:00
Installation of Floor drai 4/6/2021 4/7/2021 1/1/1900 0:00
Pouring Concrete for Sce 4/8/2021 4/8/2021 12/31/1899 0:00
Curing Concrete for Scre 4/10/2021 4/10/2021 12/31/1899 0:00
Steel Fixing & Dowels fo 2/28/2021 3/6/2021 1/5/1900 0:00
Formworks & support for 3/1/2021 3/7/2021 1/5/1900 0:00
Pouring Concrete for Co 3/8/2021 3/9/2021 1/1/1900 0:00
Curing Works for Column 3/10/2021 3/15/2021 1/4/1900 0:00
Removal of Formworks & 3/16/2021 3/16/2021 12/30/1899 0:00
Set-up scaffolding & fla 3/16/2021 3/18/2021 1/2/1900 0:00
Steel Fixing & Dowels fo 3/17/2021 3/23/2021 1/5/1900 0:00
Formworks & support fo 3/18/2021 3/24/2021 1/5/1900 0:00
Pouring Concrete for GF 3/24/2021 3/25/2021 1/1/1900 0:00
Curing Works for GF-Be 3/27/2021 3/28/2021 1/1/1900 0:00
Dismantle of Scaffoldin 3/28/2021 3/29/2021 1/1/1900 0:00
Installation of Filler Boar 4/5/2021 4/6/2021 1/1/1900 0:00
Erection of Hollow Core S 4/22/2021 4/28/2021 1/5/1900 0:00
Grouting from Joint to Jo 4/24/2021 4/29/2021 1/5/1900 0:00
Steel Fixing & Dowels fo 4/29/2021 5/1/2021 1/1/1900 0:00
Installation of Floor drai 4/29/2021 5/1/2021 1/1/1900 0:00
Pouring Concrete for Sce 5/2/2021 5/2/2021 12/31/1899 0:00
Curing Concrete for Scre 5/3/2021 5/3/2021 12/31/1899 0:00
Steel Fixing & Dowels fo 1/23/2021 2/2/2021 1/9/1900 0:00
Formworks & support for 1/24/2021 2/3/2021 1/9/1900 0:00
Pouring Concrete for Co 2/3/2021 2/4/2021 1/1/1900 0:00
Curing Works for Column 2/6/2021 2/7/2021 1/1/1900 0:00
Removal of Formworks & 2/7/2021 2/7/2021 12/30/1899 0:00
Set-up scaffolding & fla 2/4/2021 2/7/2021 1/2/1900 0:00
Steel Fixing & Dowels fo 2/6/2021 2/6/2021 12/30/1899 0:00
Formworks & support fo 2/7/2021 2/7/2021 12/30/1899 0:00
Pouring Concrete for GF 2/8/2021 2/9/2021 1/1/1900 0:00
Curing Works for GF-Be 2/10/2021 2/11/2021 1/1/1900 0:00
Dismantle of Scaffoldin 2/10/2021 2/10/2021 12/30/1899 0:00
Installation of Filler Boar 2/15/2021 2/16/2021 1/1/1900 0:00
Erection of Hollow Core S 3/15/2021 3/23/2021 1/7/1900 0:00
Grouting from Joint to Jo 3/20/2021 3/28/2021 1/7/1900 0:00
Steel Fixing & Dowels fo 3/21/2021 3/22/2021 1/1/1900 0:00
Installation of Floor drai 3/21/2021 3/22/2021 1/1/1900 0:00
Pouring Concrete for Sce 3/23/2021 3/23/2021 12/31/1899 0:00
Curing Concrete for Scre 3/24/2021 3/24/2021 12/31/1899 0:00
Steel Fixing & Dowels fo 1/31/2021 2/8/2021 1/7/1900 0:00
Formworks & support for 2/2/2021 2/2/2021 12/30/1899 0:00
Pouring Concrete for Co 2/2/2021 2/3/2021 1/1/1900 0:00
Curing Works for Column 2/4/2021 2/9/2021 1/4/1900 0:00
Removal of Formworks & 2/8/2021 2/8/2021 12/30/1899 0:00
Set-up scaffolding & fla 2/8/2021 2/10/2021 1/2/1900 0:00
Steel Fixing & Dowels fo 2/9/2021 2/17/2021 1/7/1900 0:00
Formworks & support fo 2/10/2021 2/18/2021 1/7/1900 0:00
Pouring Concrete for GF 2/20/2021 2/21/2021 1/1/1900 0:00
Curing Works for GF-Be 2/21/2021 2/22/2021 1/1/1900 0:00
Dismantle of Scaffoldin 2/22/2021 2/23/2021 1/1/1900 0:00
Installation of Filler Boar 2/22/2021 2/23/2021 1/1/1900 0:00
Erection of Hollow Core S 4/5/2021 4/13/2021 1/7/1900 0:00
Grouting from Joint to Jo 4/7/2021 4/15/2021 1/7/1900 0:00
Steel Fixing & Dowels fo 4/15/2021 4/17/2021 1/1/1900 0:00
Installation of Floor drai 4/15/2021 4/17/2021 1/1/1900 0:00
Pouring Concrete for Sce 4/18/2021 4/18/2021 12/31/1899 0:00
Curing Concrete for Scre 4/19/2021 4/19/2021 12/31/1899 0:00
Concreting Works for Ret 1/16/2021 1/16/2021 12/31/1899 0:00
Formworks and Water sto 1/16/2021 1/16/2021 12/30/1899 0:00
Survey & Layout 1/14/2021 1/14/2021 12/30/1899 0:00
Laying of Polyethylene Sh 1/14/2021 1/14/2021 12/30/1899 0:00
Steel Fixing, dowels & w 1/14/2021 1/14/2021 12/30/1899 0:00
Formworks for lean Concr 1/14/2021 1/14/2021 12/30/1899 0:00
Removal of Formworks & 1/20/2021 1/20/2021 12/30/1899 0:00
Blinding concrete works 1/14/2021 1/14/2021 12/30/1899 0:00
Apply 2 coat Bitumen Pai 1/14/2021 1/14/2021 12/30/1899 0:00
Laying of 1st layer 4mm 1/14/2021 1/14/2021 12/30/1899 0:00
Laying of 5mm thk Prote 1/14/2021 1/14/2021 12/30/1899 0:00
Curing Concrete for Reta 1/17/2021 1/21/2021 1/4/1900 0:00
Survey, Layout & Survey 12/24/2020 12/24/2020 12/30/1899 0:00
Leveling, Compaction & f 12/24/2020 12/26/2020 1/1/1900 0:00
Applying Termite Control 12/27/2020 12/27/2020 12/30/1899 0:00
Laying of Polyethylene S 12/27/2020 12/27/2020 12/30/1899 0:00
Blinding concrete works 12/27/2020 12/27/2020 12/30/1899 0:00
Apply 2 coat Bitumen Pai 12/27/2020 12/27/2020 12/30/1899 0:00
Laying of 1st layer 4mm 12/27/2020 12/27/2020 12/30/1899 0:00
Laying of 5mm thk Protec 12/27/2020 12/27/2020 12/30/1899 0:00
Formworks & Support for 12/27/2020 1/12/2021 1/14/1900 0:00
Steel Fixing, dowels for 1/3/2021 1/19/2021 1/14/1900 0:00
Installation of MEP 1/11/2021 1/11/2021 12/30/1899 0:00
Pouring Concrete for Raf 1/20/2021 1/21/2021 1/1/1900 0:00
Curing Works for Raft Fo 1/23/2021 1/28/2021 1/5/1900 0:00
Removal of Formworks 1/31/2021 1/31/2021 12/30/1899 0:00
Apply Concrete Repair Mo 1/31/2021 1/31/2021 12/30/1899 0:00
Apply Coat Tar on subme 1/31/2021 1/31/2021 12/30/1899 0:00
Laying of 1st layer 4mm 1/31/2021 1/31/2021 12/30/1899 0:00
Mechanical Backfilling W 1/31/2021 2/16/2021 1/14/1900 0:00
Backfilling & Compaction 12/5/2020 12/5/2020 12/30/1899 0:00
Steel Fixing for Shear Wal 3/16/2021 3/18/2021 1/2/1900 0:00
Formworks & support for 3/17/2021 3/20/2021 1/2/1900 0:00
Pouring Concrete for She 3/21/2021 3/22/2021 1/1/1900 0:00
Installation of Scaffold 2/13/2021 2/20/2021 1/6/1900 0:00
Installation of reinforc 2/21/2021 2/27/2021 1/5/1900 0:00
Pouring Concrete for PT 2/28/2021 2/28/2021 12/30/1899 0:00
Curing Works for PT Slab 2/28/2021 3/3/2021 1/3/1900 0:00
Steel Fixing for Shear Wa 2/7/2021 2/10/2021 1/3/1900 0:00
Formworks & support for 2/10/2021 2/14/2021 1/3/1900 0:00
Pouring Concrete for She 2/15/2021 2/16/2021 1/1/1900 0:00
Backfilling & Blinding co 1/14/2021 1/14/2021 12/30/1899 0:00
Backfilling & Blinding co 1/25/2021 1/25/2021 12/30/1899 0:00
2nd Stage mechanical Bac 3/13/2021 3/23/2021 1/9/1900 0:00
Leveling & Compaction for 3/24/2021 4/4/2021 1/9/1900 0:00
2nd Stage mechanical Bac 3/13/2021 3/23/2021 1/9/1900 0:00
Leveling & Compaction for 3/14/2021 3/24/2021 1/9/1900 0:00
target_work_qty target_cost actv_code_major_boqactv_code_actv_code_
(*)Budgeted Labor Units(h) (*)Budgeted Total Cost($) Major BOQ Items. Areas stages
12/30/1899 0:00 12/30/1899 0:00 GEN
12/30/1899 0:00 12/30/1899 0:00 GEN
12/30/1899 0:00 12/30/1899 0:00 GEN
12/30/1899 0:00 12/30/1899 0:00 GEN
12/30/1899 0:00 12/30/1899 0:00 GEN
12/30/1899 0:00 12/30/1899 0:00 GEN
12/30/1899 0:00 12/30/1899 0:00 GEN
12/30/1899 0:00 12/30/1899 0:00 GEN
12/30/1899 0:00 12/30/1899 0:00 GEN
12/30/1899 0:00 12/30/1899 0:00 MOB
12/30/1899 0:00 12/30/1899 0:00 MOB
12/30/1899 0:00 12/30/1899 0:00 MOB
12/30/1899 0:00 12/30/1899 0:00 MOB
12/30/1899 0:00 12/30/1899 0:00 MOB
12/30/1899 0:00 12/30/1899 0:00 ENG
12/30/1899 0:00 12/30/1899 0:00 ENG
12/30/1899 0:00 12/30/1899 0:00 ENG
12/30/1899 0:00 12/30/1899 0:00 ENG
12/30/1899 0:00 12/30/1899 0:00 5.2.1.2 P1A1 sub
5/23/1900 0:00 12/30/1899 0:00 5.2.1.2 P1A1 sub
12/30/1899 0:00 12/30/1899 0:00 5.2.1.2 P1A1 sub
12/30/1899 0:00 12/30/1899 0:00 5.2.2.1.1 P1A1 sub
7/12/1902 0:00 3/14/2561 0:00 5.2.2.1.1 P1A1 sub
9/26/1902 0:00 4/6/2580 6:00 5.2.2.1.6 P1A1 BAS
2/28/1900 0:00 9/28/2126 13:40 MEP P1A1 MEP
12/30/1899 0:00 12/30/1899 0:00 5.1.2.3 P1A1 sub
7/23/1901 0:00 6/7/2318 18:00 CL
10/21/1901 0:00 6/7/2318 18:00 CL
12/20/1901 0:00 6/7/2318 18:00 CL
1/9/1902 0:00 1/21/2151 10:48 CL
10/11/1900 0:00 5/18/6963 7:12 CL
12/30/1899 0:00 12/30/1899 0:00 P1A1 TANKS
12/30/1899 0:00 12/30/1899 0:00 5.2.1.2 P1A1 TANKS
12/30/1899 0:00 12/30/1899 0:00 5.2.2.1.2 P1A1 TANKS
12/30/1899 0:00 12/30/1899 0:00 5.2.2.1.2 P1A1 TANKS
12/30/1899 0:00 12/30/1899 0:00 5.2.2.1.4 P1A1 TANKS
12/30/1899 0:00 12/30/1899 0:00 5.2.2.1.4 P1A1 TANKS
12/30/1899 0:00 12/30/1899 0:00 5.2.4 P1A1 TANKS
5/29/1900 0:00 12/30/1899 0:00 P1A1 TANKS
12/30/1899 0:00 12/30/1899 0:00 5.2.4 P1A1 TANKS
12/30/1899 0:00 12/30/1899 0:00 5.2.4 P1A1 TANKS
12/30/1899 0:00 12/30/1899 0:00 MOB
12/30/1899 0:00 12/30/1899 0:00 PRC
12/30/1899 0:00 12/30/1899 0:00 PRC
12/30/1899 0:00 12/30/1899 0:00 PRC
