You are on page 1of 25

Ground Floor

Covered Pathway :
FF-4
WF-10
CF-9

Drop Off :
FF-4
WF-5
CF-6

PWD Ramp :
FF-1
WF-10
CF-6

Side walk :
FF-3
WF-5
CF-6

Main Lobby :
FF-9
A
D
WF-3
CF-1

Reception :
FF-9
A
WF-3
CF-1

Office :
FF-9
B
WF-3
CF-1
Elevator Lobby :
FF-9
A
D
WF-3
CF-1

Mail Room :
FF-9
B
WF-3
CF-1

Common Toilet :
FF-8
B
WF-7
CF-3
(Anti-Bacterial Grout, Water Proofing)

Telco 1 & 2 :
FF-2
A
WF-3
CF-1

MDF (Main Distribution Frame) :


FF-2
A
WF-3
CF-4

FCC (Fire Command Frame) :


FF-5
A
WF-3
CF-4

EE / AUX :
FF-5
A
WF-3
CF-5

Utility Service Hallway :


FF-2
A
WF-3
CF-1

Driveway :
FF-1
D
WF-5
CF-6

Driveway Slope :
FF-1
D
WF-5
CF-5

Parking Area :
FF-1
D
WF-3
CF-6

Genset Room :
FF-2
C
C
WF-1
CF-6

Transformer Room :
FF-2
C
C
WF-1
CF-6

Fire Stairs 1&2 :


FF-4
C
C
WF-3
CF-6
2nd - 10th Residential Level

Elevator Lobby :
FF-9
A
D
WF-3
CF-1

Storage :
FF-5
B
WF-4
WF-10
CF-4

AUX :
FF-5
B
WF-3
CF-1

MCR (Meter Center Room) And EE Room :


FF-5
C
C
WF-4
CF-4

House Keeping Room :


FF-9
A
WF-3
CF-4
(Anti-Bacterial Grout, Water Proofing)

Garbage Room :
FF-9
A
WF-10
CF-4
(Anti-Bacterial Grout, Water Proofing)

Residential Units - Bedroom :


FF-7
WF-11
CF-1

Residential Units - Living :


FF-9
B
WF-11
CF-1

Residential Units - Kitchen / Dinning :


FF-9
B-2
B
WF-11
CF-1

Residential Units - Shower Area :


FF-8
B
WF-7
WF-11
CF-3
(Anti-Bacterial Grout, Water Proofing)

Residential Units - Toilet :


FF-8
B
WF-7
WF-11
CF-3
(Anti-Bacterial Grout, Water Proofing)

Residential Units - Balcony :


FF-8
A
WF-3
CF-8
(Non-Skid Floor Finish)

Residential Units - Hallway :


FF-9
B
WF-3
CF-1

Fire Stairs 1 & 2 :


FF-4
C
C
WF-3
CF-6
(Non-Skid Floor Finish)

WP019812

cf-1 painted finish


cf-2 painted finish
cf-3 painted finish
cf-4 concrete finish (mdf, fcc)
cf-5 painted finish
cf-6 painted finish
cf-7 painted finish
cf-8 painted finish
cf-9 painted finish
ff-1 plain cement
ff-2 plain cement with dustproofing
ff-3 plain cement with hardener
ff-4 plain cement non-skid
ff-5 plain cement with epoxy
ff-6 plain cement with epoxy and waterproofing
ff-7 tiles
ff-8 tiles
ff-9 tiles
ff-10 tiles
11th - 12th Residential Level Roof Deck

Elevator Lobby : Elevator Lobby :


FF-9 FF-10
A A
D D
WF-3 WF-4
CF-1 CF-1
(Waterproofing Membrane)
Storage :
FF-5 Water Tank Area :
B FF-6
WF-10 (Waterproofing Membrane)
CF-4
Fire Stairs 1 & 2 :
AUX : FF-4
FF-5 B
B WF-4
WF-3 CF-4
CF-1
Roof Deck :
MCR AND EE ROOM : FF-6
FF-5 A
C D
C WF-4
D CF-1
WF-4 (Waterproofing Membrane)
CF-4

