You are on page 1of 3

Tong operator

Hamaz Ali khan


MOB=0092-3435922510 PAk
Email Address: hamza.khan867@yahoo.com

Career Objective:-

To Join Dynamic and Challenging Organization Where I can Perform as per My


Professional Skills with Full Commitment Searching To Join With Highly Skilled
Team of Professionals and Try to Groom the Organization With my Internal Abilities,
Professional and Communication Skills in Oil Field..I Also fully Committed to
working Safely in Accordance with Company Health, Safety & Environmental
Policies and Procedures, and Be Responsible for the safe Working Practices of the
Crew.

WORK EXPERIENCE:-

Working as a Tabular runningervice operator with OGDCL ( onshore


operations) Pakistan Sep 2021 till now.
 Worked as an Tong operator With Expro onshore & offshore ( UAE )
13th November 2019 to July 2021.

 Worked as an floorman With Hilong Group of Companies ( onshore


Operations ) (Pakistan) from Jan 2019 August 2019.

PROFESSIONAL TRAINING & COURSES

T bosiet
Drill String Management
BOP M/I/T
Rigging & Slinging
Mud Conditioning Equipment
Gas Tester
Defensive Driving
Opito H2S B/A
Permit to Work Holder
Electrical Safety
Fire Fighting
Hazardous Materials
Health & Hygiene
Noise/Nuisance
STOP Training Course
First Aid & CPR
Eye & Hearing Conservation Training Course
LOTO (Lock Out Tag Out)
Work at Height
Workshop Safety
Hazard Identification
Breathing Apparatus
Rig Floor Safety
Dropped Object Prevention
Fork Lift Operator Offshore

QUALIFICATION:-
 Secondary school

PERSONAL DATA:-

Passport No : YP412312 (Exp Date) November 2027


Nationality : Pakistani
Marital Status : Single

LANGUAGES:
 English,Urdu,Hindi

RESPONSIBILITIES
 Preparation of BHA of Tally Book.
 Collect all Diagrams of BHA.
 Maintenance of Equipment and Inventory.
 Assist During tripping drill pipe including and/or assist Derrick man and relieve the
driller, while supervised, in operation of draw works and other equipment.
 Assist in running and cementing of casing.
 Prepare BHA and Rig Floor Equipment of tripping, casing and cementing operation.
 Assist Driller in other drilling operations.
 Assist in training of drill crew.
 Maintain good communication with the Driller, Rig Superintendent and other
departments.
 Assist with PMS.
Equipment Worked With:
 NOV st100 Iron Roughneck 120,000 ft/ Ibs up to 9 ½” OD.
 CRT Casing Running Tool
 Stand Handler II, for making Stand Capacity 25 Tons
 Wirth 375 Hydraulic Driller Operated Rotary Table
 Air Operated Driller Control Elevator
 Hydraulic Operated rig floor reachable catwalk
 Iron roughneck TM 120 vices

You might also like