12/30/1899 0:00 12/30/1899 0:00 PRC
12/30/1899 0:00 12/30/1899 0:00 PRC
12/30/1899 0:00 12/30/1899 0:00 PRC
12/30/1899 0:00 12/30/1899 0:00 PRC
12/30/1899 0:00 12/30/1899 0:00 PRC
12/30/1899 0:00 12/30/1899 0:00 PRC
12/30/1899 0:00 12/30/1899 0:00 PRC
12/30/1899 0:00 12/30/1899 0:00 PRC
12/30/1899 0:00 12/30/1899 0:00 PRC
12/30/1899 0:00 12/30/1899 0:00 PRC
12/30/1899 0:00 12/30/1899 0:00 PRC
12/30/1899 0:00 12/30/1899 0:00 PRC
12/30/1899 0:00 12/30/1899 0:00 PRC
12/30/1899 0:00 12/30/1899 0:00 PRC
12/30/1899 0:00 12/30/1899 0:00 PRC
12/30/1899 0:00 12/30/1899 0:00 PRC
12/30/1899 0:00 12/30/1899 0:00 PRC
12/30/1899 0:00 12/30/1899 0:00 PRC
12/30/1899 0:00 12/30/1899 0:00 PRC
12/30/1899 0:00 12/30/1899 0:00 PRC
12/30/1899 0:00 12/30/1899 0:00 PRC
12/30/1899 0:00 12/30/1899 0:00 PRC
12/30/1899 0:00 12/30/1899 0:00 PRC
12/30/1899 0:00 12/30/1899 0:00 PRC
12/30/1899 0:00 12/30/1899 0:00 PRC
12/30/1899 0:00 12/30/1899 0:00 PRC
12/30/1899 0:00 12/30/1899 0:00 PRC
12/30/1899 0:00 12/30/1899 0:00 PRC
12/30/1899 0:00 12/30/1899 0:00 PRC
12/30/1899 0:00 12/30/1899 0:00 PRC
12/30/1899 0:00 12/30/1899 0:00 PRC
12/30/1899 0:00 12/30/1899 0:00 PRC
12/30/1899 0:00 12/30/1899 0:00 PRC
12/30/1899 0:00 12/30/1899 0:00 PRC
12/30/1899 0:00 12/30/1899 0:00 PRC
12/30/1899 0:00 12/30/1899 0:00 PRC
12/30/1899 0:00 12/30/1899 0:00 PRC
12/30/1899 0:00 12/30/1899 0:00 PRC
12/30/1899 0:00 12/30/1899 0:00 PRC
12/30/1899 0:00 12/30/1899 0:00 PRC
12/30/1899 0:00 12/30/1899 0:00 PRC
12/30/1899 0:00 12/30/1899 0:00 PRC
12/30/1899 0:00 12/30/1899 0:00 PRC
12/30/1899 0:00 12/30/1899 0:00 PRC
12/30/1899 0:00 12/30/1899 0:00 PRC
12/30/1899 0:00 12/30/1899 0:00 PRC
12/30/1899 0:00 12/30/1899 0:00 PRC
12/30/1899 0:00 12/30/1899 0:00 PRC
12/30/1899 0:00 12/30/1899 0:00 PRC
12/30/1899 0:00 12/30/1899 0:00 PRC
12/30/1899 0:00 12/30/1899 0:00 PRC
12/30/1899 0:00 12/30/1899 0:00 PRC
12/30/1899 0:00 12/30/1899 0:00 PRC
12/30/1899 0:00 12/30/1899 0:00 PRC
12/30/1899 0:00 12/30/1899 0:00 PRC
12/30/1899 0:00 12/30/1899 0:00 PRC
12/30/1899 0:00 12/30/1899 0:00 PRC
12/30/1899 0:00 12/30/1899 0:00 PRC
12/30/1899 0:00 12/30/1899 0:00 PRC
12/30/1899 0:00 12/30/1899 0:00 PRC
12/30/1899 0:00 12/30/1899 0:00 PRC
12/30/1899 0:00 12/30/1899 0:00 PRC
12/30/1899 0:00 12/30/1899 0:00 PRC
12/30/1899 0:00 12/30/1899 0:00 PRC
12/30/1899 0:00 12/30/1899 0:00 PRC
12/30/1899 0:00 12/30/1899 0:00 PRC
12/30/1899 0:00 12/30/1899 0:00 PRC
12/30/1899 0:00 12/30/1899 0:00 PRC
12/30/1899 0:00 12/30/1899 0:00 PRC
12/30/1899 0:00 12/30/1899 0:00 PRC
12/30/1899 0:00 12/30/1899 0:00 PRC
12/30/1899 0:00 12/30/1899 0:00 PRC
12/30/1899 0:00 12/30/1899 0:00 PRC
12/30/1899 0:00 12/30/1899 0:00 PRC
12/30/1899 0:00 12/30/1899 0:00 PRC
12/30/1899 0:00 12/30/1899 0:00 PRC
12/30/1899 0:00 12/30/1899 0:00 PRC
12/30/1899 0:00 12/30/1899 0:00 PRC
12/30/1899 0:00 12/30/1899 0:00 PRC
12/30/1899 0:00 12/30/1899 0:00 5.2.4 P1A1 TANKS
12/30/1899 0:00 12/30/1899 0:00
12/30/1899 0:00 12/30/1899 0:00 5.1.6.1 P1A1 sub
12/30/1899 0:00 12/30/1899 0:00 5.1.6.2 P1A1 sub
12/30/1899 0:00 12/30/1899 0:00 5.1.6.2 P1A1 sub
5/14/1901 0:00 8/24/2107 16:48 5.2.2.2.1 P1A1 sub
12/30/1899 0:00 12/30/1899 0:00 5.1.6.2 P1A1 TANKS
12/30/1899 0:00 12/30/1899 0:00 5.1.6.2 P1A1 TANKS
12/30/1899 0:00 12/30/1899 0:00 P1A3 TANKS
12/30/1899 0:00 12/30/1899 0:00 5.2.1.2 P1A3 sub
12/30/1899 0:00 12/30/1899 0:00 P1A3 TANKS
12/30/1899 0:00 12/30/1899 0:00 5.2.2.1.2 P1A3 TANKS
12/30/1899 0:00 12/30/1899 0:00 5.2.2.1.4 P1A3 TANKS
12/30/1899 0:00 12/30/1899 0:00 5.2.2.1.4 P1A3 TANKS
2/3/1901 0:00 1/31/2180 0:00 5.2.4 P1A3 TANKS
3/20/1900 0:00 12/30/1899 0:00 P1A3 TANKS
12/30/1899 0:00 12/30/1899 0:00 5.2.4 P1A3 TANKS
12/30/1899 0:00 12/30/1899 0:00 5.1.6.2 P1A3 TANKS
12/30/1899 0:00 12/30/1899 0:00 5.1.6.2 P1A3 TANKS
1/26/1904 0:00 6/2/2951 23:02 5.2.2.1.3 P1A1 sub
12/30/1899 0:00 12/30/1899 0:00 5.2.2.1.1 P1A1 sub
6/22/1905 0:00 8/11/3883 0:00 5.2.2.1.1 P1A1 sub
12/30/1899 0:00 12/30/1899 0:00 5.1.4.1 P1A1 sub
12/30/1899 0:00 12/30/1899 0:00 5.2.2.1.1 P1A1 sub
12/30/1899 0:00 12/30/1899 0:00 5.2.2.1.1 P1A1 sub
12/30/1899 0:00 12/30/1899 0:00 5.2.2.2.1 P1A1 sub
12/30/1899 0:00 12/30/1899 0:00 5.2.2.2.1 P1A1 sub
12/30/1899 0:00 12/30/1899 0:00 5.2.2.2.1 P1A1 sub
12/30/1899 0:00 12/30/1899 0:00 5.2.2.1.3 P1A1 sub
12/30/1899 0:00 12/30/1899 0:00 5.2.2.1.3 P1A1 sub
12/30/1899 0:00 12/30/1899 0:00 5.2.2.1.3 P1A1 sub
12/30/1899 0:00 12/30/1899 0:00 5.2.2.1.1 P1A1 sub
12/30/1899 0:00 12/30/1899 0:00 5.2.1.2 P1A1 sub
12/30/1899 0:00 12/30/1899 0:00 5.1.6.1 P1A1 sub
12/30/1899 0:00 12/30/1899 0:00 5.2.2.1.1 P1A1 sub
12/30/1899 0:00 12/30/1899 0:00 5.1.4.1 P1A1 sub
12/30/1899 0:00 12/30/1899 0:00 5.2.2.1.1 P1A1 sub
4/9/1900 0:00 12/30/1899 0:00 5.1.2.3 P1A1 sub
12/30/1899 0:00 12/30/1899 0:00 5.2.1.2 P1A1 sub
12/30/1899 0:00 12/30/1899 0:00 5.2.1.2 P1A1 sub
12/30/1899 0:00 12/30/1899 0:00 5.1.6.2 P1A1 sub
12/30/1899 0:00 12/30/1899 0:00 5.1.6.2 P1A1 sub
12/30/1899 0:00 12/30/1899 0:00 5.1.6.2 P1A1 sub
2/28/1900 0:00 7/18/1967 1:26 MEP P1A1 MEP
4/7/1900 0:00 5/17/1945 0:57 5.1.4.1 P1A1 BAS
4/19/1900 0:00 1/16/1935 0:00 5.1.6.1 P1A1 BAS
4/14/1903 0:00 12/30/1899 0:00 5.2.2.1.6 P1A1 BAS
6/29/1900 0:00 12/30/1899 0:00 5.2.2.1.6 P1A1 BAS
10/26/1902 0:00 9/12/2492 6:43 5.1.5.4 P1A1 BAS
4/12/1900 0:00 7/25/1955 2:52 5.1.5.1 P1A1 BAS
10/26/1902 0:00 1/18/2363 0:00 5.1.5.3 P1A1 BAS
10/26/1902 0:00 5/6/2196 15:21 5.1.5.2 P1A1 BAS
12/30/1899 0:00 12/30/1899 0:00 5.2.2.1.1 P1A1 sub
12/30/1899 0:00 12/30/1899 0:00 5.1.6.2 P1A1 sub
12/30/1899 0:00 12/30/1899 0:00 5.1.6.2 P1A1 sub
12/30/1899 0:00 12/30/1899 0:00 5.2.2.1.1 P1A1 sub
4/29/1900 0:00 6/10/2042 3:36 5.2.2.1.1 P1A1 sub
12/30/1899 0:00 12/30/1899 0:00 5.2.2.1.1 P1A1 sub
12/30/1899 0:00 12/30/1899 0:00 5.2.2.1.1 P1A1 sub
5/29/1900 0:00 12/30/1899 0:00 5.2.2.2.1 P1A1 sub
4/8/1900 0:00 12/30/1899 0:00 5.2.2.1.1 P1A1 sub
2/8/1900 0:00 12/30/1899 0:00 5.2.2.1.1 P1A1 sub
5/8/1900 0:00 12/30/1899 0:00 5.2.2.1.3 P1A1 sub
4/6/1900 0:00 12/30/1899 0:00 5.2.2.1.1 P1A1 sub
3/28/1900 0:00 12/30/1899 0:00 5.2.2.1.6 P1A1 BAS
8/12/1900 0:00 12/1/1980 13:26 MEP P1A1 MEP
12/30/1899 0:00 12/30/1899 0:00 5.2.1.2 P1A2 sub
2/22/1900 0:00 12/30/1899 0:00 5.2.1.2 P1A2 sub
12/30/1899 0:00 12/30/1899 0:00 5.2.1.2 P1A2 sub
2/18/1900 0:00 12/30/1899 0:00 5.2.2.1.1 P1A2 sub
2/14/1901 0:00 8/7/2230 0:00 5.2.2.1.1 P1A2 sub
10/13/1901 0:00 3/8/2286 2:24 5.2.2.1.6 P1A2 BAS
2/28/1900 0:00 5/6/2126 3:50 MEP P1A2 MEP
4/9/1900 0:00 5/8/1944 0:00 5.1.2.3 P1A2 sub
12/30/1899 0:00 12/30/1899 0:00 5.1.6.1 P1A2 sub
12/30/1899 0:00 12/30/1899 0:00 5.1.6.2 P1A2 sub
12/30/1899 0:00 12/30/1899 0:00 5.1.6.2 P1A2 sub
3/30/1900 0:00 9/13/2086 8:38 5.2.2.2.1 P1A2 sub
7/19/1902 0:00 11/17/2496 1:55 5.2.2.1.3 P1A2 sub
12/30/1899 0:00 12/30/1899 0:00 5.2.2.1.1 P1A2 sub
10/1/1903 0:00 1/2/3002 0:00 5.2.2.1.1 P1A2 sub
12/30/1899 0:00 12/30/1899 0:00 5.1.4.1 P1A2 sub
12/30/1899 0:00 12/30/1899 0:00 5.2.2.1.1 P1A2 sub
12/30/1899 0:00 12/30/1899 0:00 5.2.2.1.1 P1A2 sub
12/30/1899 0:00 12/30/1899 0:00 5.2.2.2.1 P1A2 sub
12/30/1899 0:00 12/30/1899 0:00 5.2.2.2.1 P1A2 sub
12/30/1899 0:00 12/30/1899 0:00 5.2.2.2.1 P1A2 sub
12/30/1899 0:00 12/30/1899 0:00 5.2.2.1.3 P1A2 sub
12/30/1899 0:00 12/30/1899 0:00 5.2.2.1.3 P1A2 sub
12/30/1899 0:00 12/30/1899 0:00 5.2.2.1.3 P1A2 sub
12/30/1899 0:00 12/30/1899 0:00 5.2.2.1.1 P1A2 sub
12/30/1899 0:00 12/30/1899 0:00 5.2.1.2 P1A2 sub
12/30/1899 0:00 12/30/1899 0:00 5.1.6.1 P1A2 sub
12/30/1899 0:00 12/30/1899 0:00 5.2.2.1.1 P1A2 sub
12/30/1899 0:00 12/30/1899 0:00 5.1.4.1 P1A2 sub
12/30/1899 0:00 12/30/1899 0:00 5.2.2.1.1 P1A2 sub
2/18/1900 0:00 12/30/1899 0:00 5.1.2.3 P1A2 sub
12/30/1899 0:00 12/30/1899 0:00 5.2.1.2 P1A2 sub
12/30/1899 0:00 12/30/1899 0:00 5.2.1.2 P1A2 sub
12/30/1899 0:00 12/30/1899 0:00 P1A2 sub
12/30/1899 0:00 12/30/1899 0:00 5.1.6.2 P1A2 sub
12/30/1899 0:00 12/30/1899 0:00 5.1.6.2 P1A2 sub
2/28/1900 0:00 3/28/1910 17:02 MEP P1A2 MEP
2/24/1900 0:00 10/4/1925 0:00 5.1.4.1 P1A2 BAS
3/7/1900 0:00 11/25/1921 0:00 5.1.6.1 P1A2 BAS
8/22/1901 0:00 12/30/1899 0:00 5.2.2.1.6 P1A2 BAS
4/9/1900 0:00 12/30/1899 0:00 5.2.2.1.6 P1A2 BAS
8/7/1901 0:00 6/25/2234 15:21 5.1.5.4 P1A2 BAS
