Professional Documents
Culture Documents
Reports to the GPS -Wind Site Manager through the Lead TA and works for GE
Renewables as an advisor to the customer/ installer during receiving and installation of
major components.. Ensures the work is performed in accordance with GE Renewables'
established procedures.
Duties include:
• Adheres to and/or implements Safety Procedures/protocols issued to the site that affect his/her
scope of responsibilities in accordance with the Wind EHS Outage Pion.
• Participates in LOTO process as required/directed
• Adheres to Quality processes
• Assists and advises the Customer to ensure mechanical and electrical installation, as well as final
Inspections, are performed in accordance with the installation Guidelines
•
Responsible for reporting issues that affect safety and schedule via the latest online GE
communication tool for corrective action
• Ensures follow-up corrective actions are implemented on all issues in accordance with the
communicated directive.
• Ensure contents of Job Site Books are complete and 100% accurate
• Provide information for E-DSR where required as defined by communication Guideline
• Responsible
• for maintaining the assigned vehicle in a responsible manner
• While assigned to a project, represent GE in a responsible manner with integrity and by exercising
good judgment, both during work hours and off work hours. Manage time and assigned resources
responsibly to ensure successful completion of the site goals and objectives.