House Keeping Room :


FF-9
A
WF-3
CF-4
(Anti - Bacterial Grout, Water Proofing)

Garbage Room :
FF-9
A
WF-10
CF-4
(Anti - Bacterial Grout, Water Proofing)

Residential Units - Bedroom :


FF-7
WF-11
CF-1

Residential Units - Living :


FF-7
D
WF-11
CF-1

Residential Units - Kitchen / Dinning :


FF-7
B-2
B
WF-11
CF-1

Residential Units - Shower Area :


FF-8
B
WF-7
WF-11
CF-3
(Anti-Bacterial Grout, Water Proofing)

Residential Units - Toilet :


FF-8
B
WF-7
WF-11
CF-3
(Anti-Bacterial Grout, Water Proofing)

Residential Units - Balcony :


FF-8
B
WF-3
CF-8
(Non-Skid Floor Finish)

Residential Units - Hallway :


FF-8
B
WF-3
CF-1

Fire Stairs 1 & 2 :


FF-4
A
C
C
WF-3
CF-6
(Non-Skid Floor Finish)

painted finish
painted finish
painted finish
concrete finish (mdf, fcc)
painted finish
painted finish
painted finish
painted finish
painted finish
plain cement
plain cement with dustproofing
plain cement with hardener
plain cement non-skid
plain cement with epoxy
plain cement with epoxy and waterproofing
tiles
tiles
tiles
tiles
GROUND LEVEL

Pump Room :
FF-6
F
WF-10
CF-6
(Water Proofing)

Domestic Water Tank 1&2 :


FF-6
F
WF-10
CF-6

Fire Tank 1 & 2 :


FF-6
F
WF-10
CF-6

Sewage Holding Tank :


FF-6
F
WF-10
CF-6

Fire Stairs 1 & 2 :


FF-4
E
WF-3
CF-6
Covered Pathway :
FF-4 plain cement non-skid
CF-9 painted finish
Drop Off :
FF-4 plain cement non-skid
CF-6 painted finish
PWD Ramp :
FF-1 plain cement
CF-6 painted finish
Side walk :
FF-3 plain cement with hardener
CF-6 painted finish
Main Lobby :
FF-9 tiles
CF-1 painted finish
Reception :
FF-9 tiles
CF-1 painted finish
Office :
FF-9 tiles
CF-1 painted finish
Elevator Lobby :
FF-9 tiles
CF-1 painted finish
Mail Room :
FF-9 tiles
CF-1 painted finish
Common Toilet :
FF-8 tiles
CF-3 painted finish
Telco 1 & 2 :
FF-2 plain cement with dustproofing
CF-1 painted finish
MDF (Main Distribution Frame) :
FF-2 plain cement with dustproofing
CF-4 concrete finish (mdf, fcc)
FCC (Fire Command Frame) :
FF-5 plain cement with epoxy
CF-4 concrete finish (mdf, fcc)
EE / AUX :
FF-5 plain cement with epoxy
CF-5 painted finish
Utility Service Hallway :
FF-2 plain cement with dustproofing
CF-1 painted finish
Driveway :
FF-1 plain cement
CF-6 painted finish
Driveway Slope :
FF-1 plain cement
CF-5 painted finish
Parking Area :
FF-1 plain cement
CF-6 painted finish
Genset Room :
FF-2 plain cement with dustproofing
CF-6 painted finish
Transformer Room :
FF-2 plain cement with dustproofing
CF-6 painted finish
Fire Stairs 1&2 :
FF-4 plain cement non-skid
CF-6 painted finish
cf-1 painted finish
cf-2 painted finish
cf-3 painted finish
cf-4 concrete finish (mdf, fcc)
cf-5 painted finish
cf-6 painted finish
cf-7 painted finish
cf-8 painted finish
cf-9 painted finish
ff-1 plain cement
ff-2 plain cement with dustproofing
ff-3 plain cement with hardener
ff-4 plain cement non-skid
ff-5 plain cement with epoxy
ff-6 plain cement with epoxy and waterproofing
ff-7 tiles
ff-8 tiles
ff-9 tiles
ff-10 tiles
aterproofing