2/26/1900 0:00 5/10/1931 7:26 5.1.5.1 P1A2 BAS
8/7/1901 0:00 4/24/2161 6:00 5.1.5.3 P1A2 BAS
8/7/1901 0:00 3/28/2067 7:40 5.1.5.2 P1A2 BAS
12/30/1899 0:00 12/30/1899 0:00 5.2.2.1.1 P1A2 sub
12/30/1899 0:00 12/30/1899 0:00 5.1.6.2 P1A2 sub
12/30/1899 0:00 12/30/1899 0:00 5.1.6.2 P1A2 sub
12/30/1899 0:00 12/30/1899 0:00 5.2.2.1.1 P1A2 sub
3/20/1900 0:00 9/9/2049 14:24 5.2.2.1.1 P1A2 sub
12/30/1899 0:00 12/30/1899 0:00 5.2.2.1.1 P1A2 sub
12/30/1899 0:00 12/30/1899 0:00 5.2.2.1.1 P1A2 sub
5/29/1900 0:00 12/30/1899 0:00 5.2.2.2.1 P1A2 sub
3/20/1900 0:00 12/30/1899 0:00 5.2.2.1.1 P1A2 sub
2/8/1900 0:00 12/30/1899 0:00 5.2.2.1.1 P1A2 sub
3/19/1900 0:00 12/30/1899 0:00 5.2.2.1.3 P1A2 sub
2/23/1900 0:00 12/30/1899 0:00 5.2.2.1.1 P1A2 sub
2/18/1900 0:00 12/30/1899 0:00 5.2.2.1.6 P1A2 BAS
8/12/1900 0:00 1/16/1969 5:02 MEP P1A2 MEP
12/30/1899 0:00 12/30/1899 0:00 5.2.1.2 P1A3 sub
2/10/1900 0:00 12/30/1899 0:00 5.2.1.2 P1A3 sub
12/30/1899 0:00 12/30/1899 0:00 5.2.1.2 P1A3 sub
4/17/1900 0:00 12/30/1899 0:00 5.2.2.1.1 P1A3 sub
3/10/1902 0:00 9/10/2369 13:12 5.2.2.1.6 P1A3 BAS
2/28/1900 0:00 4/9/2126 16:33 MEP P1A3 MEP
5/29/1900 0:00 2/19/1959 0:00 5.1.2.3 P1A3 sub
12/30/1899 0:00 12/30/1899 0:00 5.1.6.1 P1A3 sub
12/30/1899 0:00 12/30/1899 0:00 5.1.6.2 P1A3 sub
12/30/1899 0:00 12/30/1899 0:00 5.1.6.2 P1A3 sub
4/29/1900 0:00 1/8/2075 15:50 5.2.2.2.1 P1A3 sub
3/15/1903 0:00 8/15/2625 20:09 5.2.2.1.3 P1A3 sub
12/30/1899 0:00 12/30/1899 0:00 5.2.2.1.1 P1A3 sub
1/27/1905 0:00 10/22/3442 0:00 5.2.2.1.1 P1A3 sub
12/30/1899 0:00 12/30/1899 0:00 5.1.4.1 P1A3 sub
12/30/1899 0:00 12/30/1899 0:00 5.2.2.1.1 P1A3 sub
12/30/1899 0:00 12/30/1899 0:00 5.2.2.1.1 P1A3 sub
12/30/1899 0:00 12/30/1899 0:00 5.2.2.2.1 P1A3 sub
12/30/1899 0:00 12/30/1899 0:00 5.2.2.2.1 P1A3 sub
12/30/1899 0:00 12/30/1899 0:00 5.2.2.2.1 P1A3 sub
12/30/1899 0:00 12/30/1899 0:00 5.2.2.1.3 P1A3 sub
12/30/1899 0:00 12/30/1899 0:00 5.2.2.1.3 P1A3 sub
12/30/1899 0:00 12/30/1899 0:00 5.2.2.1.3 P1A3 sub
2/18/1900 0:00 12/30/1899 0:00 5.1.2.3 P1A3 sub
12/30/1899 0:00 12/30/1899 0:00 5.2.1.2 P1A3 sub
2/28/1900 0:00 3/28/1910 17:02 MEP P1A3 MEP
2/11/1900 0:00 4/25/1931 11:31 5.1.4.1 P1A3 BAS
3/30/1900 0:00 2/3/1924 0:00 5.1.6.1 P1A3 BAS
11/30/1901 0:00 12/30/1899 0:00 5.2.2.1.6 P1A3 BAS
5/29/1900 0:00 12/30/1899 0:00 5.2.2.1.6 P1A3 BAS
3/31/1901 0:00 10/29/2247 13:26 5.1.5.4 P1A3 BAS
2/14/1900 0:00 8/9/1932 5:45 5.1.5.1 P1A3 BAS
3/31/1901 0:00 9/27/2171 0:00 5.1.5.3 P1A3 BAS
3/31/1901 0:00 11/28/2073 6:43 5.1.5.2 P1A3 BAS
12/30/1899 0:00 12/30/1899 0:00 5.2.2.1.1 P1A3 sub
12/30/1899 0:00 12/30/1899 0:00 5.1.6.2 P1A3 sub
12/30/1899 0:00 12/30/1899 0:00 5.1.6.2 P1A3 sub
12/30/1899 0:00 12/30/1899 0:00 5.2.2.1.1 P1A3 sub
5/29/1900 0:00 5/18/2060 20:24 5.2.2.1.1 P1A3 sub
12/30/1899 0:00 12/30/1899 0:00 5.2.2.1.1 P1A3 sub
12/30/1899 0:00 12/30/1899 0:00 5.2.2.1.1 P1A3 sub
5/29/1900 0:00 12/30/1899 0:00 5.2.2.2.1 P1A3 sub
3/30/1900 0:00 12/30/1899 0:00 5.2.2.1.1 P1A3 sub
2/8/1900 0:00 12/30/1899 0:00 5.2.2.1.1 P1A3 sub
2/20/1900 0:00 12/30/1899 0:00 5.2.2.1.3 P1A3 sub
2/22/1900 0:00 12/30/1899 0:00 5.2.2.1.6 P1A3 BAS
8/12/1900 0:00 1/16/1969 5:02 MEP P1A3 MEP
4/9/1900 0:00 12/30/1899 0:00 5.2.2.2.1 P1A3 1ST
2/20/1901 0:00 12/30/1899 0:00 5.2.2.2.1 P1A3 1ST
9/26/1902 0:00 11/24/2295 0:00 5.2.2.2.1 P1A3 1ST
1/27/1900 0:00 12/30/1899 0:00 5.2.2.2.1 P1A3 1ST
4/20/1900 0:00 12/30/1899 0:00 5.2.2.2.1 P1A3 1ST
9/26/1902 0:00 12/30/1899 0:00 5.2.2.2.2. P1A3 1ST
4/18/1906 0:00 12/30/1899 0:00 5.2.2.2.2. P1A3 1ST
10/31/1903 0:00 12/30/1899 0:00 5.2.2.2.2. P1A3 1ST
6/22/1905 0:00 8/7/3014 0:00 5.2.2.2.2. P1A3 1ST
4/9/1900 0:00 12/30/1899 0:00 5.2.2.2.2. P1A3 1ST
3/10/1902 0:00 12/30/1899 0:00 5.2.2.2.2. P1A3 1ST
4/26/1900 0:00 12/30/1899 0:00 5.2.5.1,2,3,4 P1A3 1ST
9/26/1902 0:00 3/30/2529 11:45 5.2.5.1,2,3,4 P1A3 1ST
7/18/1900 0:00 12/30/1899 0:00 5.2.5.1,2,3,4 P1A3 1ST
3/5/1900 0:00 12/30/1899 0:00 P1A3 1ST
3/5/1900 0:00 12/30/1899 0:00 P1A3 1ST
6/12/1900 0:00 12/23/1988 0:00 P1A3 1ST
2/1/1900 0:00 12/30/1899 0:00 P1A3 1ST
12/2/1902 0:00 12/30/1899 0:00 5.2.2.2.1 P1A4 1ST
1/19/1902 0:00 12/30/1899 0:00 5.2.2.2.1 P1A4 1ST
11/30/1901 0:00 9/13/3087 0:00 5.2.2.2.1 P1A4 1ST
3/3/1900 0:00 12/30/1899 0:00 5.2.2.2.1 P1A4 1ST
8/27/1900 0:00 12/30/1899 0:00 5.2.2.2.1 P1A4 1ST
3/10/1902 0:00 12/30/1899 0:00 5.2.2.2.2. P1A4 1ST
8/11/1905 0:00 12/30/1899 0:00 5.2.2.2.2. P1A4 1ST
4/14/1903 0:00 12/30/1899 0:00 5.2.2.2.2. P1A4 1ST
5/3/1905 0:00 8/7/3014 0:00 5.2.2.2.2. P1A4 1ST
5/29/1900 0:00 12/30/1899 0:00 5.2.2.2.2. P1A4 1ST
10/11/1901 0:00 12/30/1899 0:00 5.2.2.2.2. P1A4 1ST
9/6/1900 0:00 12/30/1899 0:00 5.2.5.1,2,3,4 P1A4 1ST
4/14/1903 0:00 8/4/2332 9:21 5.2.5.1,2,3,4 P1A4 1ST
10/26/1900 0:00 12/30/1899 0:00 5.2.5.1,2,3,4 P1A4 1ST
5/28/1900 0:00 12/30/1899 0:00 P1A4 1ST
5/28/1900 0:00 12/30/1899 0:00 P1A4 1ST
1/7/1901 0:00 6/1/2300 0:00 P1A4 1ST
3/15/1900 0:00 12/30/1899 0:00 P1A4 1ST
3/10/1902 0:00 12/30/1899 0:00 5.2.2.2.1 P1A5 1ST
5/14/1901 0:00 12/30/1899 0:00 5.2.2.2.1 P1A5 1ST
5/9/1901 0:00 12/2/2196 0:00 5.2.2.2.1 P1A5 1ST
2/18/1900 0:00 12/30/1899 0:00 5.2.2.2.1 P1A5 1ST
7/16/1900 0:00 12/30/1899 0:00 5.2.2.2.1 P1A5 1ST
6/18/1902 0:00 12/30/1899 0:00 5.2.2.2.2. P1A5 1ST
1/8/1906 0:00 12/30/1899 0:00 5.2.2.2.2. P1A5 1ST
10/31/1903 0:00 12/30/1899 0:00 5.2.2.2.2. P1A5 1ST
6/22/1905 0:00 4/16/2987 1:12 5.2.2.2.2. P1A5 1ST
4/9/1900 0:00 12/30/1899 0:00 5.2.2.2.2. P1A5 1ST
8/22/1901 0:00 12/30/1899 0:00 5.2.2.2.2. P1A5 1ST
7/18/1900 0:00 12/30/1899 0:00 5.2.5.1,2,3,4 P1A5 1ST
4/14/1903 0:00 8/31/2069 4:48 5.2.5.1,2,3,4 P1A5 1ST
9/6/1900 0:00 12/30/1899 0:00 5.2.5.1,2,3,4 P1A5 1ST
4/26/1900 0:00 12/30/1899 0:00 P1A5 1ST
4/26/1900 0:00 12/30/1899 0:00 P1A5 1ST
10/17/1900 0:00 4/14/1962 0:00 P1A5 1ST
2/26/1900 0:00 12/30/1899 0:00 P1A5 1ST
11/15/1900 0:00 5/25/2120 0:00 5.2.2.1.1 P1A3 sub
12/30/1899 0:00 12/30/1899 0:00 5.2.2.1.1 P1A3 sub
12/30/1899 0:00 12/30/1899 0:00 5.2.1.2 P1A3 sub
12/30/1899 0:00 12/30/1899 0:00 5.1.6.1 P1A3 sub
12/30/1899 0:00 12/30/1899 0:00 5.2.2.1.1 P1A3 sub
12/30/1899 0:00 12/30/1899 0:00 5.1.4.1 P1A3 sub
12/30/1899 0:00 12/30/1899 0:00 5.2.2.1.1 P1A3 sub
12/30/1899 0:00 12/30/1899 0:00 5.2.1.2 P1A3 sub
12/30/1899 0:00 12/30/1899 0:00 P1A3 sub
12/30/1899 0:00 12/30/1899 0:00 5.1.6.2 P1A3 sub
12/30/1899 0:00 12/30/1899 0:00 5.1.6.2 P1A3 sub
2/13/1900 0:00 12/30/1899 0:00 5.2.2.1.1 P1A3 sub
3/30/1900 0:00 12/30/1899 0:00 5.2.2.1.5 P1A1 GR
6/1/1904 0:00 12/30/1899 0:00 5.2.2.1.5 P1A1 GR
5/3/1900 0:00 9/15/2570 12:00 5.2.2.1.5 P1A1 GR
4/17/1900 0:00 12/30/1899 0:00 5.2.2.1.5 P1A1 GR
12/30/1899 0:00 12/30/1899 0:00 5.2.2.1.5 P1A1 GR
12/30/1899 0:00 12/30/1899 0:00 5.2.2.1.5 P1A1 GR
5/23/1900 0:00 6/19/1935 20:52 5.1.2.3 P1A1 GR
6/21/1900 0:00 9/5/1964 0:00 MEP P1A1 GR
2/19/1900 0:00 12/30/1899 0:00 5.2.2.1.5 P1A2 GR
7/3/1901 0:00 12/30/1899 0:00 5.2.2.1.5 P1A2 GR
1/27/1900 0:00 9/29/2280 22:48 5.2.2.1.5 P1A2 GR
2/5/1900 0:00 12/30/1899 0:00 5.2.2.1.5 P1A2 GR
12/30/1899 0:00 12/30/1899 0:00 5.2.2.1.5 P1A2 GR
12/30/1899 0:00 12/30/1899 0:00 5.2.2.1.5 P1A2 GR
4/11/1900 0:00 9/29/1917 10:19 5.1.2.3 P1A2 GR
12/30/1899 0:00 12/30/1899 0:00 MEP P1A2 GR
2/8/1900 0:00 12/30/1899 0:00 5.2.2.1.5 P1A3 GR
3/3/1901 0:00 12/30/1899 0:00 5.2.2.1.5 P1A3 GR
1/1/1900 0:00 11/17/2362 9:36 5.2.2.1.5 P1A3 GR
5/22/1900 0:00 12/30/1899 0:00 5.2.2.1.5 P1A3 GR
4/23/1900 0:00 12/30/1899 0:00 5.2.2.1.5 P1A3 GR
3/12/1900 0:00 12/30/1899 0:00 5.2.2.1.5 P1A3 GR
4/15/1900 0:00 5/9/1916 19:55 5.1.2.3 P1A3 GR
3/17/1900 0:00 5/8/1926 0:00 P1A3 GR
3/30/1900 0:00 12/30/1899 0:00 5.2.2.1.5 P1A4 GR
9/1/1902 0:00 12/30/1899 0:00 5.2.2.1.5 P1A4 GR
2/18/1900 0:00 6/17/2575 0:00 5.2.2.1.5 P1A4 GR
3/5/1900 0:00 12/30/1899 0:00 5.2.2.1.5 P1A4 GR
12/30/1899 0:00 12/30/1899 0:00 5.2.2.1.5 P1A4 GR
12/30/1899 0:00 12/30/1899 0:00 5.2.2.1.5 P1A4 GR
5/26/1900 0:00 6/16/1921 15:21 5.1.2.3 P1A4 GR
12/30/1899 0:00 12/30/1899 0:00 P1A4 GR
12/30/1899 0:00 12/30/1899 0:00
12/30/1899 0:00 12/30/1899 0:00
12/30/1899 0:00 12/30/1899 0:00 ENG
12/30/1899 0:00 12/30/1899 0:00 ENG
12/30/1899 0:00 12/30/1899 0:00 ENG
12/30/1899 0:00 12/30/1899 0:00 ENG
12/30/1899 0:00 12/30/1899 0:00 ENG
12/30/1899 0:00 12/30/1899 0:00 ENG
12/30/1899 0:00 12/30/1899 0:00 ENG
12/30/1899 0:00 12/30/1899 0:00 ENG
12/30/1899 0:00 12/30/1899 0:00 ENG
12/30/1899 0:00 12/30/1899 0:00 ENG
12/30/1899 0:00 12/30/1899 0:00 ENG
12/30/1899 0:00 12/30/1899 0:00 PRC
12/30/1899 0:00 12/30/1899 0:00 PRC
12/30/1899 0:00 12/30/1899 0:00 PRC
12/30/1899 0:00 12/30/1899 0:00 PRC
12/30/1899 0:00 12/30/1899 0:00 PRC
12/30/1899 0:00 12/30/1899 0:00 PRC
12/30/1899 0:00 12/30/1899 0:00 PRC
12/30/1899 0:00 12/30/1899 0:00 PRC
12/30/1899 0:00 12/30/1899 0:00 PRC
12/30/1899 0:00 12/30/1899 0:00 PRC
12/30/1899 0:00 12/30/1899 0:00 PRC
12/30/1899 0:00 12/30/1899 0:00 PRC
12/30/1899 0:00 12/30/1899 0:00 PRC
12/30/1899 0:00 12/30/1899 0:00 PRC
12/30/1899 0:00 12/30/1899 0:00 PRC
12/30/1899 0:00 12/30/1899 0:00 PRC
12/30/1899 0:00 12/30/1899 0:00 PRC
12/30/1899 0:00 12/30/1899 0:00 PRC
6/22/1905 0:00 12/30/1899 0:00 5.2.4 P1A4 1ST
7/27/1906 0:00 12/30/1899 0:00 5.2.4 P1A4 1ST
10/31/1903 0:00 4/17/3287 0:00 5.2.4 P1A4 1ST
4/9/1900 0:00 12/30/1899 0:00 5.2.4 P1A4 1ST
10/26/1900 0:00 12/30/1899 0:00 5.2.2.2.1 P1A3 1ST
10/26/1900 0:00 12/30/1899 0:00 5.2.2.2.1 P1A3 1ST
4/9/1900 0:00 10/27/2592 0:00 5.2.2.2.1 P1A3 1ST
8/22/1901 0:00 12/30/1899 0:00 5.2.2.2.1 P1A4 1ST
8/22/1901 0:00 12/30/1899 0:00 5.2.2.2.1 P1A4 1ST
7/18/1900 0:00 11/24/2295 0:00 5.2.2.2.1 P1A4 1ST
10/26/1900 0:00 12/30/1899 0:00 RM
7/18/1900 0:00 12/30/1899 0:00 RM
3/20/1900 0:00 10/15/2066 0:00 RM
10/26/1900 0:00 12/30/1899 0:00 RM
7/18/1900 0:00 12/30/1899 0:00 RM
3/20/1900 0:00 10/15/2066 0:00 RM
10/26/1900 0:00 12/30/1899 0:00 RM
7/18/1900 0:00 12/30/1899 0:00 RM
3/20/1900 0:00 10/15/2066 0:00 RM
10/26/1900 0:00 12/30/1899 0:00 RM
7/18/1900 0:00 12/30/1899 0:00 RM
3/20/1900 0:00 10/15/2066 0:00 RM
10/26/1900 0:00 12/30/1899 0:00 RM
7/18/1900 0:00 12/30/1899 0:00 RM
3/20/1900 0:00 10/15/2066 0:00 RM
10/26/1900 0:00 12/30/1899 0:00 RM
7/18/1900 0:00 12/30/1899 0:00 RM
4/9/1900 0:00 5/24/1983 0:00 RM
12/30/1899 0:00 12/30/1899 0:00 5.2.1.1 P1A1 sub
12/30/1899 0:00 12/30/1899 0:00 5.2.1.1 P1A2 sub
12/30/1899 0:00 12/30/1899 0:00 5.2.1.1 P1A3 sub
10/26/1900 0:00 5/22/2009 9:50 5.1.2.3 P1A1 sub
5/23/1900 0:00 12/30/1899 0:00 5.1.2.3 P1A1 sub
7/18/1900 0:00 2/5/1962 10:19 5.1.2.3 P1A2 sub
2/20/1900 0:00 12/30/1899 0:00 5.1.2.3 P1A2 sub
7/18/1900 0:00 6/29/1975 19:55 5.1.2.3 P1A3 sub
4/15/1900 0:00 12/30/1899 0:00 5.1.2.3 P1A3 sub
12/30/1899 0:00 12/30/1899 0:00 MEP P1A1 TANKS
3/10/1902 0:00 8/7/2230 0:00 5.2.2.1.1 RM
4/14/1903 0:00 5/27/2192 0:00 5.2.2.1.5 RM
5/14/1901 0:00 3/13/2010 0:00 5.2.2.1.6 RM
7/18/1900 0:00 5/8/1944 0:00 5.1.2.3 RM
12/30/1899 0:00 12/30/1899 0:00 MOB
12/30/1899 0:00 12/30/1899 0:00 5.2.1.2 P1A4 sub
4/6/1900 0:00 12/30/1899 0:00 5.2.1.2 P1A4 sub
12/30/1899 0:00 12/30/1899 0:00 5.2.1.2 P1A4 sub
5/31/1900 0:00 12/30/1899 0:00 5.2.2.1.1 P1A4 sub
4/14/1903 0:00 2/2/2585 4:48 5.2.2.1.6 P1A4 BAS
8/6/1900 0:00 4/19/2126 4:19 MEP P1A4 MEP
7/18/1900 0:00 9/14/1988 0:00 5.1.2.3 P1A4 sub
12/30/1899 0:00 12/30/1899 0:00 5.1.6.1 P1A4 sub
12/30/1899 0:00 12/30/1899 0:00 5.1.6.2 P1A4 sub
12/30/1899 0:00 12/30/1899 0:00 5.1.6.2 P1A4 sub
3/30/1900 0:00 8/3/2182 11:31 5.2.2.2.1 P1A4 sub
3/10/1905 0:00 11/17/2958 19:12 5.2.2.1.3 P1A4 sub
12/30/1899 0:00 12/30/1899 0:00 5.2.2.1.1 P1A4 sub
8/27/1906 0:00 8/11/3883 0:00 5.2.2.1.1 P1A4 sub
12/30/1899 0:00 12/30/1899 0:00 5.1.4.1 P1A4 sub
12/30/1899 0:00 12/30/1899 0:00 5.2.2.1.1 P1A4 sub
12/30/1899 0:00 12/30/1899 0:00 5.2.2.1.1 P1A4 sub
12/30/1899 0:00 12/30/1899 0:00 5.2.2.2.1 P1A4 sub
12/30/1899 0:00 12/30/1899 0:00 5.2.2.2.1 P1A4 sub
12/30/1899 0:00 12/30/1899 0:00 5.2.2.2.1 P1A4 sub
12/30/1899 0:00 12/30/1899 0:00 5.2.2.1.3 P1A4 sub
12/30/1899 0:00 12/30/1899 0:00 5.2.2.1.3 P1A4 sub
12/30/1899 0:00 12/30/1899 0:00 5.2.2.1.3 P1A4 sub
4/9/1900 0:00 12/30/1899 0:00 5.1.2.3 P1A4 sub
12/30/1899 0:00 12/30/1899 0:00 5.2.1.2 P1A4 sub
4/20/1900 0:00 3/28/1910 17:02 MEP P1A4 MEP
2/18/1900 0:00 9/11/1945 14:24 5.1.4.1 P1A4 BAS
4/9/1900 0:00 8/30/1930 0:00 5.1.6.1 P1A4 BAS
9/26/1902 0:00 12/30/1899 0:00 5.2.2.1.6 P1A4 BAS
7/5/1900 0:00 12/30/1899 0:00 5.2.2.1.6 P1A4 BAS
11/2/1902 0:00 12/7/2276 5:45 5.1.5.4 P1A4 BAS
4/13/1900 0:00 5/2/1935 23:02 5.1.5.1 P1A4 BAS
11/2/1902 0:00 6/24/2194 0:00 5.1.5.3 P1A4 BAS
11/2/1902 0:00 6/18/2088 2:52 5.1.5.2 P1A4 BAS
12/30/1899 0:00 12/30/1899 0:00 5.2.2.1.1 P1A4 sub
12/30/1899 0:00 12/30/1899 0:00 5.1.6.2 P1A4 sub
12/30/1899 0:00 12/30/1899 0:00 5.1.6.2 P1A4 sub
12/30/1899 0:00 12/30/1899 0:00 5.2.2.1.1 P1A4 sub
5/14/1901 0:00 10/19/2340 0:00 5.2.2.1.1 P1A4 sub
12/30/1899 0:00 12/30/1899 0:00 5.2.2.1.1 P1A4 sub
12/30/1899 0:00 12/30/1899 0:00 5.2.2.1.1 P1A4 sub
5/29/1900 0:00 12/30/1899 0:00 5.2.2.2.1 P1A4 sub
4/6/1900 0:00 12/30/1899 0:00 5.2.2.1.1 P1A4 sub
2/28/1900 0:00 12/30/1899 0:00 5.2.2.1.1 P1A4 sub
5/29/1900 0:00 12/30/1899 0:00 5.2.2.1.3 P1A4 sub
4/9/1900 0:00 12/30/1899 0:00 5.2.2.1.6 P1A4 BAS
6/11/1900 0:00 2/8/1963 12:57 MEP P1A4 MEP
12/30/1899 0:00 12/30/1899 0:00 5.2.1.2 P1A5 sub
4/9/1900 0:00 12/30/1899 0:00 5.2.1.2 P1A5 sub
12/30/1899 0:00 12/30/1899 0:00 5.2.1.2 P1A5 sub
6/12/1900 0:00 12/30/1899 0:00 5.2.2.1.1 P1A5 sub
8/7/1902 0:00 11/1/2435 14:24 5.2.2.1.6 P1A5 BAS
6/19/1900 0:00 4/19/2126 4:19 MEP P1A5 MEP
9/6/1900 0:00 3/2/1986 2:09 P1A5 sub
12/30/1899 0:00 12/30/1899 0:00 5.1.6.1 P1A5 sub
12/30/1899 0:00 12/30/1899 0:00 5.1.6.2 P1A5 sub
12/30/1899 0:00 12/30/1899 0:00 5.1.6.2 P1A5 sub
6/28/1900 0:00 7/14/2083 13:26 5.2.2.2.1 P1A5 sub
11/14/1903 0:00 3/18/2728 0:00 5.2.2.1.3 P1A5 sub
12/30/1899 0:00 12/30/1899 0:00 5.2.2.1.1 P1A5 sub
9/3/1907 0:00 1/3/3553 0:00 5.2.2.1.1 P1A5 sub
12/30/1899 0:00 12/30/1899 0:00 5.1.4.1 P1A5 sub
12/30/1899 0:00 12/30/1899 0:00 5.2.2.1.1 P1A5 sub
12/30/1899 0:00 12/30/1899 0:00 5.2.2.1.1 P1A5 sub
12/30/1899 0:00 12/30/1899 0:00 5.2.2.2.1 P1A5 sub
12/30/1899 0:00 12/30/1899 0:00 5.2.2.2.1 P1A5 sub
12/30/1899 0:00 12/30/1899 0:00 5.2.2.2.1 P1A5 sub
12/30/1899 0:00 12/30/1899 0:00 5.2.2.1.3 P1A5 sub
12/30/1899 0:00 12/30/1899 0:00 5.2.2.1.3 P1A5 sub
12/30/1899 0:00 12/30/1899 0:00 5.2.2.1.3 P1A5 sub
4/9/1900 0:00 12/30/1899 0:00 P1A5 sub
12/30/1899 0:00 12/30/1899 0:00 5.2.1.2 P1A5 sub
12/30/1899 0:00 12/30/1899 0:00 MEP P1A5 subsoil
12/30/1899 0:00 12/30/1899 0:00 MEP P1A5 subsoil
3/27/1900 0:00 3/28/1910 17:02 MEP P1A5 MEP
12/30/1899 0:00 12/30/1899 0:00 MEP P1A5 subsoil
4/1/1900 0:00 9/28/1935 11:31 5.1.4.1 P1A5 BAS
4/26/1900 0:00 11/7/1932 0:00 5.1.6.1 P1A5 BAS
3/10/1902 0:00 12/30/1899 0:00 5.2.2.1.6 P1A5 BAS
4/9/1900 0:00 12/30/1899 0:00 5.2.2.1.6 P1A5 BAS
3/21/1902 0:00 1/20/2132 18:14 5.1.5.4 P1A5 BAS
3/21/1900 0:00 10/2/1921 0:57 5.1.5.1 P1A5 BAS
3/21/1902 0:00 4/16/2081 0:00 5.1.5.3 P1A5 BAS
3/21/1902 0:00 1/9/2016 21:07 5.1.5.2 P1A5 BAS
12/30/1899 0:00 12/30/1899 0:00 MEP P1A5 subsoil
12/30/1899 0:00 12/30/1899 0:00 5.2.2.1.1 P1A5 sub
12/30/1899 0:00 12/30/1899 0:00 5.1.6.2 P1A5 sub
12/30/1899 0:00 12/30/1899 0:00 5.1.6.2 P1A5 sub
12/30/1899 0:00 12/30/1899 0:00 5.2.2.1.1 P1A5 sub
8/27/1900 0:00 11/21/2111 16:48 5.2.2.1.1 P1A5 sub
3/29/1900 0:00 12/30/1899 0:00 5.2.2.1.1 P1A5 sub
1/29/1900 0:00 12/30/1899 0:00 5.2.2.1.1 P1A5 sub
5/29/1900 0:00 12/30/1899 0:00 5.2.2.2.1 P1A5 sub
5/31/1900 0:00 12/30/1899 0:00 5.2.2.1.1 P1A5 sub
2/8/1900 0:00 12/30/1899 0:00 5.2.2.1.1 P1A5 sub
4/9/1900 0:00 12/30/1899 0:00 5.2.2.1.3 P1A5 sub
4/4/1900 0:00 12/30/1899 0:00 5.2.2.1.6 P1A5 BAS
6/30/1900 0:00 2/5/1978 10:19 MEP P1A5 MEP
5/6/1900 0:00 12/30/1899 0:00 5.2.2.2.1 P1A1 GR
3/10/1902 0:00 12/30/1899 0:00 5.2.2.2.1 P1A1 GR
2/8/1904 0:00 12/24/2770 0:00 5.2.2.2.1 P1A1 GR
3/31/1900 0:00 12/30/1899 0:00 5.2.2.2.1 P1A1 GR
12/30/1899 0:00 12/30/1899 0:00 5.2.2.2.1 P1A1 GR
12/30/1899 0:00 12/30/1899 0:00 5.2.2.2.2. P1A1 GR
7/31/1909 0:00 12/30/1899 0:00 5.2.2.2.2. P1A1 GR
6/22/1905 0:00 12/30/1899 0:00 5.2.2.2.2. P1A1 GR
7/31/1909 0:00 8/6/4895 23:02 5.2.2.2.2. P1A1 GR
4/22/1900 0:00 12/30/1899 0:00 5.2.2.2.2. P1A1 GR
9/26/1902 0:00 12/30/1899 0:00 5.2.2.2.2. P1A1 GR
7/18/1900 0:00 12/30/1899 0:00 5.2.5.1,2,3,4 P1A1 GR
9/26/1902 0:00 6/6/3329 12:00 5.2.5.1,2,3,4 P1A1 GR
12/25/1900 0:00 12/30/1899 0:00 5.2.5.1,2,3,4 P1A1 GR
5/27/1900 0:00 12/30/1899 0:00 P1A1 GR
5/27/1900 0:00 12/30/1899 0:00 P1A1 GR
1/4/1901 0:00 4/4/2375 18:00 P1A1 GR
3/14/1900 0:00 12/30/1899 0:00 P1A1 GR
3/31/1900 0:00 12/30/1899 0:00 5.2.2.2.1 P1A2 GR
3/5/1901 0:00 12/30/1899 0:00 5.2.2.2.1 P1A2 GR
6/18/1902 0:00 6/9/2533 0:00 5.2.2.2.1 P1A2 GR
1/27/1900 0:00 12/30/1899 0:00 5.2.2.2.1 P1A2 GR
12/30/1899 0:00 12/30/1899 0:00 5.2.2.2.1 P1A2 GR
8/1/1900 0:00 12/30/1899 0:00 5.2.2.2.2. P1A2 GR
12/30/1899 0:00 12/30/1899 0:00 5.2.2.2.2. P1A2 GR
12/30/1899 0:00 12/30/1899 0:00 5.2.2.2.2. P1A2 GR
6/22/1905 0:00 6/2/4022 19:40 5.2.2.2.2. P1A2 GR
4/9/1900 0:00 12/30/1899 0:00 5.2.2.2.2. P1A2 GR
12/30/1899 0:00 12/30/1899 0:00 5.2.2.2.2. P1A2 GR
2/2/1900 0:00 12/30/1899 0:00 5.2.5.1,2,3,4 P1A2 GR
2/1/1902 0:00 12/30/2894 0:00 5.2.5.1,2,3,4 P1A2 GR
6/5/1900 0:00 12/30/1899 0:00 5.2.5.1,2,3,4 P1A2 GR
3/24/1900 0:00 12/30/1899 0:00 P1A2 GR
3/24/1900 0:00 12/30/1899 0:00 P1A2 GR
7/28/1900 0:00 12/16/2116 18:00 P1A2 GR
2/10/1900 0:00 12/30/1899 0:00 P1A2 GR
5/15/1900 0:00 12/30/1899 0:00 5.2.2.2.1 P1A3 GR
2/20/1901 0:00 12/30/1899 0:00 5.2.2.2.1 P1A3 GR
3/30/1902 0:00 10/19/2691 0:00 5.2.2.2.1 P1A3 GR
2/8/1900 0:00 12/30/1899 0:00 5.2.2.2.1 P1A3 GR
12/30/1899 0:00 12/30/1899 0:00 5.2.2.2.1 P1A3 GR
6/18/1902 0:00 12/30/1899 0:00 5.2.2.2.2. P1A3 GR
7/27/1906 0:00 12/30/1899 0:00 5.2.2.2.2. P1A3 GR
8/12/1903 0:00 12/30/1899 0:00 5.2.2.2.2. P1A3 GR
6/22/1905 0:00 2/17/3386 0:00 5.2.2.2.2. P1A3 GR
4/10/1900 0:00 12/30/1899 0:00 5.2.2.2.2. P1A3 GR
3/10/1902 0:00 12/30/1899 0:00 5.2.2.2.2. P1A3 GR
5/9/1900 0:00 12/30/1899 0:00 5.2.5.1,2,3,4 P1A3 GR
7/23/1903 0:00 10/30/2959 8:38 5.2.5.1,2,3,4 P1A3 GR
10/26/1900 0:00 12/30/1899 0:00 5.2.5.1,2,3,4 P1A3 GR
3/5/1900 0:00 12/30/1899 0:00 P1A3 GR
3/5/1900 0:00 12/30/1899 0:00 P1A3 GR
6/12/1900 0:00 10/14/2317 0:00 P1A3 GR
2/1/1900 0:00 12/30/1899 0:00 P1A3 GR
4/24/1900 0:00 12/30/1899 0:00 5.2.2.2.1 P1A4 GR
8/7/1902 0:00 12/30/1899 0:00 5.2.2.2.1 P1A4 GR
9/24/1901 0:00 3/12/3523 0:00 5.2.2.2.1 P1A4 GR
2/25/1900 0:00 12/30/1899 0:00 5.2.2.2.1 P1A4 GR
12/30/1899 0:00 12/30/1899 0:00 5.2.2.2.1 P1A4 GR
5/29/1900 0:00 12/30/1899 0:00 5.2.2.2.2. P1A4 GR
12/30/1899 0:00 12/30/1899 0:00 5.2.2.2.2. P1A4 GR
12/30/1899 0:00 12/30/1899 0:00 5.2.2.2.2. P1A4 GR
6/22/1905 0:00 8/31/3757 0:00 5.2.2.2.2. P1A4 GR
5/29/1900 0:00 12/30/1899 0:00 5.2.2.2.2. P1A4 GR
12/30/1899 0:00 12/30/1899 0:00 5.2.2.2.2. P1A4 GR
4/2/1900 0:00 12/30/1899 0:00 5.2.5.1,2,3,4 P1A4 GR
7/18/1900 0:00 9/15/6769 10:04 5.2.5.1,2,3,4 P1A4 GR
2/3/1901 0:00 12/30/1899 0:00 5.2.5.1,2,3,4 P1A4 GR
5/28/1900 0:00 12/30/1899 0:00 P1A4 GR
5/28/1900 0:00 12/30/1899 0:00 P1A4 GR
1/7/1901 0:00 3/30/2314 12:00 P1A4 GR
3/15/1900 0:00 12/30/1899 0:00 P1A4 GR
3/30/1900 0:00 12/30/1899 0:00 5.2.2.2.1 P1A5 GR
12/30/1899 0:00 12/30/1899 0:00 5.2.2.2.1 P1A5 GR
11/16/1901 0:00 11/5/2493 0:00 5.2.2.2.1 P1A5 GR
2/18/1900 0:00 12/30/1899 0:00 5.2.2.2.1 P1A5 GR
12/30/1899 0:00 12/30/1899 0:00 5.2.2.2.1 P1A5 GR
6/19/1900 0:00 12/30/1899 0:00 5.2.2.2.2. P1A5 GR
7/27/1906 0:00 12/30/1899 0:00 5.2.2.2.2. P1A5 GR
10/31/1903 0:00 12/30/1899 0:00 5.2.2.2.2. P1A5 GR
1/8/1906 0:00 8/31/3757 0:00 5.2.2.2.2. P1A5 GR
5/29/1900 0:00 12/30/1899 0:00 5.2.2.2.2. P1A5 GR
10/11/1901 0:00 12/30/1899 0:00 5.2.2.2.2. P1A5 GR
9/6/1900 0:00 12/30/1899 0:00 5.2.5.1,2,3,4 P1A5 GR
9/15/1903 0:00 11/20/2846 19:26 5.2.5.1,2,3,4 P1A5 GR
12/15/1900 0:00 12/30/1899 0:00 5.2.5.1,2,3,4 P1A5 GR
4/26/1900 0:00 12/30/1899 0:00 P1A5 GR
4/26/1900 0:00 12/30/1899 0:00 P1A5 GR
10/17/1900 0:00 6/20/2208 18:00 P1A5 GR
2/26/1900 0:00 12/30/1899 0:00 P1A5 GR
3/2/1902 0:00 8/3/2282 22:48 5.2.2.1.1 P1A4 sub
12/30/1899 0:00 12/30/1899 0:00 5.2.2.1.1 P1A4 sub
12/30/1899 0:00 12/30/1899 0:00 5.2.1.2 P1A4 sub
12/30/1899 0:00 12/30/1899 0:00 5.1.6.1 P1A4 sub
12/30/1899 0:00 12/30/1899 0:00 5.2.2.1.1 P1A4 sub
12/30/1899 0:00 12/30/1899 0:00 5.1.4.1 P1A4 sub
12/30/1899 0:00 12/30/1899 0:00 5.2.2.1.1 P1A4 sub
12/30/1899 0:00 12/30/1899 0:00 5.2.1.2 P1A4 sub
12/30/1899 0:00 12/30/1899 0:00 P1A4 sub
12/30/1899 0:00 12/30/1899 0:00 5.1.6.2 P1A4 sub
12/30/1899 0:00 12/30/1899 0:00 5.1.6.2 P1A4 sub
4/6/1900 0:00 12/30/1899 0:00 5.2.2.1.1 P1A4 sub
12/30/1899 0:00 12/30/1899 0:00 5.2.1.2 P1A4 sub
7/11/1900 0:00 12/30/1899 0:00 5.2.1.2 P1A4 sub
12/30/1899 0:00 12/30/1899 0:00 5.1.4.1 P1A4 sub
12/30/1899 0:00 12/30/1899 0:00 5.1.6.1 P1A4 sub
12/30/1899 0:00 12/30/1899 0:00 5.2.1.2 P1A4 sub
12/30/1899 0:00 12/30/1899 0:00 5.2.1.2 P1A4 sub
12/30/1899 0:00 12/30/1899 0:00 5.1.6.2 P1A4 sub
12/30/1899 0:00 12/30/1899 0:00 5.1.6.2 P1A4 sub
3/20/1900 0:00 12/30/1899 0:00 5.2.2.1.2 P1A4 sub
12/25/1900 0:00 12/30/1899 0:00 5.2.2.1.2 P1A4 sub
12/30/1899 0:00 12/30/1899 0:00 5.2.2.1.2 P1A4 sub
3/18/1908 0:00 1/8/5757 0:00 5.2.2.1.2 P1A4 sub
3/30/1900 0:00 12/30/1899 0:00 5.2.2.1.2 P1A4 sub
12/30/1899 0:00 12/30/1899 0:00 5.2.2.1.2 P1A4 sub
12/30/1899 0:00 12/30/1899 0:00 5.2.2.1.2 P1A4 sub
12/30/1899 0:00 12/30/1899 0:00 5.2.2.1.2 P1A4 sub
12/30/1899 0:00 12/30/1899 0:00 5.1.6.2 P1A4 sub
2/3/1901 0:00 12/30/1899 0:00 5.2.2.1.2 P1A4 sub
12/30/1899 0:00 12/30/1899 0:00 MEP P1A5 subsoil
10/26/1900 0:00 12/30/1899 0:00 5.2.2.2.1 P1A3 GR
10/26/1900 0:00 12/30/1899 0:00 5.2.2.2.1 P1A3 GR
4/9/1900 0:00 10/27/2592 0:00 5.2.2.2.1 P1A3 GR
10/28/1901 0:00 12/30/1899 0:00 5.2.4 P1A4 GR
12/8/1900 0:00 12/30/1899 0:00 5.2.4 P1A4 GR
12/30/1899 0:00 12/30/1899 0:00 5.2.4 P1A4 GR
4/9/1900 0:00 12/30/1899 0:00 5.2.4 P1A4 GR
2/23/1900 0:00 12/30/1899 0:00 5.2.2.2.1 P1A4 GR
8/22/1901 0:00 12/30/1899 0:00 5.2.2.2.1 P1A4 GR
7/18/1900 0:00 11/24/2295 0:00 5.2.2.2.1 P1A4 GR
12/30/1899 0:00 12/30/1899 0:00 5.2.1.1 P1A4 sub
12/30/1899 0:00 12/30/1899 0:00 5.2.1.1 P1A5 sub
10/26/1900 0:00 3/1/2010 15:21 5.1.2.3 P1A4 sub
5/26/1900 0:00 12/30/1899 0:00 5.1.2.3 P1A4 sub
9/6/1900 0:00 3/2/1986 2:09 P1A5 sub
4/9/1900 0:00 12/30/1899 0:00 P1A5 sub
critical_flag delete_record_flag
(*)Critical Delete This Row
Y
N
N
Y
Y
N
N
N
N
N
N
N
N
N
Y
N
N
N
N
N
N
N
N
N
N
N
Y
Y
Y
Y
Y
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Y
Y
Y
Y
N
N
N
N
N
N
N
N
Y
N
N
N
N
N
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
N
N
Y
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Y
Y
Y
Y
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Y
Y
Y
Y
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Y
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Y
Y
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Y
Y
Y
Y
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Y
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Y
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
WBS Code WBS Name Total Activities
project-power bi Project-powerbi 703
project-power bi.3 GENERAL 9
project-power bi.3.9 CONTRACT/OTHER MILESTONES 5
project-power bi.3.1 DOCUMENTATION 4
project-power bi.4 ENGINEERING 15
project-power bi.4.3 IFC DRAWINGS ( Client Scope ) 5
project-power bi.4.3.1 IFC Drawing Package for Undergro 0
project-power bi.4.3.2 IFC Drawing Package for Phase 1 5
project-power bi.4.10 SHOP DRAWING 10
project-power bi.4.10.5 Phase 01 10
project-power bi.4.10.5.1 Shop Drawing for Area 1 2
project-power bi.4.10.5.2 Shop Drawing for Area 2 2
project-power bi.4.10.5.3 Shop Drawing for Area 3 2
project-power bi.4.10.5.4 Shop Drawing for Area 4 2
project-power bi.4.10.5.5 Shop Drawing for Area 5 2
project-power bi.11 PROCUREMENT 100
project-power bi.11.8 PROCUREMENT 100
project-power bi.11.8.1 Civil Materials 70
project-power bi.11.8.1.13 Supply of Precast Slab for Phase 1 4
project-power bi.11.8.1.7 Backfilling Materials 6
project-power bi.11.8.1.6 Asphalt 6
project-power bi.11.8.1.3 Vapour Barrier Polyethylene Shee 6
project-power bi.11.8.1.5 Termite Control 6
project-power bi.11.8.1.9 Water Proofing ( Elastroplastome 6
project-power bi.11.8.1.8 Filler Board 6
project-power bi.11.8.1.1 Ready Mix Concrete 6
project-power bi.11.8.1.10 Curing Compound 6
project-power bi.11.8.1.11 Concrete Repair 6
project-power bi.11.8.1.2 Rebar 6
project-power bi.11.8.1.4 Accessories for Post Tension Slab 6
project-power bi.11.8.2 Electrical Materials 18
project-power bi.11.8.2.3 Grounding System 6
project-power bi.11.8.2.2 Lightning Protection System 6
project-power bi.11.8.2.1 PVC Conduit pipes Sleeves 6
project-power bi.11.8.4 Plumbing Materials 12
project-power bi.11.8.4.1 Drainage uPVC Pipes 6
project-power bi.11.8.4.2 Floor cleanouts , Floor Drain, Floo 6
project-power bi.5 CONSTRUCTION 579
project-power bi.5.2 MOBILIZATION 7
project-power bi.5.2.1 Site Office & Facilities 5
project-power bi.5.2.2 Laydown Area 1
project-power bi.5.2.3 Manpower Mobilization to Site 1
project-power bi.5.6 MAIN BUILDING 542
project-power bi.5.6.1 Area 01 102
project-power bi.5.6.1.4 Substructure Works 76
project-power bi.5.6.1.4.1 Blinding Concrete Works 6
project-power bi.5.6.1.4.2 Isolated Concrete Foundation Wo 8
project-power bi.5.6.1.4.3 Concrete Column Neck Works 5
project-power bi.5.6.1.4.11 Concrete Shear Wall /Sumpit Fou 8
project-power bi.5.6.1.4.4 Concrete Tie Beam Works 6
project-power bi.5.6.1.4.6 Concrete Retaining Walls Footing 12
project-power bi.5.6.1.4.8 MEP Works 3
project-power bi.5.6.1.4.9 Mechanical Backfill Works 4
project-power bi.5.6.1.4.7 Tank 1 14
project-power bi.5.6.1.4.7.1 Foundation 9
project-power bi.5.6.1.4.7.2 Post Tension Basement Floor Slab 5
project-power bi.5.6.1.4.10 Slab on Grade Works 6
project-power bi.5.6.1.4.5 Asphalt Paving Works (Work by Su 4
project-power bi.5.6.1.13 Superstructure Works 26
project-power bi.5.6.1.13.14 Ground Floor EL +15.40 18
project-power bi.5.6.1.13.14.1Column -Basement to Ground Flo 5
project-power bi.5.6.1.13.14.2Beams - Ground Floor 6
project-power bi.5.6.1.13.14.3Hollow Core - Ground Floor 3
project-power bi.5.6.1.13.14.4Screed ( Ground Floor) 4
project-power bi.5.6.1.13.13 Retaining Wall Footing to GF 8
project-power bi.5.6.13 Area 02 88
project-power bi.5.6.13.4 Substructure Works 62
project-power bi.5.6.13.4.1 Blinding Concrete Works 6
project-power bi.5.6.13.4.2 Isolated Concrete Foundation Wo 8
project-power bi.5.6.13.4.3 Concrete Column Neck Works 5
project-power bi.5.6.13.4.11 Concrete Shear Wall /Sumpit Fou 8
project-power bi.5.6.13.4.4 Concrete Tie Beam Works 6
project-power bi.5.6.13.4.6 Concrete Retaining Walls Footing 12
project-power bi.5.6.13.4.8 MEP Works 3
project-power bi.5.6.13.4.9 Mechanical Backfill Works 4
project-power bi.5.6.13.4.10 Slab on Grade Works 6
project-power bi.5.6.13.4.5 Asphalt Paving Works (Work by Su 4
project-power bi.5.6.13.13 Superstructure Works 26
project-power bi.5.6.13.13.14 Ground Floor EL +15.40 18
project-power bi.5.6.13.13.14.Column -Basement to Ground Flo 5
project-power bi.5.6.13.13.14.Beams - Ground Floor 6
project-power bi.5.6.13.13.14.Hollow Core - Ground Floor 3
project-power bi.5.6.13.13.14.Screed ( Ground Floor) 4
project-power bi.5.6.13.13.13 Retaining Wall Footing to GF 8
project-power bi.5.6.4 Area 03 123
project-power bi.5.6.4.4 Substructure Works 73
project-power bi.5.6.4.4.1 Blinding Concrete Works 6
project-power bi.5.6.4.4.2 Isolated Concrete Foundation Wo 8
project-power bi.5.6.4.4.3 Concrete Column Neck Works 5
project-power bi.5.6.4.4.11 Concrete Shear Wall /Sumpit Fou 8
project-power bi.5.6.4.4.4 Concrete Tie Beam Works 6
project-power bi.5.6.4.4.6 Concrete Retaining Walls Footing 12
project-power bi.5.6.4.4.8 MEP Works 3
project-power bi.5.6.4.4.9 Mechanical Backfill Works 4
project-power bi.5.6.4.4.7 Tank 2 11
project-power bi.5.6.4.4.7.1 Foundation 9
project-power bi.5.6.4.4.7.2 Post Tension Basement Floor Slab 2
project-power bi.5.6.4.4.10 Slab on Grade Works 6
project-power bi.5.6.4.4.5 Asphalt Paving Works (Work by Su 4
project-power bi.5.6.4.13 Superstructure Works 50
project-power bi.5.6.4.13.14 Ground Floor EL +15.40 21
project-power bi.5.6.4.13.14.1Column -Basement to Ground Flo 5
project-power bi.5.6.4.13.14.5Shear Wall -Basement to Ground F 3
project-power bi.5.6.4.13.14.2Beams - Ground Floor 6
project-power bi.5.6.4.13.14.3Hollow Core - Ground Floor 3
project-power bi.5.6.4.13.14.4Screed ( Ground Floor) 4
project-power bi.5.6.4.13.2 First Floor EL +22.40 21
project-power bi.5.6.4.13.2.5 Column - Ground Floor to First Flo 5
project-power bi.5.6.4.13.2.1 Shear Wall -Ground Floor to First 3
project-power bi.5.6.4.13.2.6 Beams - 1st Floor 6
project-power bi.5.6.4.13.2.7 Hollow Core - 1st Floor 3
project-power bi.5.6.4.13.2.8 Screed ( First Floor) 4
project-power bi.5.6.4.13.13 Retaining Wall Footing to GF 8
project-power bi.5.6.2 Area 04 138
project-power bi.5.6.2.4 Substructure Works 80
project-power bi.5.6.2.4.1 Blinding Concrete Works 6
project-power bi.5.6.2.4.2 Isolated Concrete Foundation Wo 8
project-power bi.5.6.2.4.3 Concrete Column Neck Works 5
project-power bi.5.6.2.4.11 Concrete Shear Wall /Sumpit Fou 8
project-power bi.5.6.2.4.4 Concrete Tie Beam Works 6
project-power bi.5.6.2.4.6 Concrete Retaining Walls Footing 12
project-power bi.5.6.2.4.8 MEP Works 3
project-power bi.5.6.2.4.9 Mechanical Backfill Works 4
project-power bi.5.6.2.4.10 Slab on Grade Works 6
project-power bi.5.6.2.4.5 Asphalt Paving Works (Work by Su 4
project-power bi.5.6.2.4.13 Raft Foundation for Hotel Building 18
project-power bi.5.6.2.13 Superstructure Works 58
project-power bi.5.6.2.13.14 Ground Floor EL +15.40 25
project-power bi.5.6.2.13.14.1Column -Basement to Ground Flo 5
project-power bi.5.6.2.13.14.6Shear Wall -Basement to Ground F 3
project-power bi.5.6.2.13.14.2Beams - Ground Floor 6
project-power bi.5.6.2.13.14.3Hollow Core - Ground Floor 3
project-power bi.5.6.2.13.14.5Post Tension - Ground Floor 4
project-power bi.5.6.2.13.14.4Screed ( Ground Floor) 4
project-power bi.5.6.2.13.1 First Floor EL +22.40 25
project-power bi.5.6.2.13.1.5 Column - Ground Floor to First Flo 5
project-power bi.5.6.2.13.1.2 Shear Wall -Ground Floor to First 3
project-power bi.5.6.2.13.1.6 Beams - 1st Floor 6
project-power bi.5.6.2.13.1.7 Hollow Core - 1st Floor 3
project-power bi.5.6.2.13.1.1 Post Tension - 1st Floor 4
project-power bi.5.6.2.13.1.8 Screed ( First Floor) 4
project-power bi.5.6.2.13.13 Retaining Wall Footing to GF 8
project-power bi.5.6.5 Area 05 91
project-power bi.5.6.5.4 Substructure Works 55
project-power bi.5.6.5.4.12 subsoil Perforated Pipes 5
project-power bi.5.6.5.4.1 Blinding Concrete Works 6
project-power bi.5.6.5.4.2 Isolated Concrete Foundation Wo 8
project-power bi.5.6.5.4.3 Concrete Column Neck Works 5
project-power bi.5.6.5.4.11 Concrete Shear Wall /Sumpit Fou 8
project-power bi.5.6.5.4.4 Concrete Tie Beam Works 6
project-power bi.5.6.5.4.8 MEP Works 3
project-power bi.5.6.5.4.9 Mechanical Backfill Works 4
project-power bi.5.6.5.4.10 Slab on Grade Works 6
project-power bi.5.6.5.4.5 Asphalt Paving Works (Work by Su 4
project-power bi.5.6.5.13 Superstructure Works 36
project-power bi.5.6.5.13.15 Ground Floor EL +15.40 18
project-power bi.5.6.5.13.15.1Column -Basement to Ground Flo 5
project-power bi.5.6.5.13.15.2Beams - Ground Floor 6
project-power bi.5.6.5.13.15.3Hollow Core - Ground Floor 3
project-power bi.5.6.5.13.15.4Screed (Ground Floor) 4
project-power bi.5.6.5.13.1 First Floor EL +22.40 18
project-power bi.5.6.5.13.1.5 Column - Ground Floor to First Flo 5
project-power bi.5.6.5.13.1.6 Beams - 1st Floor 6
project-power bi.5.6.5.13.1.7 Hollow Core - 1st Floor 3
project-power bi.5.6.5.13.1.8 Screed ( First Floor) 4
project-power bi.5.13 Other's Substructures 25
project-power bi.5.13.11 Construction of Manhole 3
project-power bi.5.13.13 Ramp & Staircase 22
project-power bi.5.13.13.4 Stair Case 18
project-power bi.5.13.13.1 Ramp 4
project-power bi.5.3 Demobilization 5
project-power bi.5.3.1 As Built & Close Out Reprt 4
project-power bi.5.3.7 Project Completion 1
stages Description
GEN GENERAL
ENG ENGINEERING
PRC PROCURMENT
MOB MOBALIZTION
subsoil subsoil -perforeted pipes
sub RC foundation
MEP MEP
BAS BASEMENT +10.00
GR GROUND FLOOR +15.40
1ST 1ST FLOOR +22.40
2ND ROOF FLOOR +28.50
SKY SKYLIGHT
STL STEEL ROOF
TANKS TANKS
LO LEFTOVER WORK
RM RAMPS &STAIRCASE
CL CLOSING
Areas Description
P1A1 Phase-1 Area1
P1A2 Phase-1 Area 2
P1A3 Phase-1 Area 3
P1A4 Phase-1 Area 4
P1A5 Phase-1 Area 5
Major BOQ Items. Description
5.1.2.3 Backfilling footings / Walls
5.1.4.1 Termite Control
5.1.5.1 Bitumenous coat
5.1.5.2 40mm thick wearing base course
5.1.5.3 60 mm thick intermediate base
5.1.5.4 80mm thick basecourse
5.1.6.1 0.3 mm polyethylene sheets.
5.1.6.2 Membrane 4 mm thk.
5.2.1.1 Plain Concrete 50 mm thick
5.2.1.2 Plain Concrete 100 mm thick
5.2.2.1.1 Mall R.C Footing
5.2.2.1.2 Hotel raft R.C Footing
5.2.2.1.3 Tie Beams
5.2.2.1.4 R.C Walls&celing for tanks
5.2.2.1.5 R.C Walls for Basment
5.2.2.1.6 Slab on grade
5.2.2.2.1 Columns and sher walls for shopping mall
5.2.2.2.2. Beams &beam ledge
5.2.4 Post tension slabs
5.2.5.1,2,3,4 hollow core slab
5.3.1.1&2 skylight & steel framing Works
MEP MEP First Fix
Cum Cum Late
Planned Total Budgeted Budgeted Budgeted Cum Late Labor
DATE Cost Total Cost Labor Units Labor Units Labor Units Units
1-Dec-20 0.00% 0.00% 0.00% 0.00%
2-Dec-20 0.00% 0.00% 0.00% 0.00%
3-Dec-20 0.00% 0.00% 0.00% 0.00%
4-Dec-20 0.00% 0.00% 0.00% 0.00%
5-Dec-20 0.00% 0.00% 0.00% 0.00%
6-Dec-20 0.00% 0.00% 0.00% 0.00%
7-Dec-20 0.00% 0.00% 0.00% 0.00%
8-Dec-20 0.00% 0.00% 0.00% 0.00%
9-Dec-20 0.00% 0.00% 0.00% 0.00%
10-Dec-20 0.00% 0.00% 0.00% 0.00%
11-Dec-20 0.00% 0.00% 0.00% 0.00%
12-Dec-20 0.04% 0.04% 0.00% 0.00%
13-Dec-20 0.08% 0.04% 0.00% 0.00%
14-Dec-20 0.11% 0.04% 0.00% 0.00%
15-Dec-20 0.12% 0.01% 0.00% 0.00%
16-Dec-20 0.13% 0.01% 0.00% 0.00%
17-Dec-20 0.14% 0.01% 0.00% 0.00%
18-Dec-20 0.14% 0.00% 0.00% 0.00%
19-Dec-20 0.14% 0.01% 0.00% 0.00%
20-Dec-20 0.15% 0.01% 0.00% 0.00%
21-Dec-20 0.18% 0.03% 0.00% 0.00%
22-Dec-20 0.20% 0.03% 0.00% 0.00%
23-Dec-20 0.23% 0.03% 0.00% 0.00%
24-Dec-20 0.30% 0.07% 0.00% 0.00%
25-Dec-20 0.30% 0.00% 0.00% 0.00%
26-Dec-20 $187,833.33 $187,833.33 0.73% 0.43% 0.00% 0.00%
27-Dec-20 $187,833.33 $375,666.67 1.11% 0.38% 0.00% 0.00%
28-Dec-20 $187,833.33 $563,500.00 1.50% 0.39% 0.00% 0.00%
29-Dec-20 $563,500.00 1.52% 0.02% 0.00% 0.00%
30-Dec-20 $563,500.00 1.56% 0.04% 0.00% 0.00%
31-Dec-20 $563,500.00 1.60% 0.04% 0.00% 0.00%
1-Jan-21 $563,500.00 1.60% 0.00% 0.00% 0.00%
2-Jan-21 $563,500.00 1.65% 0.04% 0.00% 0.00%
3-Jan-21 $563,500.00 1.68% 0.04% 0.00% 0.00%
4-Jan-21 $563,500.00 1.72% 0.04% 0.00% 0.00%
5-Jan-21 $563,500.00 1.75% 0.03% 0.00% 0.00%
6-Jan-21 $563,500.00 1.79% 0.04% 0.00% 0.00%
7-Jan-21 $563,500.00 1.84% 0.05% 0.00% 0.00%
8-Jan-21 $563,500.00 1.84% 0.00% 0.00% 0.00%
9-Jan-21 $362,250.00 $925,750.00 2.49% 0.65% 0.00% 0.00%
10-Jan-21 $603,750.00 $1,529,500.00 3.63% 1.14% 0.00% 0.00%
11-Jan-21 $241,500.00 $1,771,000.00 4.17% 0.54% 0.00% 0.00%
12-Jan-21 $343,425.51 $2,114,425.51 5.01% 0.84% 0.00% 0.00%
13-Jan-21 $101,925.51 $2,216,351.02 5.36% 0.36% 0.00% 0.00%
14-Jan-21 $64,004.16 $2,280,355.18 5.59% 0.23% 0.00% 0.00%
15-Jan-21 $2,280,355.18 5.59% 0.00% 0.00% 0.00%
16-Jan-21 $666,018.45 $2,946,373.63 7.44% 1.85% 0.00% 0.00%
17-Jan-21 $526,278.50 $3,472,652.13 8.90% 1.45% 0.00% 0.00%
18-Jan-21 $474,670.76 $3,947,322.89 10.32% 1.43% 0.00% 0.00%
19-Jan-21 $3,947,322.89 10.42% 0.10% 0.00% 0.00%
20-Jan-21 $704,375.00 $4,651,697.89 11.38% 0.96% 0.00% 0.00%
21-Jan-21 $704,375.00 $5,356,072.89 12.44% 1.06% 0.00% 0.00%
22-Jan-21 $5,356,072.89 12.44% 0.00% 0.00% 0.00%
23-Jan-21 $5,356,072.89 12.59% 0.15% 0.00% 0.00%
24-Jan-21 $268,517.95 $5,624,590.84 13.41% 0.82% 0.00% 0.00%
25-Jan-21 $268,517.95 $5,893,108.78 14.26% 0.85% 0.00% 0.00%
26-Jan-21 $395,999.67 $6,289,108.45 15.42% 1.16% 0.00% 0.00%
27-Jan-21 $6,289,108.45 15.71% 0.29% 0.00% 0.00%
28-Jan-21 $266,199.30 $6,555,307.75 16.25% 0.54% 0.00% 0.00%
29-Jan-21 $6,555,307.75 16.25% 0.00% 0.00% 0.00%
30-Jan-21 $421,045.98 $6,976,353.73 17.04% 0.79% 0.00% 0.00%
31-Jan-21 $176,941.98 $7,153,295.71 17.58% 0.55% 0.00% 0.00%
1-Feb-21 $54,502.02 $7,207,797.73 17.97% 0.38% 0.00% 0.00%
2-Feb-21 $108,450.00 $7,316,247.73 18.42% 0.45% 0.00% 0.00%
3-Feb-21 $404,880.00 $7,721,127.73 19.10% 0.68% 0.00% 0.00%
4-Feb-21 $296,430.00 $8,017,557.73 19.55% 0.45% 0.00% 0.00%
5-Feb-21 $8,017,557.73 19.55% 0.00% 0.00% 0.00%
6-Feb-21 $1,306.44 $8,018,864.17 19.92% 0.37% 0.00% 0.00%
7-Feb-21 $199,062.79 $8,217,926.96 20.72% 0.79% 0.00% 0.00%
8-Feb-21 $538,312.79 $8,756,239.75 22.11% 1.39% 0.00% 0.00%
9-Feb-21 $372,520.27 $9,128,760.02 23.21% 1.10% 0.00% 0.00%
10-Feb-21 $33,270.27 $9,162,030.29 23.99% 0.78% 0.00% 0.00%
11-Feb-21 $116,573.18 $9,278,603.47 24.87% 0.88% 0.00% 0.00%
12-Feb-21 $9,278,603.47 24.87% 0.00% 0.00% 0.00%
13-Feb-21 $34,766.74 $9,313,370.21 25.53% 0.65% 0.03% 0.03%
14-Feb-21 $34,766.74 $9,348,136.94 26.18% 0.65% 0.06% 0.03%
15-Feb-21 $252,036.66 $9,600,173.61 27.08% 0.90% 0.08% 0.03%
16-Feb-21 $217,269.93 $9,817,443.53 27.97% 0.89% 0.14% 0.06%
17-Feb-21 $64,483.13 $9,881,926.65 28.40% 0.43% 0.20% 0.06%
18-Feb-21 $65,563.53 $9,947,490.19 28.70% 0.30% 0.23% 0.03%
19-Feb-21 $9,947,490.19 28.70% 0.00% 0.23% 0.00%
20-Feb-21 $792,413.44 $10,739,903.6 30.18% 1.47% 0.27% 0.03%
21-Feb-21 $792,413.44 $11,532,317.0 31.72% 1.54% 0.30% 0.03%
22-Feb-21 $4,320.41 $11,536,637.4 32.44% 0.72% 0.32% 0.02%
23-Feb-21 $4,320.41 $11,540,957.8 33.22% 0.78% 0.35% 0.02%
24-Feb-21 $7,467.71 $11,548,425.5 33.72% 0.50% 0.37% 0.02%
25-Feb-21 $6,387.31 $11,554,812.9 34.22% 0.50% 0.40% 0.03%
26-Feb-21 $11,554,812.9 34.22% 0.00% 0.40% 0.00%
27-Feb-21 $6,387.31 $11,561,200.2 34.72% 0.50% 0.42% 0.03%
28-Feb-21 $60,574.46 $11,621,774.6 35.28% 0.56% 0.45% 0.03%
1-Mar-21 $47,573.41 $11,669,348.0 35.78% 0.51% 1.09% 0.64%
2-Mar-21 $47,573.41 $11,716,921.4 36.28% 0.50% 1.73% 0.64%
3-Mar-21 $47,573.41 $11,764,494.8 36.79% 0.50% 1.78% 0.05%
4-Mar-21 $594,634.39 $12,359,129.2 38.10% 1.31% 1.82% 0.05%
5-Mar-21 $12,359,129.2 38.10% 0.00% 1.82% 0.00%
6-Mar-21 $562,598.29 $12,921,727.5 39.63% 1.53% 1.86% 0.04%
7-Mar-21 $45,034.25 $12,966,761.8 40.11% 0.48% 2.39% 0.53%
8-Mar-21 $186,486.95 $13,153,248.7 40.45% 0.34% 3.09% 0.70%
9-Mar-21 $159,149.15 $13,312,397.9 40.77% 0.32% 3.94% 0.85%
10-Mar-21 $14,549.15 $13,326,947.0 40.84% 0.07% 4.58% 0.64%
11-Mar-21 $12,389.15 $13,339,336.2 40.91% 0.07% 5.04% 0.46%
12-Mar-21 $13,339,336.2 40.91% 0.00% 5.04% 0.00%
13-Mar-21 $19,560.32 $13,358,896.5 41.00% 0.09% 5.53% 0.49%
14-Mar-21 $29,213.67 $13,388,110.2 41.14% 0.13% 5.95% 0.41%
15-Mar-21 $268,928.34 $13,657,038.5 41.29% 0.15% 7.61% 1.67%
16-Mar-21 $257,115.84 $13,914,154.3 41.63% 0.34% 9.00% 1.39%
17-Mar-21 $238,449.93 $14,152,604.3 42.25% 0.62% 9.63% 0.63%
18-Mar-21 $227,401.34 $14,380,005.6 43.01% 0.76% 9.92% 0.29%
19-Mar-21 $14,380,005.6 43.01% 0.00% 9.92% 0.00%
20-Mar-21 $227,401.34 $14,607,406.9 43.56% 0.55% 10.18% 0.26%
21-Mar-21 $352,225.96 $14,959,632.9 44.16% 0.61% 10.45% 0.26%
22-Mar-21 $344,639.78 $15,304,272.7 44.77% 0.61% 10.56% 0.12%
23-Mar-21 $369,415.28 $15,673,688.0 45.50% 0.72% 10.68% 0.12%
24-Mar-21 $363,874.25 $16,037,562.2 46.54% 1.04% 11.05% 0.37%
25-Mar-21 $371,958.27 $16,409,520.5 47.47% 0.93% 11.17% 0.12%
26-Mar-21 $16,409,520.5 47.47% 0.00% 11.17% 0.00%
27-Mar-21 $99,934.08 $16,509,454.5 47.83% 0.36% 11.32% 0.14%
28-Mar-21 $99,934.08 $16,609,388.6 48.44% 0.61% 11.58% 0.27%
29-Mar-21 $9,079.83 $16,618,468.5 48.89% 0.45% 12.42% 0.84%
30-Mar-21 $11,837.31 $16,630,305.8 49.13% 0.24% 13.19% 0.76%
31-Mar-21 $11,837.31 $16,642,143.1 49.34% 0.21% 13.77% 0.59%
1-Apr-21 $8,018.08 $16,650,161.2 49.55% 0.21% 14.70% 0.93%
2-Apr-21 $16,650,161.2 49.55% 0.00% 14.70% 0.00%
3-Apr-21 $11,834.78 $16,661,995.9 49.77% 0.22% 16.11% 1.41%
4-Apr-21 $16,760.87 $16,678,756.8 49.99% 0.22% 17.31% 1.20%
5-Apr-21 $276,689.21 $16,955,446.0 50.50% 0.51% 17.99% 0.68%
6-Apr-21 $289,529.89 $17,244,975.9 51.00% 0.49% 18.84% 0.86%
7-Apr-21 $72,629.89 $17,317,605.8 51.26% 0.26% 19.76% 0.92%
8-Apr-21 $148,545.02 $17,466,150.8 52.05% 0.79% 20.22% 0.45%
9-Apr-21 $17,466,150.8 52.05% 0.00% 20.22% 0.00%
10-Apr-21 $69,300.27 $17,535,451.1 53.04% 0.99% 20.97% 0.75%
11-Apr-21 $67,312.95 $17,602,764.0 53.88% 0.84% 21.63% 0.66%
12-Apr-21 $125,323.01 $17,728,087.1 54.67% 0.79% 22.80% 1.17%
13-Apr-21 $270,807.83 $17,998,894.9 55.37% 0.70% 23.97% 1.17%
14-Apr-21 $82,977.10 $18,081,872.0 55.88% 0.50% 25.07% 1.10%
15-Apr-21 $90,612.26 $18,172,484.2 56.45% 0.57% 25.63% 0.56%
16-Apr-21 $18,172,484.2 56.45% 0.00% 25.63% 0.00%
17-Apr-21 $294,162.26 $18,466,646.5 57.38% 0.93% 26.41% 0.78%
18-Apr-21 $406,830.01 $18,873,476.5 58.78% 1.40% 27.13% 0.72%
19-Apr-21 $74,081.23 $18,947,557.7 59.57% 0.80% 28.67% 1.54%
20-Apr-21 $100,414.96 $19,047,972.7 60.26% 0.69% 30.54% 1.87%
21-Apr-21 $100,414.96 $19,148,387.7 60.91% 0.64% 31.44% 0.90%
22-Apr-21 $95,893.63 $19,244,281.3 61.62% 0.71% 32.02% 0.58%
23-Apr-21 $19,244,281.3 61.62% 0.00% 32.02% 0.00%
24-Apr-21 $95,893.63 $19,340,174.9 62.48% 0.86% 32.31% 0.30%
25-Apr-21 $95,893.63 $19,436,068.6 63.38% 0.90% 32.64% 0.33%
26-Apr-21 $150,118.63 $19,586,187.2 64.35% 0.97% 32.94% 0.31%
27-Apr-21 $123,784.90 $19,709,972.1 65.17% 0.81% 33.18% 0.23%
28-Apr-21 $746,672.17 $20,456,644.3 67.28% 2.11% 33.42% 0.24%
29-Apr-21 $1,870.36 $20,458,514.6 68.37% 1.09% 33.96% 0.55%
30-Apr-21 $20,458,514.6 68.37% 0.00% 33.96% 0.00%
1-May-21 $162,779.14 $20,621,293.8 69.24% 0.87% 34.50% 0.54%
2-May-21 $169,123.14 $20,790,416.9 69.90% 0.66% 35.12% 0.61%
3-May-21 $16,529.14 $20,806,946.0 70.15% 0.25% 35.66% 0.54%
4-May-21 $413,655.19 $21,220,601.2 71.46% 1.31% 35.85% 0.19%
5-May-21 $16,529.14 $21,237,130.4 71.74% 0.28% 36.08% 0.23%
6-May-21 $4,203.20 $21,241,333.6 72.06% 0.32% 36.54% 0.46%
7-May-21 $21,241,333.6 72.06% 0.00% 36.54% 0.00%
8-May-21 $4,203.20 $21,245,536.8 72.20% 0.14% 37.09% 0.55%
9-May-21 $19,696.00 $21,265,232.8 72.45% 0.26% 37.54% 0.44%
10-May-21 $91,996.00 $21,357,228.8 73.05% 0.60% 38.17% 0.63%
11-May-21 $91,996.00 $21,449,224.8 73.93% 0.88% 39.02% 0.85%
12-May-21 $19,696.00 $21,468,920.8 74.77% 0.84% 40.10% 1.08%
13-May-21 $23,685.18 $21,492,605.9 75.47% 0.69% 40.89% 0.79%
14-May-21 $21,492,605.9 75.47% 0.00% 40.89% 0.00%
15-May-21 $935.18 $21,493,541.1 75.98% 0.52% 41.66% 0.77%
16-May-21 $935.18 $21,494,476.3 76.49% 0.51% 42.27% 0.61%
17-May-21 $935.18 $21,495,411.5 77.00% 0.51% 43.50% 1.23%
18-May-21 $13,778.69 $21,509,190.2 77.44% 0.44% 45.14% 1.64%
19-May-21 $266,828.69 $21,776,018.9 77.65% 0.21% 46.40% 1.26%
20-May-21 $217,328.69 $21,993,347.6 78.26% 0.61% 46.96% 0.56%
21-May-21 $21,993,347.6 78.26% 0.00% 46.96% 0.00%
22-May-21 $217,328.69 $22,210,676.3 78.88% 0.61% 47.63% 0.68%
23-May-21 $13,778.69 $22,224,454.9 79.16% 0.28% 48.36% 0.73%
24-May-21 $13,778.69 $22,238,233.6 79.47% 0.32% 48.82% 0.46%
25-May-21 $22,238,233.6 79.51% 0.04% 49.33% 0.51%
26-May-21 $38,304.75 $22,276,538.4 79.61% 0.10% 49.89% 0.56%
27-May-21 $38,304.75 $22,314,843.1 79.79% 0.18% 50.48% 0.59%
28-May-21 $22,314,843.1 79.79% 0.00% 50.48% 0.00%
29-May-21 $38,304.75 $22,353,147.9 79.97% 0.18% 51.01% 0.54%
30-May-21 $54,878.79 $22,408,026.7 80.21% 0.24% 51.48% 0.47%
31-May-21 $60,513.75 $22,468,540.4 80.50% 0.28% 51.84% 0.36%
1-Jun-21 $57,743.23 $22,526,283.7 80.93% 0.44% 52.38% 0.54%
2-Jun-21 $82,011.60 $22,608,295.3 81.32% 0.39% 52.92% 0.53%
3-Jun-21 $61,155.48 $22,669,450.7 81.88% 0.57% 53.36% 0.44%
4-Jun-21 $22,669,450.7 81.88% 0.00% 53.36% 0.00%
5-Jun-21 $12,000.00 $22,681,450.7 82.44% 0.56% 54.07% 0.71%
6-Jun-21 $124,231.63 $22,805,682.4 83.33% 0.89% 54.97% 0.90%
7-Jun-21 $124,231.63 $22,929,914.0 84.04% 0.71% 55.68% 0.71%
8-Jun-21 $22,929,914.0 84.41% 0.37% 56.60% 0.92%
9-Jun-21 $22,929,914.0 84.80% 0.39% 57.18% 0.58%
10-Jun-21 $22,929,914.0 85.13% 0.33% 57.74% 0.56%
11-Jun-21 $22,929,914.0 85.13% 0.00% 57.74% 0.00%
12-Jun-21 $198,841.85 $23,128,755.8 85.74% 0.62% 58.43% 0.69%
13-Jun-21 $370,395.40 $23,499,151.2 86.78% 1.04% 59.40% 0.97%
14-Jun-21 $125,113.10 $23,624,264.3 87.30% 0.52% 61.03% 1.63%
15-Jun-21 $125,113.10 $23,749,377.4 87.79% 0.49% 62.27% 1.24%
16-Jun-21 $23,749,377.4 87.88% 0.09% 62.94% 0.67%
17-Jun-21 $23,749,377.4 87.97% 0.09% 63.74% 0.80%
18-Jun-21 $23,749,377.4 87.97% 0.00% 63.74% 0.00%
19-Jun-21 $23,749,377.4 88.03% 0.06% 64.32% 0.59%
20-Jun-21 $60,920.00 $23,810,297.4 88.08% 0.05% 66.24% 1.92%
21-Jun-21 $23,810,297.4 88.13% 0.05% 67.27% 1.03%
22-Jun-21 $23,810,297.4 88.17% 0.05% 68.21% 0.93%
23-Jun-21 $23,810,297.4 88.22% 0.05% 68.76% 0.55%
24-Jun-21 $23,810,297.4 88.27% 0.05% 69.40% 0.64%
25-Jun-21 $23,810,297.4 88.27% 0.00% 69.40% 0.00%
26-Jun-21 $23,810,297.4 88.31% 0.04% 69.95% 0.56%
27-Jun-21 $23,810,297.4 88.35% 0.04% 70.57% 0.62%
28-Jun-21 $23,810,297.4 88.39% 0.04% 71.28% 0.71%
29-Jun-21 $30,460.00 $23,840,757.4 88.41% 0.02% 71.96% 0.68%
30-Jun-21 $30,460.00 $23,871,217.4 88.44% 0.02% 73.16% 1.20%
1-Jul-21 $23,871,217.4 88.50% 0.06% 74.33% 1.18%
2-Jul-21 $23,871,217.4 88.50% 0.00% 74.33% 0.00%
3-Jul-21 $23,871,217.4 88.56% 0.06% 74.97% 0.63%
4-Jul-21 $23,871,217.4 88.62% 0.06% 75.98% 1.01%
5-Jul-21 $23,871,217.4 88.68% 0.06% 76.78% 0.80%
6-Jul-21 $23,871,217.4 88.74% 0.06% 77.13% 0.35%
7-Jul-21 $60,920.00 $23,932,137.4 88.79% 0.05% 77.56% 0.43%
8-Jul-21 $229,374.83 $24,161,512.3 89.63% 0.84% 78.18% 0.62%
9-Jul-21 $24,161,512.3 89.63% 0.00% 78.18% 0.00%
10-Jul-21 $229,374.83 $24,390,887.1 90.47% 0.84% 78.93% 0.75%
11-Jul-21 $229,374.83 $24,620,261.9 91.31% 0.84% 79.66% 0.73%
12-Jul-21 $32,255.84 $24,652,517.7 91.48% 0.16% 80.61% 0.94%
13-Jul-21 $32,255.84 $24,684,773.6 91.64% 0.16% 81.36% 0.75%
14-Jul-21 $179,199.08 $24,863,972.7 92.47% 0.84% 82.21% 0.85%
15-Jul-21 $179,199.08 $25,043,171.8 93.31% 0.84% 82.70% 0.49%
16-Jul-21 $25,043,171.8 93.31% 0.00% 82.70% 0.00%
17-Jul-21 $194,429.08 $25,237,600.8 94.13% 0.83% 83.21% 0.51%
18-Jul-21 $51,310.21 $25,288,911.0 94.37% 0.24% 84.01% 0.79%
19-Jul-21 $36,080.21 $25,324,991.3 94.58% 0.21% 84.91% 0.90%
20-Jul-21 $36,080.21 $25,361,071.5 94.79% 0.21% 85.79% 0.88%
21-Jul-21 $20,361.44 $25,381,432.9 94.91% 0.12% 86.27% 0.48%
22-Jul-21 $20,361.44 $25,401,794.4 95.03% 0.12% 86.73% 0.46%
23-Jul-21 $25,401,794.4 95.03% 0.00% 86.73% 0.00%
24-Jul-21 $20,361.44 $25,422,155.8 95.14% 0.12% 87.34% 0.61%
25-Jul-21 $31,760.64 $25,453,916.4 95.28% 0.14% 87.77% 0.43%
26-Jul-21 $31,760.64 $25,485,677.1 95.42% 0.14% 88.21% 0.43%
27-Jul-21 $22,945.71 $25,508,622.8 95.63% 0.21% 88.64% 0.44%
28-Jul-21 $22,945.71 $25,531,568.5 95.84% 0.21% 89.08% 0.44%
29-Jul-21 $22,945.71 $25,554,514.2 96.05% 0.21% 89.51% 0.44%
30-Jul-21 $25,554,514.2 96.05% 0.00% 89.51% 0.00%
31-Jul-21 $14,126.29 $25,568,640.5 96.22% 0.16% 89.73% 0.21%
1-Aug-21 $14,126.29 $25,582,766.8 96.38% 0.16% 89.94% 0.21%
2-Aug-21 $14,126.29 $25,596,893.1 96.55% 0.16% 90.15% 0.21%
3-Aug-21 $30,187.50 $25,627,080.6 96.67% 0.12% 90.32% 0.17%
4-Aug-21 $30,187.50 $25,657,268.1 96.79% 0.12% 90.48% 0.17%
5-Aug-21 $30,187.50 $25,687,455.6 96.91% 0.12% 90.64% 0.16%
6-Aug-21 $25,687,455.6 96.91% 0.00% 90.64% 0.00%
7-Aug-21 $30,187.50 $25,717,643.1 97.03% 0.12% 90.81% 0.16%
8-Aug-21 $13,350.00 $25,730,993.1 97.12% 0.09% 90.94% 0.13%
9-Aug-21 $13,350.00 $25,744,343.1 97.22% 0.09% 91.05% 0.12%
10-Aug-21 $13,350.00 $25,757,693.1 97.31% 0.09% 91.17% 0.12%
11-Aug-21 $13,350.00 $25,771,043.1 97.40% 0.09% 91.32% 0.15%
12-Aug-21 $13,350.00 $25,784,393.1 97.49% 0.09% 91.47% 0.15%
13-Aug-21 $25,784,393.1 97.49% 0.00% 91.47% 0.00%
14-Aug-21 $13,350.00 $25,797,743.1 97.58% 0.09% 91.63% 0.15%
15-Aug-21 $13,350.00 $25,811,093.1 97.67% 0.09% 91.78% 0.15%
16-Aug-21 $13,350.00 $25,824,443.1 97.76% 0.09% 92.17% 0.40%
17-Aug-21 $2,700.00 $25,827,143.1 97.78% 0.02% 92.49% 0.31%
18-Aug-21 $2,700.00 $25,829,843.1 97.80% 0.02% 92.80% 0.31%
19-Aug-21 $2,700.00 $25,832,543.1 97.82% 0.02% 93.11% 0.31%
20-Aug-21 $25,832,543.1 97.82% 0.00% 93.11% 0.00%
21-Aug-21 $2,700.00 $25,835,243.1 97.84% 0.02% 93.41% 0.31%
22-Aug-21 $2,700.00 $25,837,943.1 97.86% 0.02% 93.85% 0.43%
23-Aug-21 $2,700.00 $25,840,643.1 97.89% 0.02% 94.27% 0.43%
24-Aug-21 $10,062.50 $25,850,705.6 97.96% 0.08% 94.75% 0.48%
25-Aug-21 $10,062.50 $25,860,768.1 98.04% 0.08% 95.23% 0.48%
26-Aug-21 $10,062.50 $25,870,830.6 98.11% 0.08% 96.22% 0.99%
27-Aug-21 $25,870,830.6 98.11% 0.00% 96.22% 0.00%
28-Aug-21 $10,062.50 $25,880,893.1 98.19% 0.08% 96.36% 0.14%
29-Aug-21 $152,830.75 $26,033,723.8 98.20% 0.01% 96.37% 0.01%
30-Aug-21 $26,033,723.8 98.20% 0.01% 96.38% 0.01%
31-Aug-21 $26,033,723.8 98.21% 0.01% 96.38% 0.01%
1-Sep-21 $26,033,723.8 98.22% 0.01% 96.39% 0.01%
2-Sep-21 $26,033,723.8 98.23% 0.01% 96.40% 0.01%
3-Sep-21 $26,033,723.8 98.23% 0.00% 96.40% 0.00%
4-Sep-21 $26,033,723.8 98.24% 0.01% 96.41% 0.01%
5-Sep-21 $26,033,723.8 98.24% 0.01% 96.41% 0.01%
6-Sep-21 $26,033,723.8 98.25% 0.01% 96.42% 0.01%
7-Sep-21 $26,033,723.8 98.26% 0.01% 96.43% 0.01%
8-Sep-21 $26,033,723.8 98.27% 0.01% 96.44% 0.01%
9-Sep-21 $26,033,723.8 98.27% 0.01% 96.45% 0.01%
10-Sep-21 $26,033,723.8 98.27% 0.00% 96.45% 0.00%
11-Sep-21 $26,033,723.8 98.28% 0.01% 96.45% 0.01%
12-Sep-21 $26,033,723.8 98.29% 0.01% 96.46% 0.01%
13-Sep-21 $26,033,723.8 98.30% 0.01% 96.47% 0.01%
14-Sep-21 $26,033,723.8 98.31% 0.01% 96.48% 0.01%
15-Sep-21 $26,033,723.8 98.31% 0.01% 96.48% 0.01%
16-Sep-21 $26,033,723.8 98.32% 0.01% 96.49% 0.01%
17-Sep-21 $26,033,723.8 98.32% 0.00% 96.49% 0.00%
18-Sep-21 $26,033,723.8 98.33% 0.01% 96.50% 0.01%
19-Sep-21 $26,033,723.8 98.34% 0.01% 96.51% 0.01%
20-Sep-21 $26,033,723.8 98.34% 0.01% 96.51% 0.01%
21-Sep-21 $26,033,723.8 98.35% 0.01% 96.52% 0.01%
22-Sep-21 $26,033,723.8 98.36% 0.01% 96.53% 0.01%
23-Sep-21 $26,033,723.8 98.37% 0.01% 96.54% 0.01%
24-Sep-21 $26,033,723.8 98.37% 0.00% 96.54% 0.00%
25-Sep-21 $26,033,723.8 98.37% 0.01% 96.55% 0.01%
26-Sep-21 $26,033,723.8 98.38% 0.01% 96.55% 0.01%
27-Sep-21 $26,033,723.8 98.39% 0.01% 96.56% 0.01%
28-Sep-21 $26,033,723.8 98.40% 0.01% 96.57% 0.01%
29-Sep-21 $26,033,723.8 98.41% 0.01% 96.58% 0.01%
30-Sep-21 $7,641.54 $26,041,365.4 98.43% 0.03% 96.60% 0.03%
1-Oct-21 $26,041,365.4 98.43% 0.00% 96.60% 0.00%
2-Oct-21 $7,641.54 $26,049,006.9 98.46% 0.03% 96.63% 0.03%
3-Oct-21 $7,641.54 $26,056,648.4 98.49% 0.03% 96.66% 0.03%
4-Oct-21 $7,641.54 $26,064,290.0 98.52% 0.03% 96.69% 0.03%
5-Oct-21 $7,641.54 $26,071,931.5 98.54% 0.03% 96.72% 0.03%
6-Oct-21 $17,830.25 $26,089,761.8 98.60% 0.06% 96.77% 0.06%
7-Oct-21 $17,830.25 $26,107,592.0 98.66% 0.06% 96.83% 0.06%
8-Oct-21 $26,107,592.0 98.66% 0.00% 96.83% 0.00%
9-Oct-21 $17,830.25 $26,125,422.3 98.72% 0.06% 96.89% 0.06%
10-Oct-21 $17,830.25 $26,143,252.5 98.77% 0.06% 96.94% 0.06%
11-Oct-21 $17,830.25 $26,161,082.8 98.83% 0.06% 97.00% 0.06%
12-Oct-21 $17,830.25 $26,178,913.0 98.89% 0.06% 97.06% 0.06%
13-Oct-21 $17,830.25 $26,196,743.3 98.94% 0.06% 97.11% 0.06%
14-Oct-21 $17,830.25 $26,214,573.5 99.00% 0.06% 97.17% 0.06%
15-Oct-21 $26,214,573.5 99.00% 0.00% 97.17% 0.00%
16-Oct-21 $27,000.10 $26,241,573.6 99.10% 0.10% 97.27% 0.10%
17-Oct-21 $27,000.10 $26,268,573.7 99.20% 0.10% 97.38% 0.10%
18-Oct-21 $27,000.10 $26,295,573.8 99.31% 0.10% 97.48% 0.10%
19-Oct-21 $27,000.10 $26,322,573.9 99.41% 0.10% 97.58% 0.10%
20-Oct-21 $27,000.10 $26,349,574.0 99.50% 0.09% 97.67% 0.09%
21-Oct-21 $27,000.10 $26,376,574.1 99.60% 0.09% 97.77% 0.09%
22-Oct-21 $26,376,574.1 99.60% 0.00% 97.77% 0.00%
23-Oct-21 $27,000.10 $26,403,574.2 99.69% 0.09% 97.86% 0.09%
24-Oct-21 $9,169.84 $26,412,744.1 99.74% 0.05% 97.94% 0.08%
25-Oct-21 $9,169.84 $26,421,913.9 99.78% 0.05% 98.05% 0.11%
26-Oct-21 $471,510.42 $26,893,424.3 99.87% 0.09% 98.21% 0.16%
27-Oct-21 $462,340.58 $27,355,764.9 99.91% 0.04% 98.49% 0.28%
28-Oct-21 $462,340.58 $27,818,105.5 99.96% 0.04% 99.22% 0.73%
29-Oct-21 $27,818,105.5 99.96% 0.00% 99.22% 0.00%
30-Oct-21 $462,340.58 $28,280,446.1 100.00% 0.04% 100.00% 0.78%